SCHEDULES

SCHEDULE 1SCHEDULED WORKS

Articles 2(1) and 4

(1)

(2)

(3)

Area

Number of Work

Description of work

In the London Boroughs of Newham and Greenwich

Work No. 1

A railway (2,533 metres in length), mainly located in two parallel bored tunnel structures, commencing at a junction with the proposed DLR Silvertown and London City Airport Extension at the centre of the proposed King George V station, passing eastwards and descending, then passing south-eastwards below Woodman Street, the junction of Albert Road, Woodman Street and Bargehouse Road, Grimsby Grove, and the River Thames, then turning southwards and rising, passing below Tom Cribb Road, then turning south-westwards and continuing to rise, passing under Plumstead Road and Maxey Road, then turning westwards under Burrage Road, Parry Place, the British Telecom access road and car park and the Network Rail Woolwich Arsenal station down passenger platform, then turning north-westwards under Taylor’s Buildings, Woolwich New Road and terminating at a point under the intersection of Greens End with Powis Street in Woolwich town centre, the first section of tunnel (1,975 metres in length) being under part of North Woolwich, the River Thames, the Royal Arsenal site and the eastern part of Woolwich, commencing 252 metres from the commencement of this work and terminating 15 metres west of Parry Place, 2,227 metres from the commencement of this work, the second section of tunnel (74 metres in length) being under the British Telecom telephone exchange access road and car park and Network Rail down passenger platform, commencing 90 metres west of Parry Place, 2,304 metres from the commencement of this work and terminating 22 metres east of Taylor’s Buildings, 2,378 metres from the commencement of this work and the third section of tunnel (109 metres in length) being under part of Woolwich Town Centre, commencing 23 metres west of Taylor’s Buildings, 2,424 metres from the commencement of this work and terminating at the termination point of this work, including sections of bored and cut and cover tunnel, intermittent cross passage tunnels between the two parallel bored tunnel structures and tunnel boring machine launch and reception chambers.

In the London Borough of Newham

Work No. 2

A road (380 metres in length) being a realignment of the extension of Hartmann Road, commencing at a point 492 metres west of its junction with Albert Road and Woolwich Manor Way, passing eastwards and terminating at a point 111 metres west of its junction with Albert Road and Woolwich Manor Way.

 

Work No. 3

A temporary jetty structure (300 metres in length) in King George V Dock commencing 350 metres west of the eastern end of the dock, passing eastwards and terminating 50 metres west of the east end of the dock.

 

Work No. 4

A temporary access bridge and conveyor (110 metres in length) from King George V Dock to the adjacent dock side land, commencing at an intersection with Work No. 3, 77 metres west of the eastern end of King George V Dock, passing south-eastwards and terminating at a point 75 metres north-west of the intersection of Albert Road, Woolwich Manor Way, the extension of Hartmann Road and Fishguard Way.

In the London Borough of Greenwich

Work No. 5

An intervention shaft and cross passage structure (68 metres in length) commencing at a point 89 metres north-east of the junction between Argyle Road and Marlborough Road and 4 metres above existing ground level, descending 36 metres vertically and then turning through 90 degrees and passing horizontally eastwards and terminating at an intersection with Work No.1, 1,255 metres from the commencement of that work, including a surface building and underground ventilation and drainage adits and cross passage tunnel structures,

 

Work No. 6

An access road (16 metres in length) commencing at a point on the north-east side of Marlborough Road 95 metres north-east of its intersection with Argyle Road, passing north-east across Work No. 8 and terminating 16 metres from its commencement.

 

Work No. 7

A footway (120 metres in length), being a realignment of the existing riverside footway, commencing at a point 43 metres north-east of the junction between Marlborough Road and Argyle Road, passing eastwards, then following the circumference of the intervention shaft in Work No. 5 in a clockwise manner, passing south-eastwards, then north-eastwards and terminating at a junction with the existing footpath 121 metres north-east of the junction between Marlborough Road and Argyle Road.

 

Work No. 8

A cycleway (99 metres in length), being a realignment of the existing riverside cycleway, commencing at a point 32 metres north-east of the junction between Marlborough Road and Argyle Road, passing eastwards to the south of the intervention shaft in Work No. 5, crossing Work No. 6, passing south-eastwards, then north-eastwards and terminating at a junction with the existing cycleway 121 metres north-east of the junction between Marlborough Road and Argyle Road.

 

Work No. 9

A road (215 metres in length), commencing at the junction between Marlborough Road and Argyle Road, passing north-eastwards, then south-eastwards and terminating at a point on Cadogan Road 105 metres south-east of its junction with Argyle Road.

 

Work No. 10

A temporary railway passenger platform (238 metres in length) commencing at the country (east) end of the existing Network Rail Woolwich Arsenal station down passenger platform, passing eastwards under Burrage Road and terminating at a point 10 metres west of Maxey Road.

 

Work No. 11

A temporary footbridge (14 metres in length) commencing at a point 23 metres west of Burrage Road on the north side of Network Rail’s North Kent Railway Line, passing southwards over Work No. 10 and the North Kent railway line, and terminating at a point 25 metres west of Burrage Road on the south side of the North Kent line.

 

Work No. 12

A temporary access ramp (118 metres in length) commencing at a point on the west side of Burrage Road, 46 metres south of its junction with Spray Street and Burrage Grove, passing eastwards and descending and then turning south and terminating at an intersection with Work No. 10 at a point 158 metres from the commencement of that work.

 

Work No. 13

An access road (30 metres in length) commencing at a point on the east side of Parry Place 23 metres south of its junction with Spray Street, passing eastwards and terminating 30 metres from its commencement.

 

Work No. 14

An access road (185 metres in length), being a replacement of the existing British Telecom telephone exchange access road, commencing at a point on the east side of Taylor’s Buildings 36 metres south of its junction with Spray Street, passing south-east eastwards past the south-west side of the existing telephone exchange building, then passing eastwards and terminating at a point on the west side of Parry Place 20 metres south of its junction with Spray Street.

 

Work No. 15

An access road (20 metres in length) commencing at a point on the north-west side of Taylor’s Buildings 34 metres south of its junction with Spray Street, passing north-westwards and terminating at a point 20 metres from its commencement.

 

Work No. 16

A footbridge (20 metres in length) commencing at a point 10 metres east of the south end of Taylor’s Buildings on the north side of Network Rail’s Woolwich Arsenal station down passenger platform, passing southwards over Network Rail’s North Kent Railway Line, and terminating at a point 28 metres north-west of the junction between Helen Street and Vincent Road on the south side of Woolwich Arsenal station up passenger platform.

 

Work No. 17

A road (123 metres in length) being a realignment of the existing Woolwich New Road, commencing at a junction with the existing road 10 metres south-west of its junction with Vincent Road and General Gordon Place, passing north-eastwards and terminating at a point on the existing road 26 metres north-east of its junction with Spray Street.

 

Work No. 18

A temporary road (110 metres in length), being a temporary diversion of the existing Woolwich New Road, commencing 18 metres north-east of its junction with General Gordon Place and Vincent Road, passing north-eastwards, then northwards and terminating at a point 32 metres north of the junction between Spray Street and Woolwich New Road.

 

Work No. 19A

A sewer (109 metres in length) being a diversion of part of the existing sewer which passes below Burrage Road, commencing underground at a junction with the existing Thames Water Southern Outfall Sewer No. 2 at a location 12 metres east of Burrage Road and 10 metres south of Arthur Grove, passing north-westwards below Arthur Grove and Burrage Road to a point at the east end of Woolwich Arsenal station car park, 15 metres west of Burrage Road, passing westwards below the car park, then southwards below Vincent Road, to terminate at a point under Vincent Road 35 metres west of its intersection with Burrage Road, including the construction of vertical access shaft structures, the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations and works to stop up the existing sewer between the junction of Burrage Road with Vincent Road and the junction of Burrage Road with Spray Street.

 

Work No. 19B

A sewer (8 metres in length) being a diversion of part of the existing sewer which passes below Burrage Road, commencing at a point under Burrage Road 3 metres south of its intersection with Arthur Grove passing northwards below Burrage Road and Arthur Grove and terminating at an intersection with Work No. 19A at a point 5 metres east of the junction between Burrage Road and Arthur Grove, including the construction of vertical access shaft structures, and the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations.

 

Works No. 20

A sewer (151 metres in length), being a diversion of the existing sewer which passes below Woolwich New Road and Beresford Square Market Place, commencing underground at a point 40 metres north-east of the junction between Woolwich New Road, General Gordon Place and Vincent Road, passing south-eastwards below Woolwich New Road to the south east side of the existing Woolwich New Road then passing north-eastwards below Work No. 1 to a point 15 metres south of the junction between Woolwich New Road and Spray Street, then passing north-westwards below Woolwich New Road and Beresford Square Market Place to a point 62 metres north-east of the junction between Greens End and Powis Street, then turning north-eastwards to terminate underground at a junction with the existing Thames Water Southern Outfall Sewer No. 1, 71 metres north-east of the junction between Greens End and Powis Street, including the construction of vertical access shaft structures, the diversion of secondary sewage pipes connecting into the main sewer at intermediate locations, and works to temporarily line and then stop up the existing sewer between a point 40 metres north of the junction between Woolwich New Road, General Gordon Place and Vincent Road and its junction with the Southern Outfall Sewer No. 1 at a point 73 metres north-east of the junction between Greens End and Powis Street.