SCHEDULETHE SCHEDULED WORKS

Articles 2(1), 3(1) and (2) and 4

1

The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Clacton-on-Sea in the district of Tendring, county of Essex—

a

up to 30 wind turbine generators fixed to the seabed by up to four piles for each wind turbine and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following reference points—

Wind turbine number

Reference Point Easting

Reference Point Northing

1

620259

208141

2

621150

206647

3

620937

207023

4

620717

207392

5

620497

207763

6

620992

208646

7

623927

210669

8

624814

209182

9

624591

209553

10

624371

209924

11

624151

210297

12

623193

210164

13

624080

208675

14

623860

209044

15

623641

209415

16

623419

209783

17

622459

209658

18

623346

208168

19

623125

208539

20

622906

208911

21

622682

209283

22

621726

209152

23

622614

207660

24

622393

208032

25

622174

208404

26

621951

208777

27

621881

207154

28

621663

207525

29

621442

207894

30

621222

208261

b

a substation at reference point 622794E, 209097N with a height of 42 metres above the level of high water and a span of 24 metres (accommodating transformers, switch gear, back-up generators and other technical installations);

c

a network of cables buried under the seabed connecting the wind turbines to the substation, to run in direct lines as follows—

  • between the wind turbines numbered 2, 3, 4, 5, 1, 6, 22, 17, 21 and the substation,

  • between the wind turbines numbered 28, 29, 30 and 6,

  • between the wind turbines numbered 27, 23, 24, 25, 26 and 21,

  • between the wind turbines numbered 18, 19, 20 and the substation,

  • between the wind turbines numbered 13, 14, 15, 16, 12 and 17, and

  • between the wind turbines numbered 8, 9, 10, 11, 7 and 12;

d

a cable buried at a depth of 3 metres below the level of the seabed connecting the substation to the shore, commencing by a connection with that substation then proceeding in a north-north-westerly direction until it reaches the shore at Holland-on-Sea at reference point 621460E, 216855N.

2

In this schedule references to the location of a wind turbine or the substation are references to the centre point of that turbine or substation.