Articles 2(1), 3(1) and (2) and 4

SCHEDULETHE SCHEDULED WORKS

1.  The works which the undertaker is authorised to construct and maintain by article 3(1) are the following works on the bed of the North Sea adjoining the coast at Clacton-on-Sea in the district of Tendring, county of Essex—

(a)up to 30 wind turbine generators fixed to the seabed by up to four piles for each wind turbine and extending to a height of up to 130.5 metres above the level of high water, fitted with rotating blades with a diameter of up to 110 metres and situated at the following reference points—

Wind turbine numberReference Point EastingReference Point Northing
1620259208141
2621150206647
3620937207023
4620717207392
5620497207763
6620992208646
7623927210669
8624814209182
9624591209553
10624371209924
11624151210297
12623193210164
13624080208675
14623860209044
15623641209415
16623419209783
17622459209658
18623346208168
19623125208539
20622906208911
21622682209283
22621726209152
23622614207660
24622393208032
25622174208404
26621951208777
27621881207154
28621663207525
29621442207894
30621222208261

(b)a substation at reference point 622794E, 209097N with a height of 42 metres above the level of high water and a span of 24 metres (accommodating transformers, switch gear, back-up generators and other technical installations);

(c)a network of cables buried under the seabed connecting the wind turbines to the substation, to run in direct lines as follows—

  • between the wind turbines numbered 2, 3, 4, 5, 1, 6, 22, 17, 21 and the substation,

  • between the wind turbines numbered 28, 29, 30 and 6,

  • between the wind turbines numbered 27, 23, 24, 25, 26 and 21,

  • between the wind turbines numbered 18, 19, 20 and the substation,

  • between the wind turbines numbered 13, 14, 15, 16, 12 and 17, and

  • between the wind turbines numbered 8, 9, 10, 11, 7 and 12;

(d)a cable buried at a depth of 3 metres below the level of the seabed connecting the substation to the shore, commencing by a connection with that substation then proceeding in a north-north-westerly direction until it reaches the shore at Holland-on-Sea at reference point 621460E, 216855N.

2.  In this schedule references to the location of a wind turbine or the substation are references to the centre point of that turbine or substation.