Introductory Text
1.This Order may be cited as the A2 Trunk Road...
2.In this Order— (a) all measurements of distance are measured...
3.The slip road shall become a trunk road from the...
4.The centre line of the trunk road is indicated by...
Signature
SCHEDULE
ROUTE OF THE SLIP ROAD
The route of the slip road is about 720 metres...