The Docklands Light Railway (Capacity Enhancement) Order 2005

2.  In this Schedule—

“C2C” means C2C Limited and includes its successors from time to time;

“SET” means South Eastern Trains Limited and includes its successors from time to time;

“construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;

“the engineer” means an engineer appointed by Network Rail Infrastructure Limited for the purposes of this Order;

“EWS” means English Welsh and Scottish Railway Limited and includes its successors from time to time;

“network licence” means the network licence, as the same is amended from time to time, granted to Network Rail (then called Railtrack PLC) by the Secretary of Sate in exercise of his powers under section 8 of the 1993 Act;

“Network Rail” means Network Rail Infrastructure Limited and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 736 of the Companies Act 1985(1)) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;

“plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;

“railway operational procedures” means procedures specified under any access agreement (as defined in the 1993 Act) or station lease;

“railway property” means any railway belonging to Network Rail Infrastructure Limited and—

(a)

any station, land, works, apparatus and equipment belonging to Network Rail Infrastructure Limited and directly related to any such railway; and

(b)

any easement or other property interest held by or for the benefit of Network Rail and directly related to any such railway;

“relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction or failure of a specified work or any such act or omission as mentioned in paragraph 14(1).

“specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property; and

“train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the 1993 Act.