Search Legislation

The Railways (Interoperability) Regulations 2006

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Paragraph 4

 Help about opening options

Alternative versions:

Status:

This version of this provision is prospective. Help about Status

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Railways (Interoperability) Regulations 2006. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Prospective

TECHNICAL FILEU.K.

This section has no associated Explanatory Memorandum

4.  The technical file accompanying the declaration of verification must be made up as follows:

  • for infrastructure: engineering-structure plans, approval records for excavations and reinforcement, testing and inspection reports on concrete;

  • for the other subsystems: general and detailed drawings in line with execution, electrical and hydraulic diagrams, control-circuit diagrams, description of data-processing and automatic systems, operating and maintenance manuals, etc.;

  • list of interoperability constituents, as referred to in Article 3 of the High-Speed Directive or Article 3 of the Conventional Directive, incorporated into the subsystem;

  • copies of the EC declarations of conformity or suitability for use with which the abovementioned constituents must be provided in accordance with Article 13 of the High-Speed Directive or Article 13 of the Conventional Directive and accompanied, where appropriate, by the corresponding calculation notes and a copy of the records of the tests and examinations carried out by the notified bodies on the basis of the common technical specifications;

  • the certificate from the notified body responsible for EC verification, accompanied by corresponding calculation notes and countersigned by itself, stating that the project complies with the applicable Directive, and mentioning any reservations recorded during performance of the activities and not withdrawn; the certificate should also be accompanied by the inspection and audit reports drawn up by the same body in connection with its task, as specified in sections 5.3 and 5.4.

Back to top

Options/Help