Power to make works
3.—(1) A.B. Ports may, in the lines and situations shown on the deposited plan and according to the levels shown on the deposited sections, make and maintain the following works on the bed of the river Orwell:-
Work No.1
A new quay extending the existing No.2 Shed Quay commencing at reference point TM16704 42068, then extending into the river in a southerly and then south-easterly direction and terminating at reference point TM 16783 41898 on the existing Power Station quay.
A new quay extending the existing Power Station quay commencing at reference point TM 16850 41772, then extending into the river in a south-easterly direction to reference point TM 17075 41504, and then returning in a north-easterly direction to reference point TM17113 41537 on the existing Ash Lagoon wall.
Work No.2
A new quay extending the existing Power Station quay commencing at reference point TM 16850 41772, then extending into the river in a south-easterly direction to reference point TM 17075 41504, and then returning in a north-easterly direction to reference point TM17113 41537 on the existing Ash Lagoon wall.
(2) A.B. Ports may, within the limits of deviation, from time to time alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the works.
(3) The works shall for all purposes form part of the undertaking.