The Construction (Design and Management) Regulations 2007 (revoked)

Changes over time for: Section 22

 Help about opening options

Version Superseded: 06/04/2015

Alternative versions:

Status:

Point in time view as at 06/04/2007. This version of this provision has been superseded. Help about Status

Close

Status

You are viewing this legislation item as it stood at a particular point in time. A later version of this or provision, including subsequent changes and effects, supersedes this version.

Note the term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.

Changes to legislation:

There are currently no known outstanding effects for the The Construction (Design and Management) Regulations 2007 (revoked), Section 22. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Duties of the principal contractorE+W+S

This section has no associated Explanatory Memorandum

22.—(1) The principal contractor for a project shall—

(a)plan, manage and monitor the construction phase in a way which ensures that, so far as is reasonably practicable, it is carried out without risks to health or safety, including facilitating—

(i)co-operation and co-ordination between persons concerned in the project in pursuance of regulations 5 and 6, and

(ii)the application of the general principles of prevention in pursuance of regulation 7;

(b)liaise with the CDM co-ordinator in performing his duties in regulation 20(2)(d) during the construction phase in relation to any design or change to a design;

(c)ensure that welfare facilities sufficient to comply with the requirements of Schedule 2 are provided throughout the construction phase;

(d)where necessary for health and safety, draw up rules which are appropriate to the construction site and the activities on it (referred to in these Regulations as “site rules”);

(e)give reasonable directions to any contractor so far as is necessary to enable the principal contractor to comply with his duties under these Regulations;

(f)ensure that every contractor is informed of the minimum amount of time which will be allowed to him for planning and preparation before he begins construction work;

(g)where necessary, consult a contractor before finalising such part of the construction phase plan as is relevant to the work to be performed by him;

(h)ensure that every contractor is given, before he begins construction work and in sufficient time to enable him to prepare properly for that work, access to such part of the construction phase plan as is relevant to the work to be performed by him;

(i)ensure that every contractor is given, before he begins construction work and in sufficient time to enable him to prepare properly for that work, such further information as he needs—

(i)to comply punctually with the duty under regulation 13(7), and

(ii)to carry out the work to be performed by him without risk, so far as is reasonably practicable, to the health and safety of any person;

(j)identify to each contractor the information relating to the contractor's activity which is likely to be required by the CDM co-ordinator for inclusion in the health and safety file in pursuance of regulation 20(2)(e) and ensure that such information is promptly provided to the CDM co-ordinator;

(k)ensure that the particulars required to be in the notice given under regulation 21 are displayed in a readable condition in a position where they can be read by any worker engaged in the construction work; and

(l)take reasonable steps to prevent access by unauthorised persons to the construction site.

(2) The principal contractor shall take all reasonable steps to ensure that every worker carrying out the construction work is provided with—

(a)a suitable site induction;

(b)the information and training referred to in regulation 13(4) by a contractor on whom a duty is placed by that regulation; and

(c)any further information and training which he needs for the particular work to be carried out without undue risk to health or safety.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources