Interpretation

2.  In this Order—

“the 1996 Act” means the Channel Tunnel Rail Link Act 1996;

“the excluded works” means such parts of the works authorised by Part 1 of the 1996 Act as are comprised within the description of the Thameslink Completion works set out in the Schedule to this Order;

“the works” means the following works so far as not falling within the excluded works—

(a)

the scheduled works except for Works Nos. 4 and 5R(1),

(b)

Work No. 4B,

(c)

such parts of the works comprised within Works Nos. 4A, 4J, 4K, 4L or 5R as are indicated in blue on the drawings marked “The Channel Tunnel Rail Link (Nomination) Order 1999; drawing no 1” and “The Channel Tunnel Rail Link (Nomination) Order 1999; drawing no 2”, signed by authority of the Secretary of State for the Environment, Transport and the Regions, dated 18th February 1999(2), and

(d)

the works authorised by paragraph 5 of Schedule 2 to the 1996 Act.

(1)

The term “scheduled works” has the meaning given in section 1(1) of the 1996 Act, and references to “Works Nos.” have the meaning given in section 56(3)(b) of that Act.

(2)

Copies of the drawings are available from the Major Projects Directorate, Department for Transport, Great Minster House, 76 Marsham Street, London SW1P 4DR.