PART 2Control of Building Work
Exempt buildings and work9
1
Subject to paragraphs (2) F7F2, (3) and (4) and regulation 21(1), these Regulations do not apply to—
a
the erection of any building or extension of a kind described in Schedule 2; or
b
the carrying out of any work to or in connection with such a building or extension, if after the carrying out of that work it is still a building or extension of a kind described in that Schedule.
2
The requirements of paragraphs G1 and G3(2) and (3) of Schedule 1 apply—
a
to any greenhouse which receives a cold or hot water supply from a source shared with or located inside a dwelling; and
b
to—
i
any small detached building falling within class 6 in Schedule 2; and
ii
any extension of a building falling within class 7 in Schedule 2,
which in either case receives a cold or hot water supply from a source shared with or located inside any building other than a building or extension of a kind described in Schedule 2.
3
The requirements of Part P of Schedule 1 apply to—
b
any small detached building falling within class 6 in Schedule 2; and
c
any extension of a building falling within class 7 in Schedule 2,
which in any case receives its electricity from a source shared with or located inside a dwelling.
F4F54
The requirements of paragraph R1 of Schedule 1 apply to buildings controlled under other legislation falling within class 1 in Schedule 2.
F14
The requirements of paragraph R1 of Schedule 1 apply to buildings falling within paragraphs 1 and 2 of Class 1 (buildings controlled under other legislation) in Schedule 2.