- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
1.—(1) For the protection of the Manchester Ship Canal Company the following provisions of this Part of this Schedule shall, unless otherwise agreed in writing between the undertaker and MSCC, have effect.
(2) In this Part of this Schedule—
“the Bridgewater Canal” means the Bridgewater Canal owned or managed by MSCC or the Bridgewater Canal Company Limited, and includes any works connected with the Bridgewater Canal for the maintenance or operation of which MSCC is responsible and lands held or used by MSCC for the purposes of the Bridgewater Canal;
“the Canals” means the Bridgewater Canal and the Ship Canal;
“construction”, in relation to any specified work or protective work, includes execution, placing, altering, replacing, relaying and removal, and “construct” and “constructed” have corresponding meanings;
“deputy harbour master” means the deputy harbour master appointed by MSCC for the purpose in question;
“detriment” means any physical damage to the Canals wholly or partly caused by the specified works which affects the stability, structure and safety of the Canals and, without limiting the scope of that meaning, includes—
the erosion of the bed, banks or walls of the Canals, or the impairment of the stability of any works or lands forming part of the Canals;
damage to the wall of the Ship Canal caused by excessive weight being placed on the Ship Canal wall;
the silting of the Canals or the deposit of materials in the Canals so as to damage the Canals;
the pollution of the Canals; and
any alteration in the water level of the Canals, or interference with the supply of water to the Canals, or drainage from the Canals;
“the engineer” means an engineer (whether an employee of MSCC or external consultant) appointed by MSCC for the purpose in question;
“exclusion zone” means an area of land extending 20 metres landwards from either bank of the Ship Canal and an area of land extending 3 metres landwards from either bank of the Bridgewater Canal;
“MSCC” means the Manchester Ship Canal Company and its statutory successors;
“plans” includes sections, drawings, specifications, calculations, soil reports, descriptions (including descriptions of methods of construction), risk assessments and method statements but shall not include the design and appearance of the specified works;
“protective work” means a work which is reasonably necessary to be carried out to minimise or prevent detriment constructed under sub-paragraph 5(3)(a);
“the Ship Canal” means the Manchester Ship Canal owned and managed by MSCC, and includes any works connected with the Ship Canal for the maintenance or operation of which MSCC is responsible and lands held or used by MSCC for the purposes of the Ship Canal;
“specified work” means so much of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way affect, the Canals or either of them; and
“weight limit” means the relevant weight limit for any section of the wall of the Ship Canal that may be affected by any specified work or protective work such weight limit to be approved by the engineer in accordance with the provisions of paragraph 5.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: