34.—(1) If, during the construction of any specified work, or within 5 years after the completion of such work, there is caused or created an accumulation or erosion or an alteration to tidal flow or littoral drift which in whole or in part is reasonably attributable to the construction of such work and which causes damage or reasonable expectation of damage, the undertaker shall, if so required by the Agency before or within the period of 5 years after such completion and to the extent that it is so attributable, remedy such accumulation or erosion or alteration to tidal flow or littoral drift in the manner specified in sub-paragraph (4) and, if it refuses to do so, the Agency may itself cause such remedy to be carried out and may recover the reasonable cost of so doing from the undertaker.

(2) Should an accumulation or erosion or alteration of tidal flow or littoral drift which in whole or in part is reasonably attributable to the construction of the specified works arise which causes such damage or reasonable expectation of damage within the said period of 5 years and be required to be remedied in accordance with sub-paragraph (1), any continuation or recurrence of such accumulation or erosion or alteration of tidal flow or littoral drift shall to the extent that it is reasonably attributable to the construction or operation of any specified work be so remedied by the undertaker during the said period of 5 years and at any time subsequently, save that the undertaker’s obligation under this sub-paragraph shall cease in the event that following the remedying of any accumulation or erosion or alteration of tidal flow or littoral drift a period of 5 years elapses without any further accumulation or erosion or alteration of tidal flow or littoral drift reasonably attributable to the construction of the specified works.

(3) In sub-paragraphs (1) and (2) and in paragraph 37 “damage” means, in the context of damage to flood defence capability or operation, any damage affecting the following—

(a)the efficacy of flood defences;

(b)the bed or banks of a river; or

(c)the structure or operation of any outfall, flood or sea defences or any jetty or other structure under the jurisdiction of the Agency for the purposes of the Water Resources Act 1991(1).

(4) For the purposes of sub-paragraphs (1) and (2)—

(a)in the case of an accumulation, the remedy shall be its removal or such protective works or measures as may reasonably be required by the Agency; and

(b)in the case of erosion or alteration of tidal flow or littoral drift, the remedy shall be the carrying out of such reconstruction works and protective works or measures as may reasonably be required by the Agency.

(5) To the extent that the undertaker establishes by surveys, inspections, tests or sampling that such accumulation or erosion or alteration of tidal flow or littoral drift referred to in sub-paragraph (1) or (2) would have been caused in any event by factors other than the construction or operation of a specified work, the undertaker shall not be liable to remedy such accumulation or erosion or alteration of tidal flow.

(6) In carrying out any surveys, inspections, tests or sampling under sub-paragraph (5) the undertaker shall not unreasonably delay the execution of any remedial action required under sub-paragraph (1) or (2).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources