SCHEDULE 2DIVERSION OF POSSIBLE RIGHTS OF WAY
I1PART 1SUBSTITUTED WAYS FOR ALLEGED RIGHTS OF WAY IF SUCH RIGHTS ARE ESTABLISHED
Alleged Rights of Way | Possible diversion or substitute Rights of Way |
---|---|
Alleged footpath (Claim A) between points D3, D4, D5, D6, D7 and D8 | Footpath between points D3, D4, D6, D7 and D8 |
Alleged byway (Claim G) between D9 and D10 | Byway between D9 and D10 |
Alleged footpath (West Bank Claim A to B to C) | Footpath diverted through the flood gate between the points marked D1 and D2 |
Alleged byway (West Bank Claim A to B) | Byway between A and B diverted through the flood gate between points marked D1 and D2 and narrower than otherwise provided for between those points |
I2PART 2PATHS TO BE TEMPORARILY STOPPED UP
Sch. 2 Pt. 2 in force at 7.8.2012, see art. 1
(1) | (2) | (3) |
---|---|---|
Path or street affected | Extent of stopping up | Specified temporary diversion |
Proposed restricted byway 37 | Between E and H and between I and J | Between E,G and H and between I and J |
Byway 38 | Within the limits of deviation | – |
Proposed public footpath 40 | Within the limits of deviation | None, but without prejudice to provision made for proposed restricted byway 37 |
Alleged footpath (Claim A) | Within the limits of deviation | – |
Alleged byway (Claim B) | Within the limits of deviation | – |
Alleged footpath (Claim C) | Within the limits of deviation | – |
Alleged footbath (Claim D) | Within the limits of deviation | – |
Alleged byway (Claim E) | Within the limits of deviation | – |
Alleged footpath (Claim F) | Within the limits of deviation | – |
Alleged byway (Claim G) | Within the limits of deviation | – |
Alleged byway (West Bank Claim byway A to B) | Within the limits of deviation | – |
Alleged footpaths (West Bank Claim footpaths A to B to C) | Within the limits of deviation | – |
Sch. 2 Pt. 1 in force at 7.8.2012, see art. 1