SCHEDULE 1U.K.

[F1PART 4E+W+SInternal Production Control Procedure

25.  The internal production control procedure is a conformity assessment procedure whereby a manufacturer must ensure EEE is manufactured in compliance with the technical documentation and with the applicable requirements of these Regulations.

26.  The technical documentation must—

(a)make it possible to assess the EEE's conformity with the applicable requirements of these Regulations, and must include an adequate analysis and assessment of the risks;

(b)specify the applicable requirements and cover, as far as relevant for the assessment, the design, manufacture and operation of the EEE;

(c)contain, where applicable, at least the following elements—

(i)a general description of the EEE;

(ii)conceptual design and manufacturing drawings and schemes of components, sub-assemblies;

(iii)descriptions and explanations necessary for the understanding of those drawings and schemes, and the operation of the EEE;

(iv)a list of the designated standards applied in full or in part (where applicable specifying the parts which have been applied);

(v)where designated standards have not been applied, descriptions of the solutions adopted to meet the essential requirements, including a list of other relevant technical specifications applied;

(vii)results of design calculations made, examinations carried out and

(viii)test reports.]