PART 1Introductory
Recommendation reports4.
(1)
In these Regulations, a “recommendation report” means recommendations made by an energy assessor for the cost-effective improvement of the energy performance of a building F1....
(2)
A recommendation report made on or after 9th January 2013 must include—
(a)
recommended cost-effective measures that could be carried out in connection with a major renovation of the building envelope or technical building systems;
(b)
recommended cost-effective measures for individual building elements that could be carried out without the necessity for a major renovation of the building envelope or technical building systems;
(c)
an indication as to how the owner or tenant can obtain more detailed information about improving the energy efficiency of the building, including more detailed information about the cost-effectiveness of the recommendations; and
(d)
information on the steps to be taken to implement the recommendations.
(3)
Any cost-effective measure which the energy assessor recommends must be technically feasible for the building to which the recommendation report relates.
(4)
A recommendation report made on or after 9th January 2013 ceases to be valid at the end of the following periods—
(a)
for a report which is included in an energy performance certificate, ten years from the date of that certificate;
(b)
for a report which is required to be held in respect of the building under regulation 14(3)(a)—
(i)
where the F2total useful floor area of the building is over 1,000m2, seven years from the nominated date applying to the report; and
(5)
In this regulation—
F5(a)
“building element” means a controlled service or fitting or a thermal element within the meaning of those expressions in regulation 2(1) and (3) respectively of the Building Regulations 2010.
(b)
“major renovation” means the renovation of a building where more than 25% of the surface area of the building envelope undergoes renovation; and
(c)
“technical building systems” means technical equipment for the heating, cooling, ventilation, hot water, lighting (or for any combination thereof) of a building F6....