PART 1E+WIntroductory

Recommendation reportsE+W

4.—(1) In these Regulations, a “recommendation report” means recommendations made by an energy assessor for the cost-effective improvement of the energy performance of a building F1....

(2) A recommendation report made on or after 9th January 2013 must include—

(a)recommended cost-effective measures that could be carried out in connection with a major renovation of the building envelope or technical building systems;

(b)recommended cost-effective measures for individual building elements that could be carried out without the necessity for a major renovation of the building envelope or technical building systems;

(c)an indication as to how the owner or tenant can obtain more detailed information about improving the energy efficiency of the building, including more detailed information about the cost-effectiveness of the recommendations; and

(d)information on the steps to be taken to implement the recommendations.

(3) Any cost-effective measure which the energy assessor recommends must be technically feasible for the building to which the recommendation report relates.

(4) A recommendation report made on or after 9th January 2013 ceases to be valid at the end of the following periods—

(a)for a report which is included in an energy performance certificate, ten years from the date of that certificate;

(b)for a report which is required to be held in respect of the building under regulation 14(3)(a)—

(i)where the [F2total useful floor area of the building is over 1,000m2, seven years from the nominated date applying to the report; and]

(ii)[F3in the case of any other building, ten years from] the nominated date applying to the report F4....

(5) In this regulation—

[F5(a)“building element” means a controlled service or fitting or a thermal element within the meaning of those expressions in regulation 2(1) and (3) respectively of the Building Regulations 2010.]

(b)major renovation” means the renovation of a building where more than 25% of the surface area of the building envelope undergoes renovation; and

(c)technical building systems” means technical equipment for the heating, cooling, ventilation, hot water, lighting (or for any combination thereof) of a building F6....