[F1Energy performance certificates on constructionE+W
7A.—(1) This regulation applies where—
(a)a building is erected; or
(b)a building is modified so that it has a greater or lesser number of parts designed or altered for separate use than it previously had, where the modification includes the provision or extension of any of the fixed services for heating, hot water, air conditioning or mechanical ventilation.
(2) The person carrying out the building work must—
(a)give an energy performance certificate for the building to the owner of the building;
(b)give to the local authority notice to that effect; and
(c)include in that notice the reference number under which the energy performance certificate has been registered in accordance with regulation 27(4), except in the case of an energy performance certificate issued under regulation 9A (energy performance certificates in respect of excluded buildings).
(3) The energy performance certificate and notice must be given not later than five days after the building work has been completed.]
Textual Amendments
F1Reg. 7A inserted (6.4.2016) by The Energy Performance of Buildings (England and Wales) (Amendment) Regulations 2016 (S.I. 2016/284), regs. 1(2), 5
Modifications etc. (not altering text)
C1 Reg. 7A by applied (with modifications) by S.I. 2010/2215, reg. 20(1)(7) (as amended (6.4.2016) by The Building Regulations &c. (Amendment) Regulations 2016 (S.I. 2016/285), regs. 1(4), 3(3)(c))
C2Reg. 7A applied (with modifications) by S.I. 2010/2215, reg. 20(1)(7) (as amended (W.) (17.6.2016) by The Building Regulations &c. (Amendment) (Wales) Regulations 2016 (S.I. 2016/611), regs. 1(4), 3 (with reg. 1(3))) (as amended (W.) (25.4.2024) by S.I. 2024/447, regs. 1(1), 3(h) (with reg. 6))
C3Reg. 7A applied (with modifications) (E.) (6.4.2024) by The Building (Registered Building Control Approvers etc.) (England) Regulations 2024 (S.I. 2024/110), regs. 1(3), 5(12) (with regs. 44-47)