Sizewell C proposed intake infrastructure
2.—(1) Save for urgent reasons of vessel safety and subject to sub-paragraph (3), the undertaker shall not carry out any of the authorised project (including the placement temporary or otherwise of anchors or moorings) within the areas coloured red on Plan number GWF 888 R3 Rev 3 (BEEMS-MS0345) each being a radius of 250 metres from a central point of—
(a)Intake I3B 650726E 264262N
DMS 52° 13′ 10.045″ N 1° 40′ 9.404″ E; and
(b)Intake I4B 650526E 263361
DMS 52° 12′ 41.271″ N 1° 39′ 56.487″ E.
(2) Save for urgent reasons of vessel safety the undertaker shall not undertake any of the authorised project within the areas coloured orange on Plan number GWF 888 R3 Rev 3 (BEEMS-MS0345) each being a radius of 250 metres to 500 metres from a central point of—
(a)Intake I3B 650726E 264262N
DMS 52° 13′ 10.045″ N 1° 40′ 9.404″ E; and
(b)Intake I4B 650526E 263361
DMS 52° 12′ 41.271″ N 1° 39′ 56.487″ E
without having first submitted to and secured approval from EDF Energy details of the proposed method of working within these areas (such approval not to be unreasonably withheld or delayed) and thereafter the undertaker shall implement the authorised project in full accordance with such approved details.
(3) Nothing in this paragraph shall prevent the passage of vessels within the area specified in sub-paragraph (1) prior to the construction of any works within that location by EDF Energy or the passage of vessels within the area specified in sub-paragraph (2) at any time.