Activity specific conditions

3.—(1) No part of the licensed activities shall commence until (following consultation with the Environment Agency) full details of a scheme for minimising the impact of the water intake system within the River Blyth Estuary on the aquatic environment have been submitted to and approved in writing by the MMO. The submitted scheme shall include—

(a)details of how the water intake system will be protected by a wedge-wire screen with a maximum of 3 millimetres spacing or equivalent system;

(b)details of how the water intake system will minimise the approach velocity of water to the wedge-wired screen or other equivalent system;

(c)details of the concentration of biocides in the water intake system or other equivalent system and how they will be monitored and controlled;

(d)proposals for implementing the scheme in advance of the commencement of commercial operations; and

(e)proposals for monitoring and reporting on the effectiveness of the scheme and, in the event that the scheme does not perform as predicted, a process for any necessary remedial action being approved by the MMO and thereafter implemented within a stated timescale following such approval.

The undertaker shall implement the scheme as approved.

(2) Netting to prevent construction materials/demolition arisings falling into the intertidal mudflats shall be erected prior to and maintained during breaking through of the quay wall into the Blyth Estuary.

(3) The cooling water outfall pipe described as Work No. 1(v) in Schedule 1 to the Order shall only be operated in conjunction with the diffuser described as Work No. 1(w) in Schedule 1 to the Order.

(4) During construction of the cooling water outfall diffuser and foundation spud legs shall be lowered only within the hour before or after the turn of low tide.

(5) The undertaker shall use only marine specification concrete and underwater concreting techniques in the construction of the cooling water outfall diffuser and foundation.

(6) The undertaker shall—

(a)mark and light the licensed activities (including any temporary construction works comprised in the licensed activities) as required by Trinity House, as the MMO directs;

(b)mark the diffuser with an aid to navigation comprising of a yellow pile with a yellow ‘X’ shaped topmark and a Fl (2) Y 10s light or as otherwise required by Trinity House, as the MMO directs;

(c)at all times maintain any aids to navigation to the reasonable satisfaction of Trinity House.

(7) No works for or associated with the construction of the cooling water intake system or with the strengthening of the river wall shall be carried out save in accordance with a silt mitigation scheme which has previously been approved in writing by the MMO. The said scheme shall provide for silt curtains or other effective mechanisms designed to protect the River Blyth Estuary from silt during construction of the said works and for a period of not less than seven days after each of the said works is completed.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources