Introductory Text
1.Citation and commencement
2.Interpretation
3.Development consent etc. granted by the Order
4.Limits of deviation
5.Maintenance of authorised project
6.Operation of electricity generating station
7.Consent to transfer benefit of Order
8.Requirements, appeals etc
9.Public rights of navigation
10.Abatement of works abandoned or decayed
11.Survey of works
12.Deemed licence under the Marine and Coastal Access Act 2009
13.Saving for Trinity House
14.Crown rights
15.Certification of plans etc
16.Arbitration
Signature
SCHEDULE 1
Authorised project
PART 1 Authorised development
1.A nationally significant infrastructure project as defined in sections 14(1)(a)...
2.Associated development
PART 2 Ancillary works
1.(1) Temporary landing places, moorings or other means of accommodating...
PART 3 Requirements
1.Interpretation
2.Time limits
3.Detailed design approval
4.Detailed design parameters
5.Except with the prior written approval of the Secretary of...
6.(1) The total length of the cables comprising Work No....
7.Each monopile foundation forming part of the authorised development shall...
8.Safety management
9.Lighting
10.Aviation safety
11.Provision against danger to navigation
12.Archaeology above mean low water level
13.Ecological management plan above mean low water level
14.Code of construction practice
15.Construction hours
16.Decommissioning
17.Requirement for written approval
18.Amendments to approved details
SCHEDULE 2
Deemed licence under the Marine and Coastal Access Act 2009
PART 1 Interpretation
1.(1) In this Schedule— “the 1990 Act” means the Town...
2.Details of licensed marine activities
PART 2 Licence conditions
1.Design parameters
2.Except with the prior written approval of the Secretary of...
3.(1) The total length of the cables comprising Work No....
4.Notifications and inspections
5.Chemicals, drilling and debris
6.Force majeure
7.Seasonal restrictions
8.In the event that cable installation works take place between...
9.Pre-construction plans and documentation
10.Reporting of engaged agents, contractors and vessels
11.Equipment and operation of vessels engaged in licensed activities
12.Pre-construction baseline
13.Construction monitoring
14.Post construction
15.Amendments to approved details
Explanatory Note