
Print Options
PrintThe Whole
Instrument
PrintThis
Schedule
only
Status:
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Article 4
SCHEDULE 3Deemed approval of matters referred to in requirements
(1)
Site preparation permission condition
| (2)
Order requirement
|
---|
FP14: Ecology: Wildlife Mitigation Measures – Reptiles | P2 |
G37: Historic Environment, Ecology and Landscape: Green Lane - Preservation in situ | P6 |
SP15: Historic Environment: Monitoring of Paleontological Remains | P7 |
SP22: Historic Environment: Scheduled Monument Management Plan | P8 |
FP4 and SP1: Surface water drainage | P10 |
SP2: Drainage: Culvert of Holford Stream | P11 |
SP3: Drainage: Holford Culvert Flood Risk Management Strategy | P12 |
SP11:Geology and Contaminated Land: Contamination Risk Assessment and Implementation | P13 |
SP10: Geology and Contaminated Land: Radiological Monitoring | P16 |
FP7: Vegetation clearance | P17 |
FP1: Ecological Mitigation and Monitoring Plan | P18 |
FP3: Habitat Management Plan | P19 |
SP5: Engineering Details of Foreshore Access Road | P21 |
SP8: Flooding: foreshore access | P23 |
SP9: Flooding / Erosion: Retaining Wall | P24 |
Back to top