
Print Options
PrintThe Whole
Instrument
PrintThe Whole
Schedule
PrintThis
Part
only
Status:
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
PART 2RIGHTS OF WAY CREATED OR IMPROVED
(1)
Area
| (2)
Existing or new right
| (3)
New status
|
---|
Central Bedfordshire | A new combined footpath and cycleway between points N1 and N2 | Footpath with cycle rights |
| A new combined footpath and cycleway between points N3 and N4 | Footpath with cycle rights |
| A new combined footpath and cycleway between points N5 and N6 | Footpath with cycle rights |
| Footpath 72 to be upgraded to include cycle rights between points I1 and I2 | Footpath with cycle rights |
Bedford Borough | Footpath to be upgraded to include cycle rights between points I8 and I9 | Footpath with cycle rights |
Bedford Borough and Central Bedfordshire | Footpath to be upgraded to include cycle rights between points I3 and, thence by a circular route via points I4-I7 to Point I3 | Footpath with cycle rights |
Back to top