PART 1Preliminary

Citation and commencement1

This Order may be cited as the East Anglia ONE Offshore Wind Farm Order 2014 and shall come into force on 7th July 2014.

Interpretation2

1

In this Order—

  • “the 1961 Act” means the Land Compensation Act 19614;

  • “the 1965 Act” means the Compulsory Purchase Act 19655;

  • “the 1980 Act” means the Highways Act 19806;

  • “the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 19817;

  • “the 1990 Act” means the Town and Country Planning Act 19908;

  • “the 1991 Act” means the New Roads and Street Works Act 19919;

  • “the 2004 Act” means the Energy Act 200410;

  • “the 2008 Act” means the Planning Act 200811;

  • “the 2009 Act” means the Marine and Coastal Access Act 200912;

  • “ancillary works” means the ancillary works described in Part 2 of Schedule 1 (ancillary works) and any other works authorised by this Order and which are not development within the meaning of section 32 of the 2008 Act;

  • “authorised development” means the development and associated development described in Part 1 of Schedule 1 (authorised development) and any other development authorised by this Order, which is development within the meaning of section 32 of the 2008 Act;

  • “authorised project” means the authorised development and the ancillary works authorised by this Order;

  • “book of reference” means the book of reference certified by the Secretary of State as the book of reference for the purposes of this Order;

  • “building” includes any structure or erection or any part of a building, structure or erection;

  • CAA” means the Civil Aviation Authority constituted by the Civil Aviation Act 1982;

  • “cable” in respect of any onshore cable shall include direct lay cables and/or cables laid in cable ducts and in respect of any cable whether onshore or offshore shall include fibre optic cables either within the cable or laid alongside;

  • “cable crossings” means the crossing of existing sub-sea cables by the inter-array, interconnecting and/or export cables authorised by this Order together with physical protection measures including concrete mattresses and/or rock placement;

  • “cable ducts” means conduits for the installation of cables;

  • “carriageway” has the same meaning as in the 1980 Act;

  • “commencement” means, in relation to the authorised project seaward of MHWS, the first carrying out of any licensed marine activities authorised by the deemed marine licences, save for pre-construction surveys and monitoring and, in respect of any other part of the authorised project, beginning to carry out any material operation (as defined in section 155 of the 2008 Act) forming part of the authorised project other than operations consisting of site clearance, demolition work, archaeological investigations, environmental surveys, investigations for the purpose of assessing ground conditions, remedial work in respect of any contamination or other adverse ground conditions, diversion and laying of services, erection of any temporary means of enclosure, the temporary display of site notices or advertisements and the words “commence” and “commenced” shall be construed accordingly;

  • “compulsory acquisition notice” means a notice served in accordance with section 134 of the 2008 Act;

  • “connection works” means Works No. 3B to 41 and any related further associated development in connection with those works, including, in relation to cable laying, jointing bays, manholes, kiosks, marker posts and other works associated with cable laying;

  • “construction consolidation site” means a construction site associated with the connection works including hard standings, lay down and storage areas for construction materials and equipment, areas for spoil, areas for vehicular parking, bunded storage areas, areas for welfare facilities including offices and canteen and washroom facilities, workshop facilities and temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;

  • “deemed generation assets marine licence” means the licence set out in Schedule 9 (deemed licence under the Marine and Coastal Access Act 2009 – generation assets) and deemed by article 28 to have been granted under Part 4 of the 2009 Act, by virtue of section 149A of the 2008 Act;

  • “deemed marine licences” means the licence set out in Schedule 9 (deemed licence under the Marine and Coastal Access Act 2009 – generation assets) and the licence set out in Schedule 10 (deemed licence under the Marine and Coastal Access Act 2009 – transmission assets);

  • “deemed transmission assets marine licence” means the licence set out in Schedule 10 (deemed licence under the Marine and Coastal Access Act 2009 – transmission assets) and deemed by article 28 to have been granted under Part 4 of the 2009 Act, by virtue of section 149A of the 2008 Act;

  • “Defence Infrastructure Organisation Safeguarding” means Ministry of Defence Safeguarding, Defence Infrastructure Organisation, Kingston Road, Sutton Coldfield, West Midlands, B75 7RL and any successor body to its functions;

  • “draft written scheme of investigation: archaeology and cultural heritage (offshore)” means the document certified as the draft written scheme of investigation: archaeology and cultural heritage (offshore) by the Secretary of State for the purposes of this Order;

  • “environmental statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order and submitted in support of the application;

  • “further environmental information” means the document certified as the further environmental information by the Secretary of State for the purposes of this Order and submitted in support of the application;

  • “gravity base foundation” means a structure principally of steel, concrete, or steel and concrete which rests on the seabed either due to its own weight with or without added ballast or additional skirts and associated equipment including scour protection, J-tubes, corrosion protection systems and access platforms and equipment;

  • “highway” and “highway authority” have the same meaning as in the 1980 Act;

  • “horizontal directional drilling” includes, for the purposes of this Order, non-trenchless techniques for laying the onshore cables;

  • “horizontal directional drilling compound” means a construction site associated with the connection works where horizontal directional drilling is proposed including hard standings, lay down and storage areas for construction materials and equipment, areas for spoil, areas for vehicular parking, bunded storage areas, areas for welfare facilities including offices and canteen and washroom facilities, wheel washing facilities, workshop facilities and temporary fencing or other means of enclosure and areas for other facilities required for construction purposes;

  • “HVAC offshore collector station” means a platform with one or more decks, whether open or fully clad, accommodating electrical power transformers, low, medium and/or high voltage switch gear, instrumentation, protection and control systems, neutral earthing resistors, reactive compensation, standby electrical generation equipment, fuelling facilities, auxiliary and uninterruptible power supply systems and transformers, accommodation and/or emergency shelter, craneage, metering stations, meteorological equipment, helicopter landing facilities, messing facilities, potable water storage, black water separation equipment, control hub, drainage facilities, access equipment, J-tubes, marking and lighting and other associated equipment and facilities to enable the transmission of electronic communications and for electricity to be collected at, and exported from, the platform;

  • “HVDC offshore converter station” means a platform with one or more decks, whether open or fully clad, accommodating electrical power transformers, AC equipment including phase reactors and AC filters, AC/DC converter with switching devices, DC equipment including DC capacitors and DC filters and associated equipment, switch gear, cooling systems, instrumentation, protection and control systems, standby electrical generation equipment, fuelling facilities, auxiliary and uninterruptible power supply systems and transformers, accommodation and/or emergency shelter, craneage, meteorological equipment, helicopter landing facilities, messing facilities, potable water storage, black water separation equipment, control hub, drainage facilities, access equipment, J-tubes, marking and lighting and other associated equipment and facilities to enable the transmission of electronic communication and the conversion and transmission of electricity;

  • “jacket foundation” means a steel jacket/lattice-type structure constructed of steel which is fixed to the seabed at two or more points with steel pin piles or steel suction buckets and associated equipment including scour protection, J-tubes, corrosion protection systems and access platform(s) and equipment, and “discrete jacket foundation types” shall include pre-piled or post-piled jackets, three-legged or four legged jackets, or straight or battered leg jackets;

  • “land plan” means the plan certified as the land plan by the Secretary of State for the purposes of this Order;

  • LAT” means lowest astronomical tide;

  • “licensed marine activities” means the activities specified in Part 1 of the deemed Marine Licences;

  • “maintain” includes inspect, maintain, repair, adjust and alter, and further includes remove, reconstruct and replace any of the ancillary works in Part 2 of Schedule 1 (Ancillary Works) and any component part of any wind turbine generator, offshore substation or meteorological mast described in Part 1 of Schedule 1 (Authorised Development) (but not including the alteration, removal or replacement of foundations) to the extent assessed in the environmental statement; and “maintenance” shall be construed accordingly;

  • MCA” means the Maritime and Coastguard Agency;

  • “mean high water springs level” or “MHWS” means the highest level which spring tides reach on average over a period of time;

  • “mean low water” or “MLW” means the average height of all low waters above Chart Datum;

  • “meteorological mast” means a mast housing equipment to measure wind speed and other wind characteristics, including a topside housing electrical, communication and associated equipment and marking and lighting;

  • MMO” means the Marine Management Organisation;

  • “monopile foundation” means a steel pile, typically cylindrical, driven and/or drilled into the seabed and associated equipment including scour protection, J-tubes, corrosion protection systems and access platform(s) and equipment;

  • “offshore substation” means a HVAC collector station or a HVDC converter station;

  • “onshore converter station” means onshore converter(s) housed within one or more converter halls and a compound containing electrical equipment including power transformers, switchgear, reactive compensation equipment, harmonic filters, cables, lightning protection masts, control buildings, communications masts, back-up generators, access, fencing and other associated equipment, structures or buildings;

  • “Order land” means the land shown on the land plan which is within the limits of land to be acquired and described in the book of reference;

  • “Order limits” means the limits shown on the works plan within which the authorised project may be carried out, whose grid coordinates seaward of MHWS are set out in paragraph 2 of Part 1 of Schedule 1 and whose grid coordinates landward of MLW are set out in paragraph 3 of Part 1 of Schedule 1;

  • “Order limits boundary coordinates plan” means the document certified as the Order limits boundary coordinates plan by the Secretary of State for the purposes of this Order;

  • “outline access management plan” means the document certified as the outline access management plan by the Secretary of State for the purposes of this Order;

  • “outline Bawdsey bed level monitoring and remediation strategy” means the document certified as the outline Bawdsey bed level monitoring and remediation strategy by the Secretary of State for the purposes of this Order;

  • “outline code of construction practice” means the document certified as the outline code of construction practice by the Secretary of State for the purposes of this Order;

  • “outline converter station design principles statement” means the document certified as the outline converter station design principles statement by the Secretary of State for the purposes of this Order;

  • “outline landscape and ecological management strategy” means the document certified as the outline landscape and ecological management strategy by the Secretary of State for the purposes of this Order;

  • “outline navigation monitoring strategy” means the document certified as the outline navigation monitoring strategy by the Secretary of State for the purposes of this Order;

  • “outline offshore operations and maintenance and monitoring plan” means the document certified as the outline offshore operations and maintenance and monitoring plan by the Secretary of State for the purposes of this Order;

  • “outline skills strategy” means the document certified as the outline skills strategy by the Secretary of State for the purposes of this Order;

  • “outline traffic management plan” means the document certified as the outline traffic management plan by the Secretary of State for the purposes of this Order;

  • “outline travel plan” means the document certified as the outline travel plan by the Secretary of State for the purposes of this Order;

  • “outline written scheme of investigation: archaeology and cultural heritage (onshore)” means the document certified as the outline written scheme of investigation: archaeology and cultural heritage (onshore) by the Secretary of State for the purposes of this Order;

  • “owner”, in relation to land, has the same meaning as in section 7 of the Acquisition of Land Act 198113;

  • “pin piles” means steel cylindrical piles driven and/or drilled into the seabed for fixity of steel jacket foundations;

  • “primary construction consolidation site” means a construction consolidation whose footprint does not exceed the dimensions specified in requirement 10(9)(a);

  • “public rights of way plan” means the plan certified as the public rights of way plan by the Secretary of State for the purposes of this Order;

  • “relevant planning authority” means the district planning authority for the area in which the land to which the relevant provision of this Order applies is situated;

  • “the Requirements” means those matters set out in Part 3 of Schedule 1 (Requirements) to this Order;

  • “secondary construction consolidation site” means a construction consolidation whose footprint does not exceed the dimensions specified in requirement 10(9)(b);

  • “statutory undertakers” means any person falling within section 127(8), 128(5) or 129(2) of the 2008 Act;

  • “street” means a street within the meaning of section 48 of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street;

  • “street authority”, in relation to a street, has the same meaning as in Part 3 of the 1991 Act;

  • “suction buckets” means large diameter steel cylindrical shells which penetrate the seabed assisted by hydrostatic pressure differential for fixity of steel jacket foundations;

  • “suction caisson foundation” means a tubular steel structure which penetrates the seabed assisted by a hydrostatic pressure differential and associated equipment, including scour protection, J-tubes, corrosion protection systems and access platform and equipment;

  • “transition cable jointing bay” means an underground pit where the offshore export cables comprised in Work No. 3A are jointed to the connection works;

  • the tribunal” means the Lands Chamber of the Upper Tribunal;

  • Trinity House” means the Corporation of Trinity House of Deptford Strond;

  • undertakers” means East Anglia ONE Limited;

  • vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in, on or over water and which is at the time in, on or over water;

  • watercourse” includes all rivers, streams, creeks, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or drain;

  • “wind turbine generator” or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation; and

  • “works plan” means the plan certified as the works plan by the Secretary of State for the purposes of the Order.

2

References in this Order to rights over land include references to rights to do or to place and maintain, anything in, on or under land or in the air-space above its surface.

3

All distances, directions and lengths referred to in this Order are approximate, save in respect of the parameters referred to Requirements 3 to 7 and 10 in Part 3, Schedule 1 (Requirements), conditions 1 to 5 in Part 2, Schedule 9 (deemed licence under the Marine and Coastal Access Act 2009 – Generation Assets) and conditions 2 to 5 in Part 2, Schedule 10 (deemed licence under the Marine and Coastal Access Act 2009 – Transmission Assets).

4

Any reference in this Order to a work identified by the number of the work is to be construed as a reference to the work of that number authorised by this Order.

5

References in this Order to points identified by letters are to be construed as references to the points so lettered on the works plan unless otherwise stated.

6

The expression “includes” shall be construed without limitation.