The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Safeguarding

52.—(1) Save in respect of exempt applications, before granting planning permission for development to which this article applies, a relevant planning authority must consult the undertaker.

(2) This article applies to development which—

(a)prior to completion of construction, would be wholly or partly either—

(i)in respect of the locations of proposed tunnels which will form part of the authorised project, within the construction phase safeguarding zone and at a depth of 10 or more metres below existing ground level; and or

(ii)in respect of all other parts of the authorised project, within the construction phase safeguarding zone;

(b)after completion of construction, would be either—

(i)wholly or partly within 6 metres of any tunnel forming part of the authorised project (measured from the inside face of the tunnel on the horizontal and vertical axes through the centre point of the tunnel such that the area subject to this provision is the area falling within the square defined by those horizontal and vertical parameters); or

(ii)wholly or partly within 10 metres (measured horizontally) of the outside structural surface of any shaft or other underground structure forming part of the authorised project but not falling within (b)(i); or

(iii)in all other cases, in the reasonable opinion of the relevant planning authority, having regard to the guidelines provided by the undertaker further to paragraph (3) below, likely to adversely affect the authorised project or its operational integrity.

(3) Paragraph 2(b) is conditional upon the undertaker providing to the relevant planning authority—

(a)notice of completion of construction pursuant to requirement PW16;

(b)‘as built’ drawings of the tunnels and other below ground structures forming part of the authorised project within the relevant planning authority’s area; and

(c)a set of guidelines to which the relevant planning authority can have regard in the discharge of its obligation under paragraph 2(b)(iii).

(4) In the event that the relevant planning authority, in discharging its duty under paragraph (2)(b)(iii) of this article and having had regard to the guidelines issued under paragraph 3(c), is uncertain as to the reasonable likelihood of adverse effects on the authorised project or its operational integrity, then the relevant planning authority shall be under a duty to comply with paragraph (5) as if the development for which planning permission has been applied for falls within paragraph (2)(b).

(5) Where this article requires a relevant planning authority to consult the undertaker before granting planning permission—

(a)they must give the undertaker notice of the application for planning permission (unless the applicant has served a copy of the application on the undertaker), and

(b)they may not determine the application before the end of the period of 21 days, beginning two working days after the relevant planning authority has sent the notice to the undertaker by first class post or by such other means of service which may be agreed with the relevant planning authority, which will be deemed to be the date on which the undertaker receives the notice or copy of the application.

(6) But a relevant planning authority may determine an application during that period if the undertaker has—

(a)made representations to the relevant planning authority about the application, or

(b)notified the relevant planning authority that it does not intend to make representations.

(7) In determining an application for planning permission a relevant planning authority must take into account any representations received in accordance with this article.

(8) The requirement to consult under this article shall be a local land charge.

(9) In this article—

“construction phase safeguarding zone” means the area of land comprising the Order limits;

“exempt applications” means an application for planning permission which relates to development that— (i) consists of an alteration to an existing building, or the change of use of an existing building or land; and (ii) does not involve, or is not likely to involve any construction engineering or other operations below existing ground level; and (iii) is demonstrated by the party applying for such planning permission to the reasonable satisfaction of the relevant planning authority, as not being likely to breach the guidelines referred to at paragraph 3(c) of this article;

“relevant planning authority” means, for the purposes of this article, the planning authority in receipt of an application for planning permission to which this article applies; and

“operation” includes the testing and commissioning of the proposed development.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources