SCHEDULES

Article 2

SCHEDULE 1AUTHORISED PROJECT

PART 1AUTHORISED DEVELOPMENT

A nationally significant infrastructure project as defined in sections 14 and 29(1A) of the Planning Act 2008 (as amended) (‘the Act’) comprising the works described in column (1) of the table below.

Associated development within the meaning of section 115(2) of the Act including the works described in column (2) of the table below.

Table 1

(1)

Works comprising a nationally significant infrastructure project as defined in sections 14 and 29(1A) of the Act

(2)

Works comprising associated development within the meaning of section 115(2) of the Act

Work Nos. 1a, 1b, 1c, 1d, 2a, 3a, 3b, 4a, 4b, 5a, 5b, 6a, 7, 8a, 9a, 10a, 10b, 11a, 11b, 12a, 12b, 13a, 14a, 14b, 15a, 15b, 16a, 16b, 17a, 19a, 20, 21a, 22a, 23a, and 24a.

These works are marked with an asterisk in the description below.

Work Nos. 2b, 3c, 4c, 5c, 5d, 6b, 8b, 8c, 9b, 10c, 11c, 12c, 13b, 14c, 15c, 16c, 17b, 18, 19b, 21b, 22b, 23b, 23c, 24b, 25, 26 and 27.

The description set out in this Schedule is subject to article 2(4) of this Order.

PART 2ANCILLARY WORKS

At the Shad Thames Pumping Station—

(a)modifications to the existing pumps and provision of new internal pipe work; and

(b)provision of new pumps.

At the Beckton Sewage Treatment Works—

(a)installation of pumps and associated equipment and power supply within Tideway Pumping Station;

(b)installation of electrical equipment in existing building;

Generally—

(a)works within the existing sewers, chambers and culverts and other structures that comprise the existing sewerage network for the purposes of enabling the authorised project, including reconfiguring, modifying, altering, repairing, strengthening or reinstating the existing network;

(b)works within existing pumping stations including structural alterations to the interior fabric of the pumping station(s), works to reconfigure existing pipework, provision of new pipework, new penstock valves and associated equipment, modification of existing electrical, mechanical and control equipment, and installation or provision of new electrical, mechanical and control equipment;

(c)installation of electrical, mechanical and control equipment in other buildings and kiosks and modification to existing electrical, mechanical and control equipment in such buildings and kiosks;

(d)installation of pumps in chambers and buildings;

(e)works to trees and landscaping works not comprising development;

(f)works associated with monitoring of buildings and structures;

(g)provision of construction traffic signage; and

(h)suspension of existing moorings and the relocation of boats/vessels including works to attach mooring structures and equipment to the boats/vessels.