The Port Security (Port of London) Designation Order 2014

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 2

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Port Security (Port of London) Designation Order 2014, Section 2. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Port boundary

This section has no associated Explanatory Memorandum

2.—(1) For the purposes of the definition of “port” in regulation 2 of the Port Security Regulations 2009(1), the boundary of the Port of London is defined as follows.

(2) Subject to paragraphs (5), (7), (12), (13), (22) and (23), the boundary is generally shown by the inner edge of—

(a)the red line on the overview key plan in Part 1 of Schedule 1; and

(b)the red lines on the plans, in Part 2 of Schedule 1, headed “Key Plan Inset A”, “Key Plan Inset A (continued)”, “Key Plan Inset B”, “Key Plan Inset B (continued)”, “Key Plan Inset C” and “Key Plan Inset C (continued)”.

(3) As to the inland limits of the boundary, so far as not included in the rectangles referred to in paragraph (4), the red line runs—

(a)along the beaches and foreshores; and

(b)along the outer perimeters of jetties, piers and other structures which are not beaches and foreshores.

(4) As to the parts of the boundary included in the rectangles marked “Inset 1” to “Inset 51” on the plans in Part 2 of Schedule 1, the boundary is more particularly shown by the red lines on each of the corresponding inset plans, in Part 3 of Schedule 1, headed respectively “Inset Plan 1” to “Inset Plan 28”, “Inset Plan 29” to “Inset Plan 34”, “Inset Plan 35” to “Inset Plan 43” and “Inset Plan 44” to “Inset Plan 51”.

(5) On Inset Plan 1—

(a)the items marked “A” enclosed in lilac are outside the boundary; and

(b)the part of the item marked “B” (HMS Belfast) enclosed in lilac is outside the boundary.

(6) On Inset Plan 2, the jetty marked “A” is outside the boundary.

(7) On Inset Plan 4, the area marked “A” enclosed in lilac is outside the boundary.

(8) On Inset Plan 8, the areas marked “A” enclosed in red are inside the boundary.

(9) On Inset Plan 15, the jetty at the area marked “A” is outside the boundary.

(10) On Inset Plan 17, the jetty marked “A” is outside the boundary.

(11) On Inset Plan 21, the jetty at the area marked “A” is outside the boundary.

(12) On Inset Plan 22, the area marked “A” enclosed in lilac is outside the boundary.

(13) On Inset Plan 23, the area marked “A” edged on three sides in lilac, and the area marked “B” enclosed in lilac, are outside the boundary.

(14) On Inset Plan 26, the areas marked “A” enclosed in red are inside the boundary.

(15) On Inset Plan 28, the part of the boundary included in the rectangle marked “Inset A” is more particularly shown by the red lines on the corresponding inset plan, in Part 3 of Schedule 1, headed “Inset Plan 28A”.

(16) On Inset Plan 34, the part of the boundary included in the rectangle marked “Inset A” is more particularly shown by the red lines on the corresponding inset plan, in Part 3 of Schedule 1, headed “Inset Plan 34A”.

(17) On Inset Plan 35, the jetty marked “A” is outside the boundary.

(18) On Inset Plan 43, the part of the boundary included in the rectangle marked “Inset 43A” is more particularly shown by the red line on the corresponding inset plan, in Part 3 of Schedule 1, headed “Inset Plan 43A”.

(19) On Inset Plan 44, the area marked “A” enclosed in red is inside the boundary.

(20) Where the red line runs along a beach or foreshore, or along the outer perimeter of a jetty, pier or other structure which is not a beach or foreshore, the boundary runs along the edge of the land on that beach or foreshore, or along the edge of that jetty, pier or other structure, which is below the level of mean high water springs.

(21) The limit of the boundary—

(a)on the River Darent, is the Dartford Creek Flood Barrier at Dartford Creek;

(b)at Barking Creek, is the downstream face of the Alfred’s Way (A13) road bridge;

(c)at the mouth of the River Lea, is the downstream face of the Barking Road (A13) Bridge; and

(d)at the mouth of the Ravensbourne at Deptford Creek, is the normal tidal limit.

(22) The anchorages specified in the table headed “Designated Anchorages” in Part 4 of Schedule 1 are inside the boundary.

(23) The navigational channels specified in the table headed “Designated Navigational Channels” in Part 5 of Schedule 1 are inside the boundary.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources