SCHEDULE 3Eligible properties

1

1

The requirements set out in this Schedule in relation to a property are that an Energy Performance Certificate (“EPC”) has been issued for the property on the basis that it consists of a dwelling and—

a

the property is an eligible new-build property; or

b

the requirements in—

i

sub-paragraph (2) are met; and

ii

either sub-paragraph (3) or (4) are met.

2

The requirements referred to in sub-paragraph (1)(b)(i) are that the property was first occupied before the first commissioning date for the plant and a Green Deal Assessment has been carried out for the property.

3

The requirements referred to in sub-paragraph (1)(b)(ii) are that the EPC

a

does not include a recommendation report; or

b

includes a recommendation report which does not recommend that loft insulation or cavity wall insulation be installed.

4

The requirements referred to in sub-paragraph (1)(b)(ii) are that loft insulation or cavity wall insulation is recommended in a recommendation report included in the EPC and cannot be installed in accordance with that recommendation as that installation—

a

is prevented by restrictions on the building as a consequence of its status as a listed building, its location in a conservation area or the material impact that such installation would have on a protected species;

b

would otherwise be unlawful; or

c

is not feasible due to atypical local environmental conditions or the structure of the property.