Search Legislation

The Pyrotechnic Articles (Safety) Regulations 2015

Changes over time for: Chapter 1

 Help about opening options

Alternative versions:

Status:

Point in time view as at 09/12/2021.

Changes to legislation:

There are currently no known outstanding effects for the The Pyrotechnic Articles (Safety) Regulations 2015, Chapter 1. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Chapter 1U.K.Manufacturers

CategorisationE+W+S

6.  Before placing a pyrotechnic article on the market, a manufacturer must—

(a)categorise it using the categories set out in Schedule 1 (categories of pyrotechnic article), according to its—

(i)type of use; or

(ii)purpose and level of hazard, including its noise level; and

(b)ensure that [F1an approved body] has confirmed that categorisation as part of a relevant conformity assessment procedure.

Extent Information

E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

CategorisationN.I.

6.  Before placing a pyrotechnic article on the market, a manufacturer must—

(a)categorise it using the categories set out in Schedule 1 (categories of pyrotechnic article), according to its—

(i)type of use; or

(ii)purpose and level of hazard, including its noise level; and

(b)ensure that a notified body has confirmed that categorisation as part of a relevant conformity assessment procedure.

Extent Information

E8This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Design and manufacture in accordance with essential safety requirementsU.K.

7.  Before placing a pyrotechnic article on the market, a manufacturer must ensure that it has been designed and manufactured in accordance with the essential safety requirements.

Technical documentation and conformity assessmentE+W+S

8.  Before placing a pyrotechnic article on the market, a manufacturer must—

(a)have a relevant conformity assessment procedure carried out; and

(b)draw up the technical documentation referred to—

(i)for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(a) is being carried out, in point 3(c) of Module B of [F2Schedule 2A];

(ii)for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(b) is being carried out, in point 2 of Module G of [F2Schedule 2A];

(iii)for pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(c) is being carried out, in point 3.1(b) of Module H of [F2Schedule 2A].

Extent Information

E2This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Technical documentation and conformity assessmentN.I.

8.  Before placing a pyrotechnic article on the market, a manufacturer must—

(a)have a relevant conformity assessment procedure carried out; and

(b)draw up the technical documentation referred to—

(i)for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(a) is being carried out, in point 3(c) of Module B of Annex II to the Directive (as amended from time to time);

(ii)for a pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(b) is being carried out, in point 2 of Module G of Annex II to the Directive (as amended from time to time);

(iii)for pyrotechnic article in respect of which the conformity assessment procedure in regulation 40(c) is being carried out, in point 3.1(b) of Module H of Annex II to the Directive (as amended from time to time).

Extent Information

E9This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

EU declaration of conformity and CE markingN.I.

9.—(1) Where the conformity of a pyrotechnic article with the essential safety requirements has been demonstrated by a relevant conformity assessment procedure, the manufacturer must, before placing the pyrotechnic article on the market—

(a)draw up a declaration of conformity in accordance with regulation 41 (EU declaration of conformity); and

(b)affix the CE marking in accordance with regulation 42 (CE marking).

(2) The manufacturer must keep the EU declaration of conformity up-to-date.

(3) Where a pyrotechnic article is subject to more than one EU instrument requiring a declaration of conformity to be drawn up, the manufacturer must draw up a single declaration of conformity, which—

(a)identifies the EU instruments; and

(b)includes references to the publication of those EU instruments in the Official Journal of the European Union.

Extent Information

E3This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

F12... declaration of conformity and [F13UK ] markingE+W+S

9.—(1) Where the conformity of a pyrotechnic article with the essential safety requirements has been demonstrated by a relevant conformity assessment procedure, the manufacturer must, before placing the pyrotechnic article on the market—

(a)draw up a declaration of conformity in accordance with regulation 41 F14...; and

(b)affix the [F15UK] marking in accordance with regulation 42 F16....

(2) The manufacturer must keep the F17... declaration of conformity up-to-date.

[F18(3) Where a pyrotechnic article is subject to more than one enactment requiring a declaration of conformity to be drawn up, the manufacturer must draw up a single declaration of conformity, which identifies each enactment by its title.]

Extent Information

E10This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Retention of technical documentation and F3... declaration of conformityE+W+S

10.  A manufacturer must keep the technical documentation and the F4... declaration of conformity drawn up in respect of a pyrotechnic article for a period of 10 years beginning on the day on which the pyrotechnic article is placed on the market.

Extent Information

E4This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Retention of technical documentation and EU declaration of conformityN.I.

10.  A manufacturer must keep the technical documentation and the EU declaration of conformity drawn up in respect of a pyrotechnic article for a period of 10 years beginning on the day on which the pyrotechnic article is placed on the market.

Extent Information

E11This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Labelling of pyrotechnic articles other than pyrotechnic articles for vehiclesE+W+S

11.—(1) Before placing a pyrotechnic article on the market, a manufacturer must ensure that it is labelled —

(a)visibly, legibly and indelibly;

(b)clearly and understandably; and

[F5(c)in English.]

(2) The manufacturer must ensure that the labelling of the pyrotechnic article includes, as a minimum, the information specified in Schedule 3 (labelling: required information).

F6(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F6(4) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F6(5) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(6) Where it is not possible for information specified in paragraph 1(a) and (b) of Schedule 3 to be indicated on the pyrotechnic article (including where this is as a result of other labelling requirements referred to in Schedule 3 having taken up the available space on the pyrotechnic article), the manufacturer must ensure that that information is indicated on its packaging or in a document accompanying the pyrotechnic article.

(7) Where the pyrotechnic article does not provide sufficient space for the other labelling requirements specified in Schedule 3 (including where this is as a result of the information specified in paragraph 1(a) and (b) of Schedule 3 having taken up the available space on the pyrotechnic article), the manufacturer must ensure that the information is provided on the smallest piece of packaging.

(8) This regulation does not apply to pyrotechnic articles for vehicles.

Extent Information

E5This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Labelling of pyrotechnic articles other than pyrotechnic articles for vehiclesN.I.

11.—(1) Before placing a pyrotechnic article on the market, a manufacturer must ensure that it is labelled —

(a)visibly, legibly and indelibly;

(b)clearly and understandably; and

(c)subject to paragraphs (3) and (4), in the official language of the [F19relevant state] in which the pyrotechnic article is to be made available to the end-user.

(2) The manufacturer must ensure that the labelling of the pyrotechnic article includes, as a minimum, the information specified in Schedule 3 (labelling: required information).

(3) The information specified in paragraph 1(a) and (b) of Schedule 3 must be provided in a language which can be easily understood by the end-users and the competent national authority in the [F19relevant state] in which the pyrotechnic article is to be made available to such end-users.

(4) The information specified in paragraph 1(f) of Schedule 3 must be provided in a language which can be easily understood by consumers and other end-users in the [F19relevant state] in which the pyrotechnic article is to be made available to such consumers and other end-users.

(5) Where the pyrotechnic article is to be made available to end-users in [F20Northern Ireland] the language which can be easily understood by consumers and other end-users is English.

(6) Where it is not possible for information specified in paragraph 1(a) and (b) of Schedule 3 to be indicated on the pyrotechnic article (including where this is as a result of other labelling requirements referred to in Schedule 3 having taken up the available space on the pyrotechnic article), the manufacturer must ensure that that information is indicated on its packaging or in a document accompanying the pyrotechnic article.

(7) Where the pyrotechnic article does not provide sufficient space for the other labelling requirements specified in Schedule 3 (including where this is as a result of the information specified in paragraph 1(a) and (b) of Schedule 3 having taken up the available space on the pyrotechnic article), the manufacturer must ensure that the information is provided on the smallest piece of packaging.

(8) This regulation does not apply to pyrotechnic articles for vehicles.

Extent Information

E12This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Textual Amendments

Labelling of pyrotechnic articles for vehiclesE+W+S

12.—(1) Before placing a pyrotechnic article for a vehicle on the market, a manufacturer must ensure that it is labelled with—

(a)the information about the manufacturer specified in paragraph 1(a) and (b) of Schedule 3;

(b)the name and type of the pyrotechnic article;

(c)the [F7UK] registration number of the pyrotechnic article;

(d)the product, batch or serial number of the pyrotechnic article; and

(e)safety instructions (where necessary).

(2) If the pyrotechnic article for a vehicle does not provide sufficient space for the labelling requirements specified in paragraph (1), the manufacturer must ensure that the information is provided on the packaging.

(3) Before placing a pyrotechnic article for a vehicle on the market, the manufacturer must draw up a [F8UK] safety data sheet.

(4) In paragraph (3), “[F9UK] safety data sheet” means a document—

(a)compiled in accordance with Annex II to Regulation (EC) 1907/2006 of the European Parliament and of the Council concerning the Registration, Evaluation, Authorisation and Restriction of Chemicals, establishing a European Chemicals Agency M1 (as amended from time to time); and

(b)which takes account of the specific needs of professional users.

Extent Information

E6This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Marginal Citations

M1OJ L 396, 30.12.2006, p. 1.

Labelling of pyrotechnic articles for vehiclesN.I.

12.—(1) Before placing a pyrotechnic article for a vehicle on the market, a manufacturer must ensure that it is labelled with—

(a)the information about the manufacturer specified in paragraph 1(a) and (b) of Schedule 3;

(b)the name and type of the pyrotechnic article;

(c)the registration number of the pyrotechnic article;

(d)the product, batch or serial number of the pyrotechnic article; and

(e)safety instructions (where necessary).

(2) If the pyrotechnic article for a vehicle does not provide sufficient space for the labelling requirements specified in paragraph (1), the manufacturer must ensure that the information is provided on the packaging.

(3) Before placing a pyrotechnic article for a vehicle on the market, the manufacturer must draw up a safety data sheet.

(4) In paragraph (3), “safety data sheet” means a document—

(a)compiled in accordance with Annex II to Regulation (EC) 1907/2006 of the European Parliament and of the Council concerning the Registration, Evaluation, Authorisation and Restriction of Chemicals, establishing a European Chemicals Agency F21 (as amended from time to time); and

(b)which takes account of the specific needs of professional users.

Extent Information

E13This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Textual Amendments

F21OJ L 396, 30.12.2006, p. 1.

Compliance procedures for series productionE+W+S

13.—(1) A manufacturer of pyrotechnic articles which are manufactured by series production must ensure that, before placing such a pyrotechnic article on the market, procedures are in place to ensure that any pyrotechnic article so manufactured will be in conformity with Part 2.

(2) In doing so, the manufacturer must take adequate account of—

(a)any change in pyrotechnic article design or characteristics; and

(b)any change in a [F10designated] standard or in another technical specification by reference to which the F11... declaration of conformity was drawn up.

Extent Information

E7This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only

Textual Amendments

Compliance procedures for series productionN.I.

13.—(1) A manufacturer of pyrotechnic articles which are manufactured by series production must ensure that, before placing such a pyrotechnic article on the market, procedures are in place to ensure that any pyrotechnic article so manufactured will be in conformity with Part 2.

(2) In doing so, the manufacturer must take adequate account of—

(a)any change in pyrotechnic article design or characteristics; and

(b)any change in a harmonised standard or in another technical specification by reference to which the EU declaration of conformity was drawn up.

Extent Information

E14This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources