Article 4

SCHEDULEApproved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

HPC Permanent Development Site
Site Plans
Drawing numberRevDrawing titleScalePaper size
HINK-A1-SL-00-GA-00202HPC Site Parameter Plan1:1000A0
HINK-A1-SL-00-GA-01002Site Layout Plan (Operational)1:2500A1
Nuclear Island (Unit 1)
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HR-01-GP-09002Roof Plan1:200A0
HINK-A2-HR-01-GE-00102South and West Elevations1:200A0
HINK-A2-HR-01-GE-00202North and East Elevations1:200A0
HINK-A2-HR-01-DT-00101Part Elevation Detail1:50A0
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HQ-00-GA-00101Roof Plan and Elevations1:200A0
HINK-A2-HQ-00-DT-00101Part Elevation Detail1:50A0
Hot Laundry / Hot workshop / Hot warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HV-00-GP-02002Roof Plan1:200A1
HINK-A2-HV-00-GE-00102Elevations1:200A1
HINK-A2-HV-00-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – A / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-01-GP-04002Roof Plan1:200A1
HINK-A2-HD-01-GE-00102Elevations1:200A1
HINK-A2-HD-01-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – B / Cooling Water Discharge Weir (Building) / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-02-GP-04002Roof Plan1:200A1
HINK-A2-HD-02-GE-00102Elevations1:200A1
HINK-A2-HD-02-DT-00102Part Elevation Detail1:50A1
Service Access Building 1
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGC-00-GA-00101Roof Plan & Elevations1:100A1
Nuclear Island (Unit 2)
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HR-02-GP-09002Roof Plan1:200A0
HINK-A2-HR-02-GE-00101South and West Elevations1:200A0
HINK-A2-HR-02-GE-00202North and East Elevations1:200A0
HINK-A2-HR-02-DT-00101Part Elevation Detail1:50A0
Radioactive Waste Treatment Building / Battery Load Bank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HQC-00-GP-04002Roof Plan1:100A1
HINK-A2-HQC-00-GE-00102Elevations1:100A1
HINK-A2-HQC-00-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – C / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-03-GP-04002Roof Plan1:200A1
HINK-A2-HD-03-GE-00102Elevations1:200A1
HINK-A2-HD-03-DT-00102Part Elevation Detail1:50A1
Emergency Diesel Generator – D / Cooling Water Discharge Weir (Building)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HD-04-GP-04002Roof Plan1:200A1
HINK-A2-HD-04-GE-00102Elevations1:200A1
HINK-A2-HD-04-DT-00102Part Elevation Detail1:50A1
Service Access Building 4
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGB-00-GA-00101Roof Plan & Elevations1:100A1
Conventional Island (Unit 1)
Unit 1: Turbine Hall
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HM-01-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-01-GE-00102West and East Elevations1:200A0
HINK-A1-HM-01-DT-00101Part Elevation Detail1:50A0
Unit 1: Sky Bridges
Drawing numberRevDrawing titleScalePaper size
HINK-A1-BR-01-GP-01001Roof Plan1:100A1
HINK-A1-BR-01-GE-00101North and South Elevations1:100A1
HINK-A1-BR-01-GE-00201East and West Elevations1:100A1
HINK-A1-BR-01-DT-00101Part Elevation Detail1:50A1
Unit 1: Non Classified Electrical Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HF-01-GP-03002Roof Plan1:100A1
HINK-A2-HF-01-GE-00102South Elevation1:100A1
HINK-A2-HF-01-GE-00202North and East Elevations1:100A1
HINK-A2-HF-01-DT-00102Part Elevation Detail1:50A1
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HT-01-GP-00301Roof1:200A1
HINK-A2-HT-01-GE-00101Elevations1:200A1
HINK-A2-HT-01-DT-00101Part Elevation Detail1:50A1
Unit 1: Hydrazine Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SIR-01-GA-00101Roof Plan and Elevations1:100A1
Conventional Island (Unit 2)
Unit 2: Turbine Hall
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HM-02-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-02-GE-00102West and East Elevations1:200A0
HINK-A1-HM-02-DT-00101Part Elevation Detail1:50A0
Unit 2: Sky Bridges
Drawing numberRevDrawing titleScalePaper size
HINK-A1-BR-02-GP-01001Roof Plan1:100A1
HINK-A1-BR-02-GE-00101North and South Elevations1:100A1
HINK-A1-BR-02-GE-00201East and West Elevations1:100A1
HINK-A1-BR-02-DT-00101Part Elevation Detail1:50A1
Unit 2: Non Classified Electrical Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HF-02-GP-03002Roof Plan (Lev 10.70m)1:100A1
HINK-A2-HF-02-GE-00102South Elevation1:100A1
HINK-A2-HF-02-GE-00202North and West Elevations1:100A1
HINK-A2-HF-02-DT-00102Part Elevation Detail1:50A1
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HT-02-GP-00301Roof1:200A1
HINK-A2-HT-02-GE-00101Elevations1:200A1
HINK-A2-HT-02-DT-00101Part Elevation Detail1:50A1
Operations
Operational Service Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HB-00-GP-09001Roof Plan1:200A1
HINK-A1-HB-00-GE-00101North and South Elevations1:200A1
HINK-A1-HB-00-GE-00201East and West Elevations1:200A1
HINK-A1-HB-00-DT-00101Part Elevation Detail1:50A1
Cooling Water Pumphouse and Associated Buildings (Unit 1)
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 5 & 7
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HP-01-GP-03002Roof Plan1:200A0
HINK-A2-HP-01-GE-00102Elevations1:200A0
HINK-A2-HP-01-DT-00102Part Elevation Detail1:50A0
Unit 1: Fire-Fighting Water Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOJ-01-GA-00302Roof Plan and Elevations1:200A1
HINK-A2-HOJ-01-DT-00102Part Elevation Detail1:50A1
Discharge Shaft (Units 1 & 2)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HCT-00-GA-00101Roof Plan & Elevations1:100A1
Cooling Water Pumphouse and Associated Buildings (Unit 2)
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond (Surge Chamber) / Filtering Debris Recovery Pit / Service Access Buildings 6 & 8
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HP-02-GP-03002Roof Plan1:200A0
HINK-A2-HP-02-GE-00102Elevations1:200A0
HINK-A2-HP-02-DT-00102Part Elevation Detail1:50A0
Unit 2: Fire-Fighting Water Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOJ-02-GA-00302Roof Plan and Elevations1:200A1
HINK-A2-HOJ-02-DT-00102Part Elevation Detail1:50A1
Remaining Balance of Plant and Other Plant (Unit 1)
Unit 1: Hydrogen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZH-01-GA-00202Roof Plan and Elevations1:100A1
Unit 1: Oxygen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZO-01-GA-00201Roof Plan and Elevations1:100A1
Remaining Balance of Plant and Other Plant (Unit 2)
Unit 2: Hydrogen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZH-02-GA-00202Roof Plan & Elevations1:100A1
Unit 2: Oxygen Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZO-02-GA-00201Roof Plan and Elevations1:100A1
Remaining Balance of Plant and Other Plant (Shared Between both Units)
Demineralisation Station
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HY-00-GP-03002Roof Plan1:100A1
HINK-A2-HY-00-GE-00102North and South Elevations1:100A1
HINK-A2-HY-00-GE-00202East and West Elevations1:100A1
HINK-A2-HY-00-DT-00102Part Elevation Detail1:50A1
Auxiliary Boilers
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HVB-00-GA-00401Roof Plan1:100A1
HINK-A2-HVB-00-GE-00101Elevations1:100A1
HINK-A2-HVB-00-DT-00101Part Elevation Detail1:50A1
Chemical Products Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HZC-00-GA-00101Roof Plan and Elevations1:100A1
HINK-A2-HZC-00-DT-00101Part Elevation Detail1:50A1
Sewage Treatment Plant
Drawing numberRevDrawing titleScalePaper size
HINK-A2-STP-00-GA-00101Plans and Elevations1:100A1
Conventional Island Water Storage Tank – A
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SER-01-GA-00201Roof Plan and East Elevation1:200A1
Conventional Island Water Storage Tank – B
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SER-02-GA-00201Roof Plan and East Elevation1:200A1
Nuclear Island Water Storage Tank
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SED-00-GA-00201Roof Plan and South and East Elevations1:100A1
Degassed Water Storage Tanks
Drawing numberRevDrawing titleScalePaper size
HINK-A2-REA-00-GA-00101Roof Plan & Elevations1:200A1
Fuel Waste and Storage
Interim Spent Fuel Store
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHK-00-GP-00001Plan1:200A0
HINK-A2-HHK-00-GE-00101North and South Elevations1:200A0
HINK-A2-HHK-00-GE-00201East and West Elevations1:200A0
Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HUD-00-GA-00101Plans and Elevations1:100A1
Intermediate Level Waste Interim Storage Facility
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHI-00-GA-00201Roof Plan and Elevations1:200A0
HINK-A2-HHI-00-DT-00101Part Elevation Detail1:50A0
Ancillary, Office and Storage
Main Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HU-00-GP-01001Roof Plan1:100A1
HINK-A2-HU-00-GE-00101Elevations1:100A1
HINK-A2-HU-00-DT-00101Part Elevation Detail1:50A1
Entry Relay Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-ERB-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-ERB-00-DT-00101Part Elevation Detail1:50A1
Off-site Vehicle Search Area
Drawing numberRevDrawing titleScalePaper size
HINK-A2-VSA-00-GA-00101Roof Plan and Elevations1:50A1
Auxiliary Administration Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HUC-00-GP-02002Roof Plan1:100A1
HINK-A2-HUC-00-GE-00102North and South Elevations1:100A1
HINK-A2-HUC-00-GE-00202East and West Elevations1:100A1
HINK-A2-HUC-00-DT-00102Part Elevation Detail1:50A1
EDF Site Offices
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HAO-00-GE-00102Roof & Elevations1:200A1
HINK-A2-HAO-00-DT-00102Part Elevation Detail1:50A1
Garage for Handling Facilities
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HBG-00-GP-01001Roof Plan1:100A1
HINK-A2-HBG-00-GE-00101Elevations1:100A1
HINK-A2-HBG-00-DT-00101Part Elevation Detail1:50A1
Oil and Grease Storage and Oil Ancillary Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOG-00-GA-00201Roof Plan1:100A1
HINK-A2-HOG-00-GE-00101North and South Elevations1:100A1
HINK-A2-HOG-00-GE-00201East and West Elevations1:100A1
HINK-A2-HOG-00-DT-00101Part Elevation Detail1:50A1
AREVA Warehouse
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HBW-00-GP-01001Roof Plan1:200A1
HINK-A2-HBW-00-GE-00101Elevations1:200A1
HINK-A2-HBW-00-DT-00101Part Elevation Detail1:50A1
Meteorological Station
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HSM-00-GA-00201Roof Plan and Elevations1:50A1
Outage Access Control Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-TU1-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-TU1-00-DT-00101Part Elevation Detail1:50A1
Contaminated Tools Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHC-01-GA-00202Roof Plan and Elevations1:200A1
HINK-A2-HHC-01-DT-00102Part Elevation Detail1:50A1
Conventional Waste Storage
Drawing numberRevDrawing titleScalePaper size
HINK-A2-CWS-00-GA-00201Roof Plan and Elevations1:200A1
Transit Area for Very Low Level Waste and Low Level Waste
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHL-00-GE-00101Elevations1:100A1
Raw Water and Potable Water Supply
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HOR-00-GA-00102Roof Plan1:100A0
HINK-A2-HOR-00-GA-00202Elevations1:100A0
HINK-A2-HOR-00-DT-00102Part Elevation Detail1:50A1
Emergency Response Store
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HHE-00-GA-00101Roof Plan & Elevations1:200A1
HINK-A2-HHE-00-DT-00101Part Elevation Detail1:50A1
Services Ventilation Building
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HGM-00-GA-00101Roof Plan & Elevations1:100A1
Public and Training
Simulator Building / Training Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-HBS-00-GP-02001Roof Plan1:200A1
HINK-A1-HBS-00-GE-00101Elevations1:200A1
HINK-A1-HBS-00-DT-00101Part Elevation Detail1:50A1
Public Information Centre
Drawing numberRevDrawing titleScalePaper size
HINK-A1-PIC-00-GP-04001Roof Plan1:100A1
HINK-A1-PIC-00-GE-00101North and West Elevations1:100A1
HINK-A1-PIC-00-GE-00201South and East Elevations1:100A1
HINK-A1-PIC-00-DT-00101Part Elevation Detail1:50A1
National Grid Substation
Drawing numberRevDrawing titleScalePaper size
HINK-A2-SS-00-GP-01001Roof Plan1:200A0
HINK-A2-SS-00-GE-00101Elevations1:200A0
HINK-A2-SS-00-DT-00101Part Elevation Detail1:50A0
Other Site Structures
Sea Wall (Incorporating Coastal Footpath)
Drawing numberRevDrawing titleScalePaper size
HINK-A2-HSW-00-GA-00101Plans1:500A0
HINK-A2-HSW-00-GA-00201North Elevation1:50A0
HINK-A2-HSW-00-GA-00301Detail Plans and Elevations1:50A0
HINK-A2-HSW-00-GA-00401Detail Plan and Elevation1:100A0
EDF Energy Pylons
Drawing numberRevDrawing titleScalePaper size
HINK-A1-PL-00-GA-00101Location Plan, Plans, Elevations and AxonometricVariousA1
Highways Plans
Drawing numberRevDrawing titleScalePaper size
HPC-GEN124-RI-RFC-DRW-00004501Northern Roundabout Proposed Layout1:500A1
HPC-GEN124-RI-RFC-DRW-00004601Vehicle Search Area Layby and Turning Head Proposed Layout1:250A1
HPC-GEN124-RI-RFC-DRW-00004701Southern Roundabout Proposed Layout During Operation1:500A1
HPC-GEN124-RI-RFC-DRW-00004801Southern Roundabout Proposed Layout During Construction1:500A1
HPC-GEN124-RI-RFC-DRW-00004901Emergency Access Road Junction with Existing Highway Proposed Layout1:250A1
Site Preparation Plans
Drawing numberRevDrawing titleScalePaper size
HPCSPW002a Rev101Site Layout Plan1:3500A1
HPCSPW002b00Beach Access Road Plan and Cross Sections1:250 / 1:50A1
HPCSPW004 Rev101Planning Application Fencing Arrangement (Sheet 1 of 3)1:3500A1
HPCSPW005 Rev101Fencing Enlarged Detail West (Sheet 2 of 3)1:1500A1
HPCSPW006 Rev101Fencing Enlarged Detail East (Sheet 3 of 3)1:1500A1
HPCSPW007 Rev101Indicative Earthworks Cut and Fill Arrangement1:3500A1
HPCSPW00800Early Works Water Management Zone1:2500A1
HPCSP009 Rev101Surface Water Catchment Area Overall General Arrangement1:3000A1
HPCSPW01000Arrangement of Construction Drainage Outfall to Foreshore1:75A1
HPCSPW011 Rev101Surface Water Drainage Holford Stream Culvert1:1500 / 1:150A1
HPCSPW012a00Deep Water Drainage Arrangement1:2000 / 1:100A1
HPCSPW012b00Deep Water Arrangement Spine Drain Sections A and B1:200A1
HPCSPW012c00Deep Water Assessment Spine Drain Sections C1:200A1
HPCSPW013b00Typical Cross Section Through Haul Road1:50A1
HPCSPW0140011kv Sub Station Plan and Elevations1:100A1
HPCSPW01500Raw Water Reservoir Plans and Sections1:150A1
HPCSPW016 Rev101Surface Water Drainage in the Built Development Areas1:1750A1
HPCSPW01700Site Access Control Arrangement, Floor and Elevation1:50A1
HPCSPW019 Rev101Landscape Proposal Plan1:5000A1
HPCSPW02200Proposed Sewage Treatment Plant – Plans and Sections1:100A1
HPCSPW023a00Existing and Reinstated Ground Level Cross Sections1:2500 / 1:500A1
HPCSPW023b00Earthworks Platforms Cross Sections1:2500 / 1:500A1
HPCSPW025a Rev202Tree and Hedgerow Retention and Removal1:4000A1
HPCSPW025b Rev101Proposed Advanced Planting, Plan1:1000A1
HPCSPW02600Primary and Secondary Access Tracks1:3500A1
HPCSPW02700NW Boundary Mitigation During Construction Cross Sections A and B1:200A1
HPCSPW02800NW Boundary Mitigation During Construction Cross Sections C and D1:200A1
HPCSPW02900NW Boundary Mitigation During Construction Planting Plan1:750A1