Building or Structure | Maximum height (metres above 211 metres AOD) | Minimum height (metres above 211 metres AOD) | Maximum length (metres) | Minimum length (metres) | Maximum width (metres) | Minimum width (metres) |
---|---|---|---|---|---|---|
Each gas turbine generator (where one gas turbine generator is constructed) (part of numbered work 2A) | 19.0 | - | 50.0 | - | 40.0 | - |
Each gas turbine generator (where two gas turbine generators are constructed) (part of numbered work 2A) | 19.0 | – | 30.0 | – | 30.0 | – |
Each gas turbine generator (where three, four or five gas turbine generators are constructed) (part of numbered work 2A) | 10.0 | – | 36.0 | – | 23.0 | – |
Each exhaust gas emission flue stack (where one gas turbine generator is constructed) (part of numbered work 2A) | 35.0 | 30.0 | – | – | 11.0 (up to and includi-ng a height of 16.5 metres above 211 metres AOD) and 10.0 (from a height of 16.5 metres above 211 metres AOD to a height of 35.0 metres above 211 metres AOD) | – |
Each exhaust gas emission flue stack (where two, three, four or five gas turbine generators are constructed) (part of numbered work 2A) | 35.0 | 30.0 | – | – | 10.0 | – |
Control room/office/workshop (part of numbered work 2B) | 6.0 | – | 29.0 | – | 23.0 | – |
Natural gas receiving station (part of numbered work 2B) | 5.0 | - | 50.0 | - | 36.0 | - |
Gas treatment compound (part of numbered work 2B) | 5.0 | - | 29.0 | - | 16.0 | - |
Each black start diesel generator (part of numbered work 2B) | 5.0 | – | 17.0 | – | 5.0 | – |
External fin fan cooler (where one gas turbine generator is constructed) (part of numbered work 2B) | 6.0 | – | 13.0 | – | 10.0 | – |
Switchyard/b-anking compound (part of numbered work 2C) | 11.3 | – | 60.0 | – | 60.0 | – |
Switchgear building (part of numbered work 2C) | 11.3 | – | 21.0 | – | 15.0 | – |
Gatehouse (part of numbered work 2E) | 4.5 | – | 9.0 | – | 8.0 | – |
Demineralis-ed water tank (part of numbered work 2E) | 16.0 | – | 23.0 | – | 23.0 | – |
Raw/fire water tank (part of numbered work 2E) | 18.0 | – | 15.0 | – | 15.0 | – |
Bat mitigation structure (part of numbered work 2E) | 6.0 | – | 10.0 | – | 5.0 | – |