Search Legislation

The Measuring Instruments Regulations 2016

 Help about what version

What Version

 Help about advanced features

Advanced Features

Status:

Point in time view as at 31/12/2020.

Changes to legislation:

There are currently no known outstanding effects for the The Measuring Instruments Regulations 2016, SCHEDULE 1E. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulations 2 and 39(1)

[F1SCHEDULE 1EE+W+SACTIVE ELECTRICAL ENERGY METERS (MI-003) (Annex V to the Directive)

This schedule has no associated Explanatory Memorandum

The relevant requirements of Schedule 1A, the specific requirements of this Schedule and the conformity assessment procedures listed in this Schedule, apply to active electrical energy meters.

Note:

Electrical energy meters may be used in combination with external instrument transformers, depending upon the measurement technique applied. However, this Schedule covers only electrical energy meters but not instrument transformers.

DEFINITIONS

An active electrical energy meter is a device which measures the active electrical energy consumed in a circuit.

I=the electrical current flowing through the meter;
In=the specified reference current for which the transformer operated meter has been designed;
Ist=the lowest declared value of I at which the meter registers active electrical energy at unity power factor (polyphase meters with balanced load);
Imin=the value of I above which the error lies within maximum permissible errors (MPEs) (polyphase meters with balanced load);
Itr=the value of I above which the error lies within the smallest MPE corresponding to the class index of the meter;
Imax=the maximum value of I for which the error lies within the MPEs;
U=the voltage of the electricity supplied to the meter;
Un=the specified reference voltage;
f=the frequency of the voltage supplied to the meter;
fn=the specified reference frequency;
PF=power factor = cosφ = the cosine of the phase difference φ between I and U.

SPECIFIC REQUIREMENTS

AccuracyE+W+S

1.  The manufacturer shall specify the class index of the meter. The class indices are defined as: Class A, B and C.

Rated operating conditionsE+W+S

2.  The manufacturer shall specify the rated operating conditions of the meter; in particular:

The values of fn, Un, In, Ist, Imin, Itr and Imax that apply to the meter. For the current values specified, the meter shall satisfy the conditions given in Table 1;

Table 1

1 For Class B electromechanical meters Imin 0.4 ∙ Itr shall apply.

Class AClass BClass C
For direct-connected meters
Ist 0.05 ∙ Itr 0.04 ∙ Itr≤ 0.04 ∙ Itr
Imin 0.5 ∙ Itr 0.5 ∙ Itr 0.3 ∙ Itr
Imax 50 ∙ Itr 50 ∙ Itr 50 ∙ Itr
For transformer-operated meters
Ist 0.06 ∙ Itr 0.04 ∙ Itr 0.02 ∙ Itr
Imin 0.4 ∙ Itr 0.2 ∙ Itr1 0.2 ∙ Itr
In = 20 ∙ Itr = 20 ∙ Itr = 20 ∙ Itr
Imax 1.2 ∙ In 1.2 ∙ In 1.2 ∙ In

The voltage, frequency and power factor ranges within which the meter shall satisfy the MPE requirements are specified in Table 2. These ranges shall recognise the typical characteristics of electricity supplied by public distribution systems.

The voltage and frequency ranges shall be at least:

  • 0.9 ∙ UnU 1.1 ∙ Un

  • 0.98 ∙ fn f 1.02 ∙ fn

power factor range at least from cosφ = 0.5 inductive to cosφ = 0.8 capacitive.

MPEsE+W+S

3.  The effects of the various measurands and influence quantities (a, b, c,…) are evaluated separately, all other measurands and influence quantities being kept relatively constant at their reference values. The error of measurement, that shall not exceed the MPE stated in Table 2, is calculated as:

When the meter is operating under varying-load current, the percentage errors shall not exceed the limits given in Table 2.

Table 2

Operating temperaturesOperating temperaturesOperating temperaturesOperating temperatures
MPEs in percent at rated operating conditions and defined load current levels and operating temperature
Operating temperaturesOperating temperaturesOperating temperaturesOperating temperatures
+ 5 °C … + 30 °C

– 10 °C … + 5 °C

or

+ 30 °C … + 40 °C

– 25 °C … – 10 °C

or

+ 40 °C … + 55 °C

– 40 °C … – 25 °C

or

+ 55 °C … + 70 °C

Meter classABCABCABCABC

Single phase meter; polyphase meter if operating with balanced loads

Imin ≤ I < Itr3.52152.51.373.51.7942
Itr ≤ I < Imax3.5204.52.5173.51.3941.5

Polyphase meter if operating with single phase load

Itr ≤ I < Imax

, see exception below

42.51531.3741.794.52
For electromechanical polyphase meters the current range for single-phase load is limited to 5Itr ≤ I ≤ Imax

When a meter operates in different temperature ranges the relevant MPE values shall apply.

The meter shall not exploit the MPEs or systematically favour any party.

4.  Permissible effect of disturbancesE+W+S

4.1.  GeneralE+W+S

As electrical energy meters are directly connected to the mains supply and as mains current is also one of the measurands, a special electromagnetic environment is used for electricity meters.

The meter shall comply with the electromagnetic environment E2 and the additional requirements in paragraphs 4.2 and 4.3.

The electromagnetic environment and permissible effects reflect the situation that there are disturbances of long duration which shall not affect the accuracy beyond the critical change values and transient disturbances, which may cause a temporary degradation or loss of function or performance but from which the meter shall recover and shall not affect the accuracy beyond the critical change values.

When there is a foreseeable high risk due to lightning or where overhead supply networks are predominant, the metrological characteristics of the meter shall be protected.

Effect of disturbances of long durationE+W+S

Table 3

Critical change values for disturbances of long duration
DisturbanceCritical change values in percent for meters of class
ABC
Reversed phase sequence1.51.50.3
Voltage unbalance (only applicable to polyphase meters)421
Harmonic contents in the current circuits10.80.5
DC and harmonics in the current circuit631.5
Fast transient bursts642
Magnetic fields; HF (radiated RF) electromagnetic field; Conducted disturbances introduced by radio-frequency fields; and Oscillatory waves immunity321

In the case of electromechanical electricity meters, no critical change values are defined for harmonic contents in the current circuits and for DC and harmonics in the current circuit.

Permissible effect of transient electromagnetic phenomenaE+W+S

4.3.1  The effect of an electromagnetic disturbance on an electrical energy meter shall be such that during and immediately after a disturbance:E+W+S

— any output intended for testing the accuracy of the meter does not produce pulses or signals corresponding to an energy of more than the critical change value,

and in reasonable time after the disturbance the meter shall:

  • — recover to operate within the MPE limits, and

  • — have all measurement functions safeguarded, and

  • — allow recovery of all measurement data present prior to the disturbance, and

  • — not indicate a change in the registered energy of more than the critical change value.

(m being the number of measuring elements of the meter, Un in Volts and Imax in Amps).

4.3.2.  For overcurrent the critical change value is 1.5 %.E+W+S

SuitabilityE+W+S

5.1.  Below the rated operating voltage the positive error of the meter shall not exceed 10 %.E+W+S

5.2.  The display of the total energy shall have a sufficient number of digits to ensure that when the meter is operated for 4,000 hours at full load (I = Imax, U = Un and PF = 1) the indication does not return to its initial value and shall not be able to be reset during use.E+W+S

5.3.  In the event of loss of electricity in the circuit, the amounts of electrical energy measured shall remain available for reading during a period of at least 4 months.E+W+S

Running with no loadE+W+S

5.4.  When the voltage is applied with no current flowing in the current circuit (current circuit shall be open circuit), the meter shall not register energy at any voltage between 0.8 ∙ Un and 1.1 Un.

StartingE+W+S

5.5.  The meter shall start and continue to register at Un, PF = 1 (polyphase meter with balanced loads) and a current which is equal to Ist.

UnitsE+W+S

6.  The electrical energy measured shall be displayed in kilowatt-hours or in megawatt-hours.

Putting into useE+W+S

7.(a) Subject to sub-paragraph (b), measurement may be performed by means of any active electrical energy meter provided that the temperature range to which an active electrical energy meter is exposed is not wider than the range specified by the manufacturer in relation to that active electrical energy meter in accordance with paragraph 1.3.1 and Table 1 in Schedule 1A to these Regulations.

(b)Class A active electrical energy meters may not be used when operating outside the temperature range of an upper temperature limit of 30°C to a lower temperature limit of 5°C.

(c)The person responsible for installing the active electrical energy meter must determine the correct current range and assess the climatic environment.

CONFORMITY ASSESSMENT The conformity assessment procedures specified in the modules in Schedule 1B applicable to active electrical energy meters that the manufacturer can choose between are:

(a)B and F;

(b)B and D; or

(c)H1.]

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources