Search Legislation

The Environmental Permitting (England and Wales) Regulations 2016

Changes over time for: CHAPTER 3

 Help about opening options

Alternative versions:

Status:

Point in time view as at 01/01/2017.

Changes to legislation:

There are currently no known outstanding effects for the The Environmental Permitting (England and Wales) Regulations 2016, CHAPTER 3. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

CHAPTER 3E+WMineral industries

SECTION 3.1E+WProduction of cement and lime

Part A(1)

(a)Producing cement clinker in rotary kilns with a production capacity exceeding 500 tonnes per day or in other kilns with a production capacity exceeding 50 tonnes per day.

(b)Producing lime or magnesium oxide in kilns with a production capacity of more than 50 tonnes per day.

Part A(2)

(a)Grinding cement clinker.

Part B

(a)Storing, loading or unloading cement or cement clinker in bulk prior to further transportation in bulk.

(b)Blending cement in bulk or using cement in bulk other than at a construction site, including the bagging of cement and cement mixtures, the batching of ready-mixed concrete and the manufacture of concrete blocks and other cement products.

(c)Slaking lime for the purpose of making calcium hydroxide or calcium magnesium hydroxide.

(d)Producing lime or magnesium oxide where the activity does not involve the heating of more than 50 tonnes per day of calcium carbonate or calcium magnesium carbonate or both in aggregate.

SECTION 3.2E+WActivities involving asbestos

Interpretation of Section 3.2

1.  In this Section “asbestos” means any of the following fibrous silicates: actinolite, amosite, anthophyllite, chrysotile, crocidolite and tremolite.E+W

Part A(1)

(a)Producing asbestos or manufacturing products based on or containing asbestos.

(b)Stripping asbestos from railway vehicles except—

(i)in the course of the repair or maintenance of the vehicle,

(ii)in the course of recovery operations following an accident, or

(iii)where the asbestos is permanently bonded in cement or in any other material (including plastic, rubber or resin).

Part B

(a)Unless related to an activity falling within Part A(1) of this Section, the industrial finishing of—

(i)asbestos cement,

(ii)asbestos cement products,

(iii)asbestos fillers,

(iv)asbestos filters,

(v)asbestos floor coverings,

(vi)asbestos friction products,

(vii)asbestos insulating board,

(viii)asbestos jointing, packaging or reinforcement material,

(ix)asbestos packing,

(x)asbestos paper or card, or

(xi)asbestos textiles.

SECTION 3.3E+WManufacturing glass and glass fibre

Part A(1)

(a)Manufacturing glass fibre in plant with a melting capacity exceeding 20 tonnes per day.

Part A(2)

(a)Manufacturing glass, unless falling within Part A(1) of this Section, where the melting capacity of the plant is more than 20 tonnes per day.

Part B

Unless falling within Part A(1) or Part A(2) of this Section—

(a)Manufacturing glass at any location with the capacity to make 5,000 or more tonnes of glass in any 12-month period, and any activity involving the use of glass which is carried on at any such location in conjunction with its manufacture.

(b)Manufacturing glass where the use of lead or any lead compound is involved.

(c)Manufacturing any glass product where lead or any lead compound has been used in the manufacture of the glass except—

(i)making products from lead glass blanks, or

(ii)melting, or mixing with another substance, glass manufactured elsewhere to produce articles such as ornaments or road paint.

(d)Polishing or etching glass or glass products in the course of any manufacturing activity if—

(i)hydrofluoric acid is used, or

(ii)hydrogen fluoride may be released into the air.

(e)Manufacturing glass frit or enamel frit and its use in any activity where that activity is related to its manufacture.

SECTION 3.4E+WProduction of other mineral fibres

Part A(1)

(a)Melting mineral substances including the production of mineral fibres in plants with a melting capacity exceeding 20 tonnes per day.

SECTION 3.5E+WOther mineral activities

Part A(2)

(a)Manufacturing cellulose fibre reinforced calcium silicate board using unbleached pulp.

Part B

(a)Unless falling within Part A(1) or Part A(2) of any Section, the crushing, grinding or other size reduction, other than the cutting of stone, or the grading, screening or heating of any designated mineral or mineral product except where the operation of the activity is unlikely to result in the release into the air of particulate matter.

(b)Any of the following activities unless carried on at an exempt location—

(i)crushing, grinding or otherwise breaking up coal, coke or any other coal product;

(ii)screening, grading or mixing coal, coke or any other coal product;

(iii)loading or unloading petroleum coke, coal, coke or any other coal product except unloading on retail sale.

(c)The crushing, grinding or other size reduction, with machinery designed for that purpose, of bricks, tiles or concrete.

(d)Screening the product of any activity described in paragraph (c).

(e)Coating road stone with tar or bitumen.

(f)Loading, unloading or storing pulverised fuel ash in bulk prior to further transportation in bulk.

(g)The fusion of calcined bauxite for the production of artificial corundum.

Interpretation and application of Part B

1.  In Part B—E+W

coal” includes lignite;

designated mineral or mineral product” means—

(a)

clay, sand or any other naturally occurring mineral other than coal;

(b)

metallurgical slag;

(c)

boiler or furnace ash produced from the burning of coal, coke or any other coal product;

(d)

gypsum which is a by-product of any activity;

exempt location” means—

(a)

any premises used for the sale of petroleum coke, coal, coke or any coal product where the throughput of such substances at those premises in any 12-month period is in aggregate likely to be less than 10,000 tonnes, or

(b)

any premises to which petroleum coke, coal, coke or any coal product is supplied only for use there;

retail sale” means sale to the final customer.

2.  Part B does not apply to any activity carried on underground.E+W

SECTION 3.6E+WCeramic production

Part A(1)

(a)Manufacturing ceramic products (including roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain) by firing in kilns, where—

(i)the kiln production capacity is more than 75 tonnes per day, or

(ii)the kiln capacity is more than 4m3 and the setting density is more than 300kg/m3,

and a reducing atmosphere is used other than for the purposes of colouration.

Part A(2)

(a)Unless falling within Part A(1) of this Section, manufacturing ceramic products (including roofing tiles, bricks, refractory bricks, tiles, stoneware or porcelain) by firing in kilns, where—

(i)the kiln production capacity is more than 75 tonnes per day, or

(ii)the kiln capacity is more than 4m3 and the setting density is more than 300kg/m3.

Part B

(a)Unless falling within Part A(1) or A(2) of this Section, firing heavy clay goods or refractory materials (other than heavy clay goods) in a kiln.

(b)Vapour glazing earthenware or clay with salts.

Interpretation of Part B

1.  In Part B—E+W

clay” includes a blend of clay with ash, sand or other materials;

refractory material” means material (such as fireclay, silica, magnesite, chrome-magnesite, sillimanite, sintered alumina, beryllia and boron nitride) which is able to withstand high temperatures and to function as a furnace lining or in other similar high temperature applications.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources