- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
2.—(1) In this Order—
“authorised development” means the development described in Schedule 1 (authorised development) and any other development authorised by this Order that is development within the meaning of section 32 of the Planning Act 2008;
“building” includes any structure or erection or any part of a building, structure or erection;
“environmental statement” means the document certified by the Secretary of State as the environmental statement under article 13 (certification of plans, etc.);
“highway” and “highway authority” have the same meaning as in the Highways Act 1980(1);
“land plan and site location plan” means the plan certified by the Secretary of State as the land plan and site location plan under article 13;
“maintain” includes, to the extent assessed in the environmental statement, inspect, repair and adjust the authorised development; and any derivative of “maintain” must be construed accordingly;
“Order limits” means the limits shown on the land plan and site location plan and the site layout and works plan;
“relevant planning authority” means the Borough Council of King’s Lynn and West Norfolk;
“Requirement” means a Requirement set out in Schedule 2 (Requirements); and a reference to a numbered Requirement is a reference to the Requirement set out in the paragraph of that Schedule with the same number;
“site layout and works plan” means the plan certified by the Secretary of State as the site layout and works plan under article 13;
“undertaker” means, subject to article 7(2) (consent to transfer benefit of Order), Palm Paper Limited(2) (company number 00813701).
(2) References in this Order to rights over land include references to rights to do, or to place and maintain, anything in, on or under land or in the air-space above its surface.
(3) All distances, directions and lengths referred to in this Order are approximate, and distances between points on a work comprised in the authorised development must be taken to be measured along that work.
(4) In this Order, “include” must be construed without limitation.
(5) References in this Order to any statutory body include that body’s successor bodies having jurisdiction over the authorised development.
1980 c.66. “Highway” is defined in section 328(1). For “highway authority”, see section 1.
The registered office of Palm Paper Limited is Saddlebow Industrial Estate, Poplar Avenue, King’s Lynn, Norfolk PE34 3AL.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: