PART 2E+W+SNSIP 2: THE CONSTRUCTION OF A NEW HIGHWAY
Commencement Information
I1Sch. 1 Pt. 2 in force at 2.2.2016, see art. 1
In the County of Leicestershire and the District of North West Leicestershire
Works No. 7E+W+S
Within the area of land described on the works plans as Works No. 7—
(1) The provision of the A50 (eastbound) to M1 (southbound) and Junction 24 interchange works, the general arrangement of which is shown on the regulation 6(2) plan (Document 2.4A), including—
(a)construction of new A50 to M1 southbound/Junction 24 interchange link roads (part);
(b)a new private access and haul route from the existing quarry to Junction 24 and an adjacent cycle track;
(c)construction of new bridges and retaining walls; and
(d)construction of surface water attenuation basins.
(2) The alteration of Warren Lane north of the A50 referred to in paragraph (1).
(3) The siting of a stock piling area for topsoil and subsoil material.
(4) The construction of temporary haul roads.