SCHEDULES

SCHEDULE 12LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Articles 29 and 30

PART 1NATIONAL GRID

Sedgemoor District Council – Section A

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94

Dismantling of redundant infrastructure

Work No. 4B

2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

95, 96, 99, 100, 102, 103, 104, 107, 109, 112, 122, 124, 127, 129, 130, 153, 156 & 160

Construction of authorised development

Work No. 1B

111, 118, 119, 137, 138, 146, 147, 148, 150, 151, 152 & 155

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1B

165, 167, 168, 171, 173 & 176

Construction of authorised development

Works Nos. 1A and 2A

163, 164 & 166

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1A and 2A

177, 178, 179 & 180

Construction of authorised development

Work No. 1A

Sedgemoor District Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

2, 3, 7, 25, 26, 27, 28, 30, 31, 48, 49, 50, 57 & 72

Construction of authorised development

Work No. 1B

4, 14, 36, 38, 39, 120, 125, 127, 131, 142, 159, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 273, 274, 278, 279, 281, 286, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 462, 463, 465, 470, 471, 472, 481, 485, 491, 495, 499, 500, 513, 531, 532, 533, 538, 543, 546, 547, 603.2, 603.3, 619, 625, 631, 660, 677 & 678

Dismantling of redundant infrastructure

Work No. 4B

5, 12, 15, 37, 76, 119, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 537, 591, 603.1, 620, 627, 641, 654 & 676

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

11, 16, 17, 40, 121, 122, 138, 139, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 267, 268, 270, 275, 276, 282, 283, 284, 287, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 459, 460, 464, 466, 478, 483, 484, 486, 496, 508, 509, 512, 621, 642, 653, 675 & 679

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

13, 18, 22, 23, 24, 45 & 46

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1B and 4B

44 & 47

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1B

58, 59, 60, 69, 70 & 71

Construction of authorised development

Works Nos. 1B and 1C

65, 66, 67, 68, 74, 75, 77, 87, 90, 93, 98, 103 & 104

Construction of authorised development

Work No. 1C

73, 82 & 83

Construction of authorised development

Works Nos. 1B, 1C and 4B

78, 79, 80, & 84

Construction of authorised development

Works Nos. 1C and 4B

81 & 86

Construction of authorised development

Works Nos. 1C and 4B

Removal of pylon foundations only to a depth of 1 metre

85, 88, 89, 91, 92, 94, 95, 99 & 100

Construction of authorised development

Works Nos. 1C and 1D

102, 108, 109, 111, 112, 113, 117, 199, 201, 202, 203, 206, 207, 210, 213, 214, 297, 298, 299, 302, 303, 306, 308, 309, 313, 316, 317, 318, 319, 321, 326, 330, 337, 339, 340, 342, 343, 344, 348, 350, 351, 354, 355, 356, 357, 374, 376, 436, 438, 440, 441, 442, 443, 446, 448, 451, 452, 517, 519, 521, 522, 523, 575, 577, 583, 590, 592, 594.1, 594.2, 601,1, 601.2, 605.1, 605.2, 605.3, 606.1, 606.2, 608.1, 608.2, 610, 613, 635 & 639

Construction of authorised development

Work No. 1D

118, 154, 156, 488, 489, 518 & 520

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1D and 4B

148, 149, 152, 197, 198, 200, 204, 205, 222, 223, 231, 245, 292, 294, 295, 311, 312, 314, 322, 324, 362, 363, 364 & 447

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1D

153

Dismantling of redundant infrastructure

Works Nos. 1D and 4B

155, 157, 158, 163, 164, 502, 503, 507, 516, 582, 618 & 640

Construction of authorised development

Works Nos. 1D and 4B

593, 595 & 596

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1D, 2B, 2C and 4B

597

Construction of authorised development

Works Nos. 1D, 2B, 2C and 4B

599

Construction of authorised development

Works Nos. 1D, 2B, 2D and 4B

611 & 612

Construction of authorised development

Works Nos. 2B, 2D and 4B

Removal of pylon foundations only to a depth of 1 metre

614, 615 & 616

Construction of authorised development

Works Nos. 1D, 2B and 4B

643, 652, 665, 681 & 682

Construction of authorised development

Works Nos. 2B and 4B

636, 646, 651, 655, 661, 669.1, 669.2, 671, 673, 674, 680, 683, 685, 688 & 689

Construction of authorised development

Work No. 2B

Sedgemoor District Council and North Somerset Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

664

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

Sedgemoor District Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1 & 2

Dismantling of redundant infrastructure

Work No. 4B

3, 4, 5, 7, 10, 11, 12, 16 & 17

Construction of authorised development

Work No. 2B

18

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

Sedgemoor District Council and North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

19 & 27

Construction of authorised development

Work No. 2B

29 & 30

Dismantling of redundant infrastructure

Work No. 4B

North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

28, 31, 32, 36, 38, 39, 40, 42, 45, 46, 48, 49, 52, 57, 60, 63, 67, 69, 70, 79, 80, 81, 82, 87, 90, 92, 95, 97, 100, 104, 105, 107, 109, 110, 113, 114, 117, 118, 120, 121, 124, 126, 127, 130, 131, 133, 135, 138, 144, 146, 148, 149, 150, 155, 163, 164, 168, 170, 173, 175, 177, 178, 192, 194, 195, 197, 198, 200, 201, 203, 204, 218, 219, 220, 221, 223, 224, 226, 229, 230, 232, 237, 239, 241, 243, 246, 250, 254, 255, 266, 269, 270, 273, 275 & 278

Construction of authorised development

Work No. 2B

41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 282, 283, 284 & 285

Dismantling of redundant infrastructure

Work No. 4B

43, 233 & 256

Construction of authorised development

Works Nos. 2B and 4B

50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 247, 251 & 272

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

181, 184, 185, 186, 208, 210 & 211

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

North Somerset Council – Section D

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 2, 5, 6, 14, 16, 18, 58, 59.1, 59.2, 60 & 64

Construction of authorised development

Work No. 2B

7, 8, 9, 11, 12, 13, 112.1, 112.2, 112.3, 115, 117, 188, 189, 197, 203, 205, 210, 211, 213, 229, 248, 249, 253, 254, 278, 279, 283, 284, 285, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 349, 351, 367, 372, 492, 529, 544.1, 544.2, 548, 557, 558, 559, 561, 566, 567, 571, 572, 575, 591, 594, 595, 602, 604, 605, 611, 612, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970

Dismantling of redundant infrastructure

Work No. 4B

10, 76, 106, 187, 194, 198, 212, 232, 252, 288, 297, 308, 339, 345, 361, 371, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

19

Construction of authorised development

Works Nos. 4B and 4C

Removal of pylon foundations only to a depth of 1 metre

20

Construction of authorised development

Works Nos. 4B and 4C

21, 23, 24, 27, 28, 31, 33, 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48

Construction of authorised development

Work No. 4C

22, 38 & 39

Dismantling of redundant infrastructure

Work No. 4C

25 & 47

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4C

26 & 32

Construction of authorised development

Work No. 4C

Removal of pylon foundations only to a depth of 1 metre

50 & 51

Construction of authorised development

Works Nos. 2B, 3A and 3B

52, 63, 70 & 73

Construction of authorised development

Works Nos. 2B and 3A

53 & 61

Construction of authorised development

Works Nos. 2B, 3A and 4B

62

Construction of authorised development

Works Nos. 2B, 3A and 4B

Removal of pylon foundations only to a depth of 1 metre

77, 78, 79, 80, 102, 120 & 121

Construction of authorised development

Work No. 3A

84, 85, 90, 92, 95, 214, 307, 309, 310, 334.1, 334.2, 335, 368, 377, 378, 380, 381, 382, 406, 540, 541, 580, 581, 680, 681, 682, 684, 687, 698, 758, 759 & 761

Construction of authorised development

Work No. 1E

86, 208, 218, 226, 303, 317, 320, 322, 323, 324, 325, 344, 358, 362, 365, 366, 546, 547, 562, 564, 576, 597, 598, 599, 600, 601, 603, 618, 619, 676 & 826

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

91, 256, 259, 266, 273, 275, 276, 316, 330, 374, 375, 403, 404, 405, 412, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551 & 552

Construction of authorised development

Works Nos. 1E and 4B

94, 96.1 & 96.2

Construction of authorised development

Works Nos. 1E and 4A

104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175 & 176

Construction of authorised development

Work No. 4A

131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4A

173, 178, 179, 180, 185, 186 & 193

Dismantling of redundant infrastructure

Work No. 4A

177

Construction of authorised development

Work No. 4A

Removal of pylon foundations only to a depth of 1 metre

183

Dismantling of redundant infrastructure

Work No. 4A

Removal of pylon foundations only to a depth of 1 metre

233, 235, 538, 588, 589, 607, 608, 685, 696, 700, 706, 710, 712, 713, 821, 823, 824, 974, 975 & 977

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1E

246, 263, 264, 268, 269, 270.1, 270.2, 271, 272, 299.1, 299.2, 301.1, 301.2, 302, 332.1, 332.2, 333, 337, 338, 369, 370, 373, 384, 386, 398, 399, 402, 407, 408.1, 408.2, 411, 436, 441, 447, 459, 460, 461, 462, 469, 472, 474, 477, 478, 531, 550, 555 & 556

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1E and 4B

326, 327, 328, 331, 563 & 565

Construction of authorised development

Work No. 4B

624, 783, 784, 785 & 833

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B and 4D

625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959

Dismantling of redundant infrastructure

Work No. 4D

626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980

Construction of authorised development

Work No. 4D

631, 633, 670, 769, 835, 873 & 907

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

632, 639, 640, 641, 642, 650, 651, 671, 905 & 960

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4D

703, 704, 816, 976.1 & 976.2

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1E, 4B and 4D

770, 777, 780 & 781.2

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

781.1 & 815

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

Removal of pylon foundations only to a depth of 1 metre

818

Construction of authorised development

Works Nos. 1E and 4D

981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020

Construction of authorised development

Work No. 4F

995 & 996

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4F

999 & 1000

Dismantling of redundant infrastructure

Work No. 4F

1001

Construction of authorised development

Work No. 4F

Removal of pylon foundations only to a depth of 1 metre

North Somerset Council – Section E

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 4, 6, 7, 163, 222, 232, 238 & 239

Construction of authorised development

Work No. 4D

10, 34 & 46

Construction of authorised development

Works Nos. 4B and 4D

11

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

13, 68, 70, 79, 135, 168, 169, 170, 174 & 175

Dismantling of redundant infrastructure

Work No. 4B

22, 109 & 111

Construction of authorised development

Work No. 1E

23, 30, 45, 54 & 66

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

Removal of pylon foundations only to a depth of 1 metre

37, 40, 49, 60, 63, 132, 133, 138, 149, 162, 191 & 194

Construction of authorised development

Works Nos. 1E and 4D

53, 112, 113, 154, 167 & 176

Construction of authorised development

Works Nos. 1E, 4B and 4D

96, 116 & 120

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207 & 208

Dismantling of redundant infrastructure

Work No. 4D

117, 118, 121, 122, 123, 134 & 144

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4D

142, 143, 155 & 171

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

172 & 173

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

North Somerset Council – Section F

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 140, 141, 142, 143, 144, 145, 146, 149, 156, 158, 219.1, 222, 224, 225, 228 & 229

Dismantling of redundant infrastructure

Work No. 4B

9, 20, 28, 37, 157, 201 & 219.2

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

43, 95, 98, 192, 194 & 213

Construction of authorised development

Work No. 4D

45, 94.3, 137, 147, 164, 165, & 262

Construction of authorised development

Work No. 1F

46, 48, 57, 72, 76, 88, 89, 90, 150, 151, 152, 153, 154, 155, 166, 214.1, 214.2 & 223

Dismantling of redundant infrastructure

Work No. 4D

64, 79, 200, 218 & 249

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

87

Construction of authorised development

Works Nos. 1E and 1F

148, 163 & 203

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B and 4D

160 & 161

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1F and 4D

176, 177, 178, 179, 186, 188, 196 & 217

Construction of authorised development

Works Nos. 1F and 4D

226, 230, 231, 233, 247 & 248

Construction of authorised development

Work No. 4E

227

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B, 4D, 4E, 4G and 4P

232, 278 & 298

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

234, 235, 240, 243, 276, 282 & 293

Dismantling of redundant infrastructure

Work No. 4G

253 & 255

Dismantling of redundant infrastructure

Work No. 4P

258

Dismantling of redundant infrastructure

Work No. 4P

Removal of pylon foundations only to a depth of 1 metre

260

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4P

266

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1F

269, 279, 280, 281, 294, 296, 300, 307, 312, 314, 316, 317 & 322

Construction of authorised development

Work No. 4P

284

Construction of authorised development

Work No. 4P

Removal of pylon foundations only to a depth of 1 metre

325

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1F, 4G and 4P

326, 327, 328, 329 & 330

Construction of authorised development

Works Nos. 1F and 4P

North Somerset Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

23.1, 23.2, 24.1, 24.2, 25, 112 & 113

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4G

35, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 & 86

Construction of authorised development

Work No. 1F

39.1, 39.2, 42 & 43

Dismantling of redundant infrastructure

Work No. 4G

82

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1F and 4G

111 & 138

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

120, 122, 124, 125, 127 & 130

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 1G and 4G

North Somerset Council and Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

139

Dismantling of redundant infrastructure

Work No. 4G

Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

143, 144, 145, 146, 148, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334

Dismantling of redundant infrastructure

Work No. 4G

147.1, 147.2, 260, 269, 302, 314 & 328

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

171, 172, 173, 176, 177, 229, 369, 370, 494, 495, 510, 533, 535, 538, 540, 544, 546, 548 & 549

Construction of authorised development

Work No. 1G

236, 241, 242, 243, 244, 245, 361, 365, 366, 507, 508 & 509

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 1G

261, 319, 320 & 321

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4G

335

Dismantling of redundant infrastructure

Works Nos. 4G and 4H

Removal of pylon foundations only to a depth of 1 metre

336

Construction of authorised development

Work No. 4K

337

Construction of authorised development

Works Nos. 4I and 4K

338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482, 498, 504, 517, 518 & 519

Dismantling of redundant infrastructure

Work No. 4H

351, 352.1, 352.2, 353.1, 353.2, 355, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441

Construction of authorised development

Works Nos. 1G and 4I

380

Construction of authorised development

Work No. 4I

397 & 409

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4H

398, 405, 440 & 502

Dismantling of redundant infrastructure

Work No. 4H

Removal of pylon foundations only to a depth of 1 metre

562 & 564

Construction of authorised development

Works Nos. 4M and 4N

565

Dismantling of redundant infrastructure

Work No. 4N

572 & 575

Construction of authorised development

Works Nos. 1G, 4L, 4M and 4N

593.1, 593.2, 594, 596 & 597

Construction of authorised development

Work No. 5

604, 605, 606, 607, 609 & 610

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4L, 4M, 4N, 4O and 5

608 & 611

Construction of authorised development

Works Nos. 4L, 4M, 4N, 4O and 5

South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

558 & 559

Construction of authorised development

Works Nos. 4M and 4N

560

Construction of authorised development

Works Nos. 1G, 4L, 4M and 4N

573

Construction of authorised development

Work No. 4L

Bristol City Council and South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

561

Construction of authorised development

Works Nos. 4M and 4N

574

Construction of authorised development

Work No. 4L

West Somerset District Council – Section H

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

6, 9, 11, 24, 25, 81.1 & 81.2

Construction of authorised development

Work No. 6E

29 & 30

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 6B, 6D and 6E

32

Construction of authorised development

Works Nos. 6B, 6D and 6E

33, 34, 60 & 64

Construction of authorised development

Works Nos. 6A, 6C and 6E

35, 37 & 65

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 6A, 6C and 6E

36 & 94

Construction of authorised development

Works Nos. 6A and 6C

43, 44 & 45

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 6A and 6C

53

Construction of authorised development

Works Nos. 6C and 6E

61 & 63

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 6A, 6B, 6C, 6D and 6E

82, 86 & 87

Dismantling of redundant infrastructure

Works Nos. 6B and 6D

Removal of pylon foundations only to a depth of 1 metre

83, 84 & 85

Dismantling of redundant infrastructure

Works Nos. 6B and 6D

88

Dismantling of redundant infrastructure

Work No. 6B

89, 90, 91 & 92

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 6B and 6D

111

Construction of authorised development

Work No. 6A

114 & 117

Construction of authorised development

Works Nos. 6C and 6D

115

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 6C

PART 2WESTERN POWER DISTRIBUTION

Sedgemoor District Council – Section A

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94

Dismantling of redundant infrastructure

Work No. 4B

2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

Sedgemoor District Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

4, 8, 9, 14, 36, 38, 39, 78, 84, 120, 125, 126, 127, 131, 132, 133, 134, 142, 153, 159, 160, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 252, 253, 254, 273, 274, 278, 279, 281, 286, 371, 378, 380, 383, 385, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 455, 462, 463, 465, 470, 471, 472, 476, 481, 485, 491, 494, 495, 498, 499, 500, 513, 514, 528, 530, 531, 532, 533, 534, 538, 540, 542, 543, 546, 547, 548, 551, 560, 572, 579, 587, 588, 589, 602, 603.2, 603.3, 604.2, 615, 619, 625, 626, 630, 631, 660, 666, 677 & 678

Dismantling of redundant infrastructure

Work No. 4B

5, 12, 15, 37, 76, 81, 86, 119, 135, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 370, 386, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 535, 537, 545, 558, 568, 578, 591, 603.1, 604.1, 611, 612, 620, 627, 641, 654, 659 & 676

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

10, 11, 13, 16, 17, 18, 19, 20, 22, 23, 24, 34, 40, 42, 45, 46, 73, 79, 80, 82, 83, 115, 118, 121, 122, 129, 130, 138, 139, 154, 156, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 256, 257, 258, 259, 260, 261, 262, 263, 264, 265, 267, 268, 270, 275, 276, 282, 283, 284, 287, 359, 368, 373, 381, 384, 388, 391, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 428, 429, 433, 435, 437, 439, 450, 459, 460, 464, 466, 469, 478, 479, 480, 483, 484, 486, 488, 489, 490, 496, 502, 503, 504, 506, 507, 508, 509, 511, 512, 515, 516, 518, 520, 525, 526, 536.1, 536.2, 539, 541, 544, 549, 550, 556, 559, 562, 569, 581, 582, 584, 586, 593, 595, 596, 597, 599, 609.1, 609.2, 609.3, 609.4, 614, 616, 617, 618, 621, 622, 623, 624, 632, 633, 634, 640, 642, 643, 644, 649, 650, 652, 653, 665, 675, 679, 681 & 682

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

Sedgemoor District Council and North Somerset Council – Section B

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

664

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

Sedgemoor District Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1 & 2

Dismantling of redundant infrastructure

Work No. 4B

6, 13, 15 & 19

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

14 & 18

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

Sedgemoor District Council and North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

25

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

29 & 30

Dismantling of redundant infrastructure

Work No. 4B

North Somerset Council – Section C

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

33, 34, 37, 42, 43, 44, 47, 53, 56, 61, 64, 65, 66, 67, 71, 76, 77, 78, 91, 96, 99, 106, 107, 114, 115, 117, 119, 122, 123, 125, 128, 129, 132, 134, 139, 145, 146, 154, 160, 161, 162, 167, 168, 171, 172, 176, 181, 182, 183, 184, 185, 186, 196, 202.1, 202.2, 204, 208, 210, 211, 219, 220, 221, 225, 233, 234, 249, 255, 256, 257, 267, 268, 273, 274, 277, 280 & 281

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 152, 153, 156, 157, 166, 180, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 276, 282, 283, 284 & 285

Dismantling of redundant infrastructure

Work No. 4B

50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 244, 247, 248, 251 & 272

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

North Somerset Council – Section D

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

3, 15 & 57

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B and 4C

4

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4A and 4B

7, 8, 9, 11, 12, 13, 17, 52, 53, 54, 55, 56, 61, 66, 68, 75, 88, 89, 112.1, 112.2, 112.3, 115, 117, 118, 188, 189, 190, 196, 197, 203, 204, 205, 210, 211, 213, 229, 231, 237.1, 237.2, 240, 243, 248, 249, 251, 253, 254, 255, 278, 279, 283, 284, 285, 286, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 348, 349, 351, 352, 367, 372, 394, 416, 419, 422, 424, 434, 452, 453, 467, 484, 485, 492, 504, 506, 514, 517, 529, 544.1, 544.2, 548, 557, 558, 559, 560, 561, 566, 567, 571, 572, 574, 575, 591, 592, 593, 594, 595, 602, 604, 605, 611, 612, 613, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 775, 776, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970

Dismantling of redundant infrastructure

Work No. 4B

10, 62, 76, 106, 187, 194, 198, 199, 212, 232, 236, 247, 252, 288, 297, 308, 339, 345, 361, 371, 391, 413, 430, 438, 455, 464, 494, 511, 521, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

18 & 20

Construction of authorised development

Works Nos. 4B and 4C

19

Construction of authorised development

Works Nos. 4B and 4C

Removal of pylon foundations only to a depth of 1 metre

21, 23, 24, 27, 28, 29, 31, 33, 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48

Construction of authorised development

Work No. 4C

22, 30, 38 & 39

Dismantling of redundant infrastructure

Work No. 4C

25 & 47

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4C

26 & 32

Construction of authorised development

Work No. 4C

Removal of pylon foundations only to a depth of 1 metre

63, 67, 69, 74.1, 74.2, 77, 83, 86, 87, 102, 200, 208, 217, 218, 219, 220.1, 220.2, 221, 223, 224, 225, 226, 227, 228, 233, 234, 235, 241, 242, 244, 245, 246, 250, 257, 258, 262, 263, 264, 265, 267, 268, 269, 270.1, 270.2, 271, 272, 274, 277, 280, 282, 287, 291, 292, 293, 294, 295, 299.1, 299.2, 301.1, 301.2, 302, 303, 305.1, 305.2, 307, 311, 315.1, 315.2, 316, 317, 320, 322, 323, 324, 325, 332.1, 332.2, 333, 336, 337, 338, 340, 343, 344, 346, 350, 354, 355, 356, 357.1, 357.2, 358, 359, 362, 363, 364, 365, 366, 369, 370, 373, 376, 377, 378, 383, 384, 385, 386, 387, 388, 390, 392, 393, 395, 396, 397, 398, 399, 400, 402, 407, 408.1, 408.2, 409, 410, 411, 414, 417, 418, 420, 425, 427, 428, 429, 431, 432, 436, 437, 439, 440, 441, 442, 445, 446, 447, 448, 449, 450, 451, 454, 456, 457, 458, 459, 460, 461, 462, 466, 468.1, 468.2, 469, 472, 473, 474, 477, 478, 479, 481, 482, 483, 486, 490, 491, 500, 502, 503, 505, 507, 510, 512, 513, 515, 516, 518, 523, 531, 532, 546, 547, 550, 555, 556, 562, 564, 568, 569, 570, 576, 585, 587, 588, 589, 590, 597, 598, 599, 600, 601, 603, 607, 608, 609, 618, 619, 676, 680, 685, 686, 687 & 826

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

65

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4A, 4B and 4C

104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 120, 121, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175, 176 & 177

Construction of authorised development

Work No. 4A

131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4A

173, 178, 179, 180, 185, 186, 192 & 193

Dismantling of redundant infrastructure

Work No. 4A

183

Dismantling of redundant infrastructure

Work No. 4A

Removal of pylon foundations only to a depth of 1 metre

256, 266, 273, 275, 276, 326, 327, 328, 330, 331, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551, 552, 563 & 565

Construction of authorised development

Work No. 4B

624, 702, 703, 704, 707, 759, 760, 762, 772, 782.1, 782.2, 783, 784, 785, 816, 817, 833, 976.1 & 976.2

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B and 4D

625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959

Dismantling of redundant infrastructure

Work No. 4D

626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 818, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980

Construction of authorised development

Work No. 4D

631, 633, 670, 769, 835, 873 & 907

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

632, 639, 640, 641, 642, 650, 651, 671, 905 & 960

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4D

758

Construction of authorised development

Works Nos. 4B and 4D

764, 765, 770, 777, 780 & 781.2

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

771, 781.1 & 815

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

Removal of pylon foundations only to a depth of 1 metre

981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020

Construction of authorised development

Work No. 4F

995 & 996

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4F

999 & 1000

Dismantling of redundant infrastructure

Work No. 4F

1001

Construction of authorised development

Work No. 4F

Removal of pylon foundations only to a depth of 1 metre

North Somerset Council – Section E

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 4, 6, 7, 33, 37, 40, 49, 50, 59, 60, 63, 132, 133, 138, 146, 149, 162, 163, 191, 194, 222, 232, 238 & 239

Construction of authorised development

Work No. 4D

10, 34, 43, 46, 53, 94, 103, 104, 109, 110, 112, 113, 154, 167 & 176

Construction of authorised development

Works Nos. 4B and 4D

11, 16, 19, 29 & 93

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

13, 14, 68, 70, 77, 79, 105, 127, 128, 135, 136, 145, 159, 168, 169, 170, 174 & 175

Dismantling of redundant infrastructure

Work No. 4B

23, 30, 45, 54 & 66

Dismantling of redundant infrastructure

Works Nos. 4B and 4D

Removal of pylon foundations only to a depth of 1 metre

44, 57, 65, 96, 116 & 120

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

78, 126, 142, 143, 155 & 171

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

95.1, 95.2, 97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207, 208, 209 & 210

Dismantling of redundant infrastructure

Work No. 4D

117, 118, 121, 122, 123, 134 & 144

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4D

160

Construction of authorised development

Works Nos. 4B and 4D

131, 137, 172 & 173

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

North Somerset Council – Section F

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4B

5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 139, 140, 141, 142, 143, 144, 145, 146, 149 156, 158, 159, 219.1, 222, 224, 225, 228 & 229

Dismantling of redundant infrastructure

Work No. 4B

9, 20, 28, 37, 157, 201 & 219.2

Dismantling of redundant infrastructure

Work No. 4B

Removal of pylon foundations only to a depth of 1 metre

38, 40, 41, 45, 60, 160, 161, 162 & 165

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4D

39, 64, 79, 81, 200, 218 & 249

Dismantling of redundant infrastructure

Work No. 4D

Removal of pylon foundations only to a depth of 1 metre

43, 67, 95, 98, 137, 176, 177, 178, 179, 186, 188, 192, 194, 196, 213 & 217

Construction of authorised development

Work No. 4D

46, 47, 48, 57, 58, 59, 69, 72, 74, 76, 78, 82, 83, 84, 88, 89, 90, 91, 150, 151, 152, 153, 154, 155, 166, 167, 168, 169, 170, 172, 199, 214.1, 214.2 & 223

Dismantling of redundant infrastructure

Work No. 4D

148, 163, 203 & 204

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B and 4D

226, 230, 231, 233, 247 & 248

Construction of authorised development

Work No. 4E

227

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4B, 4D, 4E, 4G and 4P

232, 278, 298 & 320

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

234, 235, 240, 243, 276, 282, 293, 302 & 304

Dismantling of redundant infrastructure

Work No. 4G

253, 255 & 285

Dismantling of redundant infrastructure

Work No. 4P

258

Dismantling of redundant infrastructure

Work No. 4P

Removal of pylon foundations only to a depth of 1 metre

260 & 264

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4P

267, 269, 279, 280, 281, 288, 294, 296, 300, 307, 312, 314, 316, 317, 322, 326, 327, 328, 329 & 330

Construction of authorised development

Work No. 4P

284

Construction of authorised development

Work No. 4P

Removal of pylon foundations only to a depth of 1 metre

303, 313 & 325

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4G and 4P

North Somerset Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

38, 39.1, 39.2, 42, 43, 45, 46, 47.1, 47.2, 48, 52,57, 58.1, 58.2, 59, 64, 69, 84, 107, 118, 134 & 137

Dismantling of redundant infrastructure

Work No. 4G

53, 61, 65, 108, 111, 116 & 138

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

23.1, 23.2, 24.1, 24.2, 25, 82, 112, 113, 119, 120, 121, 122, 124, 125, 127, 128 & 130

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4G

North Somerset Council and Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

139

Dismantling of redundant infrastructure

Work No. 4G

Bristol City Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

143, 144, 145, 146, 148, 151, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334

Dismantling of redundant infrastructure

Work No. 4G

147.1, 147.2, 260, 269, 302, 314 & 328

Dismantling of redundant infrastructure

Work No. 4G

Removal of pylon foundations only to a depth of 1 metre

261, 319, 320 & 321

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4G

335

Dismantling of redundant infrastructure

Works Nos. 4G and 4H

Removal of pylon foundations only to a depth of 1 metre

336

Construction of authorised development

Work No. 4K

337

Construction of authorised development

Works Nos. 4I and 4K

338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 378, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482, 498, 499, 500, 501, 503, 504, 514, 515, 517, 518 & 519

Dismantling of redundant infrastructure

Work No. 4H

351, 352.1, 352.2, 353.1, 353.2, 355, 380, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441

Construction of authorised development

Work No. 4I

397 & 409

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Work No. 4H

398, 405, 440 & 502

Dismantling of redundant infrastructure

Work No. 4H

Removal of pylon foundations only to a depth of 1 metre

562 & 564

Construction of authorised development

Works Nos. 4M and 4N

563, 570, 571, 572 & 575

Construction of authorised development

Works Nos. 4L, 4M and 4N

565

Dismantling of redundant infrastructure

Work No. 4N

572

Construction of authorised development

Works Nos. 4L, 4M and 4N

599

Dismantling of redundant infrastructure

Work No. 4L

Removal of pylon foundations only to a depth of 1 metre

604, 605, 606, 607, 609 & 610

Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access

Works Nos. 4L, 4M, 4N and 4O

608 & 611

Construction of authorised development

Works Nos. 4L, 4M, 4N and 4O

South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

558 & 559

Construction of authorised development

Works Nos. 4M and 4N

560

Construction of authorised development

Works Nos. 4L, 4M and 4N

573

Construction of authorised development

Work No. 4L

Bristol City Council and South Gloucestershire Council – Section G

(1)

Plot number of land shown on Land Plan

(2)

Purpose for which temporary possession may be taken

(3)

Relevant part of the authorised development

(4)

Element of Work in respect of which land is not required to be re-instated

561

Construction of authorised development

Works Nos. 4M and 4N

574

Construction of authorised development

Work No. 4L