Search Legislation

The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Girton Interchange A14 Westbound Link

4.  A 2 kilometre length of new highway to be classified as part of the A14 Trunk Road commencing from a point 85 metres north-east of the centre point of the overbridge carrying the existing A14 Trunk Road over the existing M11 motorway (the M11 Overbridge) and continuing in a westerly then a north-north-westerly direction to a point 158 metres north-west of where Beck Brook passes below the existing A14 Trunk Road in a culvert,

identified by a blue line on the classification of roads plans – sheet 2.

Back to top

Options/Help