The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016

Article 30

SCHEDULE 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1)

Location

(2)

Plot Reference Number(s) shown on land plans

(3)

Purpose for which temporary possession may be taken

(4)

Relevant part of the authorised development

The land plans – sheet 1

In the administrative

area of Huntingdonshire District Council

1/1q, 1/1r, 1/1s, and 1/1tRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
1/1a, 1/1b, 1/1c, 1/1d, 1/1e, 1/1g, 1/1h, 1/1j, 1/1k, 1/1l, 1/1m, 1/1n, 1/1o,1/1p, 1/1u, 1/1v,1/1w and 1/1xHighway land required for improvement works to the A1(M).Work No. 1
The land plans – sheet 2

In the administrative

area of Huntingdonshire District Council

2/1a, 2/1b, 2/1c, 2/1e and 2/1gHighway land required for improvement works to the A1(M).

Work No.1

2/1p and 2/4aRequired to provide working space for the works associated with the construction of a new access track to drainage attenuation facilities.Work No. 1
2/9d and 2/11d

Required for the provision of soil storage areas.

Work No. 1
2/12bRequired to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)Works Nos. 1 and 2
The land plans – sheet 3

In the administrative

area of Huntingdonshire District Council

3/2bRequired to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)Works Nos. 1 and 2
3/5bRequired for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Works Nos. 4.1 and 4.2.Works Nos. 4.1 and 4.2
3/6dRequired for the provision of soil storage areas.Work No. 1
3/6e and 3/7dRequired to provide working space and temporary access for works associated with the construction of drainage attenuation facilities and flood plain compensation areas on adjacent land.Work No. 1
3/5c

Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area.

Work No. 1
The land plans – sheet 4

In the administrative

area of Huntingdonshire District Council

4/1a, 4/1b, 4/1c, 4/1d, 4/1e, 4/1f, 4/1g, 4/1h, 4/1j, 4/1l, 4/1m, 4/1r, 4/1s, 4/1t, 4/3 and 4/4

Highway land required for improvement works to the A14(T).Work No. 5
4/2a

Required for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Work Nos. 4.1 and 4.2.

Works Nos. 4.1 and 4.2
The land plans – sheet 5

In the administrative

area of Huntingdonshire District Council

5/1alRequired for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.Work No. 5
5/1w, 5/1ag, 5/5e, 5/33b and 5/34Required to provide working space and temporary access for works associated with the improvement of A1(T).Work No. 1
5/23cRequired to provide working space and temporary access for works associated with the construction of the new Ellington Junction.Works Nos. 3 and 5
5/25bRequired for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange and to provide working space and temporary access for works associated with the construction of the improved A1(T).Works Nos.1 and 5
5/2aRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area.Work No. 1
5/23bRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
5/38gRequired for the construction of a new private means of access to High Harthay Farm.Works Nos. 3 and 5
5/5j and 5/22cRequired to provide working space and temporary access for works associated with the construction of an access track to drainage attenuation facilities and flood plain compensation area on adjacent land.Work No. 1
The land plans – sheet 6

In the administrative

area of Huntingdonshire District Council

6/22aRequired for the construction of a new private means of access to High Harthay Farm.Works Nos. 3 and 5
6/16b, 6/18, 6/19, 6/20 and 6/21Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.Works Nos. 1 and 5
The land plans – sheet 7

In the administrative

area of Huntingdonshire District Council

7/6b, 7/6c and 7/8aRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.Works Nos. 1 and 5
7/1j, 7/4b, 7/7b, 7/7c, 7/7d, 7/11c, 7/11d, and 7/16bRequired for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T), the improved A1(T), Brampton Interchange and the new Grafham Road.Works Nos. 1, 5, 6 and 7
7/10, 7/11f, 7/12, 7/13a, 7/13d, 7/20 and 7/21Required for the improvement of Grafham Road and the byway known as Mere Lane.Works Nos. 1 and 6
7/13c

Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.

Works Nos. 1 and 7
7/9b and 7/9cRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
The land plans – sheet 8

In the administrative

area of Huntingdonshire District Council

8/1d, 8/1e, 8/1f, 8/2, 8/3a and 8/6Required for the improvement of the byway known as Mere Lane.Work No. 1
8/5b and 8/5cRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
8/1n, 8/5d and 8/7bRequired for the provision of soil storage areas.Works Nos. 5, 7, 8, 9 and 10
8/7cRequired to provide working space and temporary access for works associated with the improvement of Brampton Road.Work No.10
8/17b, 8/19b, 8/22b and 8/25aRequired for the provision of a temporary access route from Brampton Road to a soil storage area.Work No. 5
8/21e and 8/21m

Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T).

Work No. 5
8/21c and 8/21bRequired to provide working space and temporary access for works associated with the improvement of a private means of access to Lodge Farm.Works No. 5
8/21hRequired to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood compensation areas on adjacent land.Works Nos. 5 and 10
8/21j and 8/31bRequired to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.Works Nos. 5 and 10
8/32a and 8/32bRequired to provide working space and temporary access for works associated with the provision of environmental mitigation.Work No. 5
The land plans – sheet 9

In the administrative

area of Huntingdonshire District Council

9/2aRequired to provide working space and temporary access for works associated with the construction of the new River Great Ouse viaduct.Work No. 5
9/2dRequired to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood plain compensation areas on adjacent land.Works Nos. 5 and 10
The land plans – sheet 10

In the administrative

area of Huntingdonshire District Council

10/2a, 10/4c and 10/4fRequired for the provision of soil storage areas and working space and temporary access for the provision of new private means of access.Works Nos. 5 and 11
10/7cRequired for the provision of an accommodation track for Wybosten Farm.Work No. 5
10/9Required to provide working space and temporary access for the diversion of utility equipment on adjacent land.Work No. 53
The land plans – sheet 11

In the administrative

area of Huntingdonshire District Council

11/2b, 11/8d and 11/9Required for the provision of soil storage areas.Works Nos. 5, 12 and 13
11/6b and 11/8aRequired for the provision of soil storage areas and to provide working space and temporary access for works associated with the provision of ecological mitigation.Works Nos. 5, 12 and 13
The land plans – sheet 12

In the administrative

area of Huntingdonshire District Council

12/2a, 12/2c, 12/6b and 12/6cRequired for the provision of soil storage areas.Works Nos. 5 and 13
12/5b, 12/8b, and 12/10bRequired for the provision of soil storage areas and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.Works Nos. 5 and 13
12/11c and 12/13bRequired for the construction of a new private means of access and accommodation track.Work No. 13
12/12aRequired for the construction of a new private means of access and to provide working space and temporary access for works associated with the construction of the new Ermine Street Junction.Work No. 13
The land plans – sheet 13

In the administrative

area of Huntingdonshire District Council

13/3bRequired for the provision of soil storage areas.Works Nos. 5 and 14
13/7Required to provide working space and temporary access for works associated with the improvement of Mere Way.Work No.14
The land plans – sheet 14

In the administrative

area of Huntingdonshire District Council

14/2bRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.Works Nos. 5 and 15
The land plans – sheet 15

In the administrative

area of Huntingdonshire District Council

15/1a, 15/1b, 15/18a and 15/18eRequired to provide working space and temporary access for works associated with the stopping up of Conington Road and the construction of the new Conington Road.

Work No. 17

15/11cRequired to provide working space and temporary access for works associated with the provision of ecological mitigation.Works Nos. 5 and 16
15/9b, 15/11b and 15/16bRequired for the provision accommodation tracks.Works Nos. 5 and 16
15/19aRequired to provide working space and temporary access for works associated with the provision of new private means of access.Work No.17
The land plans – sheet 16

In the administrative

areas of Huntingdonshire District Council and South Cambridgeshire District Council

16/1a, 16/1b, 16/1c, 16/1d and 16/1gRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
16/8a, 16/8b, 16/12b, 16/12c and 16/14cRequired for the works associated with the stopping up of Footpaths 87/6, 87/14 and 53/1.Work No. 5
16/3c, 16/5b and 16/7bRequired for the construction of a new private means of access and accommodation track.Work No. 17
16/3fRequired for working space and temporary access for the diversion of utility equipment.Work No. 63
16/9b and 16/12dRequired for the construction of a new private means of access.Work No. 17
16/21a, 16/21b and 16/22Required to provide working space and temporary access for works associated with the stopping up of Footpath 53/2.Work No. 5
The land plans – sheet 17

In the administrative

area of South Cambridgeshire District Council

17/1a, 17/1b, 17/1e and 17/1f.Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5

In the administrative

area of South Cambridgeshire District Council

17/4d, 17/6.Required to provide an ecological mitigation area.Work No. 5
The land plans – sheet 18

In the administrative

area of South Cambridgeshire District Council

18/6eRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
The land plans – sheet 19

In the administrative

area of South Cambridgeshire Council

19/10b, 19/11 and 19/12bRequired to enable the strengthening of Boxworth Road to provide access to Borrow Pit comprising Work No. 4.12 and associated soil storage areas.Work No. 4.12
The land plans – sheet 20

In the administrative

area of South Cambridgeshire District Council

20/2d, 20/3 and 20/4aRequired to enable the strengthening of Boxworth Road to provide access to Borrow Pit 4.12 and associated soil storage areas.Work No. 4.12
20/5Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit Work No. 4.12 and associated soil storage areas, and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
20/2b and 20/6bRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.All Works.
20/13e and 20/13dRequired to provide working space and temporary access for the diversion of utility equipment on adjacent land.Work Nos. 5, 71, 81 and 82
20/16b, 20/16c, 20/18a, 20/18b, 20/21b and 20/21cRequired to provide working space and temporary access for the works associated with the construction of the new footway, cycle track and equestrian track associated with the new Local Access Road.Work No. 22
20/25dRequired to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.Work No. 5
The land plans – sheet 21

In the administrative

area of South Cambridgeshire District Council

21/2b and 21/5aRequired to provide working space for works in connection with the diversion of pipes associated with the Sewage Works.Work No. 72
21/8bRequired for the provision of soil storage areas.Work No. 5
21/10bRequired for the provision of soil storage areas.Works No. 5 and 23
The land plans – sheet 22
22/17e, 22/27d and 22/28cRequired to provide working space and temporary access for works associated with the construction of flood plain compensation areas on adjacent land.Works Nos. 5 and 22
22/17dRequired for the provision of soil storage areas.Works Nos. 5, 22 and 24
22/17f, 22/27b, and 22/28bRequired for the construction of a new private means of access.Work Nos. 5
22/28dRequired to provide working space for works associated with the new Local Access Road.Work No.22
The land plans – sheet 23

In the administrative

area of South Cambridgeshire District Council

23/2bRequired for working space for the works associated with the protection of existing utilities.Works Nos. 5
23/10bRequired for the provision of soil storage areas.Works Nos. 5, 25, and 26
23/8b, 23/8c and 23/13aRequired to enable the construction of a new private means of access to Hackers Fruit Farm.Work No. 27
23/6bRequired to provide working space for the works associated with the construction of the new Cambridge Crematorium Access Road and new Local Access Road between Oakington Road and Huntingdon Road.Work No. 27
23/14bRequired to enable the construction of a new private means of access to Cambridge Crematorium.Work No. 27
23/20bRequired for working space for the works associated with the protection of existing utilities.Work No. 26
The land plans – sheet 24

In the administrative

area of South Cambridgeshire District Council

24/3b and 24/3cRequired for working space for the works associated with the protection of existing utilities.Work No. 27
24/3d, 24/3j and 24/3kRequired to provide working space for the works associated with the construction of the new Local Access Road between Oakington Road and Huntingdon Road.Work No. 27
24/3g and 24/9aRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste, and to provide working space for works associated with the construction of a new Local Access Road between Oakington Road and Huntingdon Road and the construction of drainage attenuation facilities.All Works.
24/7aRequired for working space for the works associated with the protection of existing utilities.Work No. 26
24/10aRequired for the provision of soil storage areas.Works No. 27 and 29
24/10eRequired for the works associated with the stopping up of Footpath 99/7.Work No. 27
The land plans – sheet 25

In the administrative

area of South Cambridgeshire District Council

25/2aRequired for the provision of soil storage areas.Works No. 27 and 29
25/7bRequired for working space for the works associated with the protection of existing of utilities.Work No. 26
The land plans – sheet 26

In the administrative

area of South Cambridgeshire District Council

26/2aRequired for working space for the works associated with the protection of existing utilities.Work No. 26
26/32b, 26/34a, 26/35, 26/36 and 26/37aRequired for the provision of soil storage areas and for working space for the works associated with the diversion of utilities.Works Nos. 33 and 84
26/40bRequired to provide working space for the works associated with the improvement of Histon Junction and the diversion of utilities.Works Nos. 33 and 86
The land plans – sheet 27

In the administrative

area of South Cambridgeshire District Council

27/17a and 27/18bRequired to provide working space and temporary access for the works associated with the provision of new private means of access.Work No. 33
The land plans – sheet 28

In the administrative

area of South Cambridgeshire District Council

28/2c and 28/7aRequired to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass and associated environmental mitigation.Work No. 33
28/1h and 28/8bRequired to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass including associated environmental mitigation and the diversion of utilities.Works Nos. 33 and 87
The land plans – sheet 29

None

---
The land plans – sheet 30

In the administrative

area of Huntingdonshire District Council

30/1a, 30/1d, 30/1e, 30/1f and 30/1gRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 31

In the administrative

area of Huntingdonshire District Council

31/1a, 31/1b, 31/1c, 31/1d, and 31/1e.Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 32

In the administrative

area of Huntingdonshire District Council

32/1a, 32/1b, 32/1c, 32/1d, 32/1e, 32/1f, 32/1g, 32/1h, 32/1j, 32/1k, 32/1l, 32/1m, 32/1n, 32/1o, 32/1p, 32/1q, 32/1r, 32/1s, 32/1t, 32/1u, 32/1v, 32/2 and 32/3, 32/4Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, and between Huntingdon and Brampton Hut Interchange.Work No. 5
The land plans – sheet 33

In the administrative

area of Huntingdonshire District Council

33/1b, 33/1e, 33/1f, 33/1g, 33/1h, 33/1j, 33/1k, 33/1l, 33/1m, 33/1n, 33/2, 33/3, 33/4, 33/5a, 33/5b, 33/6 and 33/7Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.Work No. 5
The land plans – sheet 34

In the administrative

area of Huntingdonshire District Council

34/1a, 34/1b, 34/1c, 34/1d, 34/1g, 34/1ah, 34/1aj and 34/1akRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
34/1k, 34/1l, 34/1n, 34/1o, 34/1p, 34/4b, 34/4c, 34/25b, 34/31b and 34/32bRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, the stopping up of the A14(T) in Huntingdon and to provide working space and temporary access for works in connection with the demolition of the Huntingdon A14 viaduct.Works Nos. 5, 35 and 36
34/49b, 34/55, 34/51b and 34/51cRequired to provide working space and temporary access for works associated with the construction of the new Mill Common Link Road and the improvement of the existing Mill Common Road.Works Nos. 36 and 37
34/5bRequired to provide working space and temporary access for works associated with the construction of the new Views Common Link Road.Work No. 34
34/5c, 34/10 and 34/11aRequired to provide working space for works associated with the construction of new private means of access to Cambridgeshire Constabulary HQ from the new Views Common Link Road.Work No. 34
34/6b, 34/12 and 34/13Highway land required for improvement works to the Brampton Road to Hinchingbrooke Park Road Link.Works Nos. 34 and 35
34/34cRequired to provide working space for the isolation of a gas main associated with the construction of the new Views Common Link.Work No. 36
34/23 and 34/25fRequired to provide working space and temporary access for works associated with the improvement of B1514 Brampton Road.Work No. 35
The land plans – sheets 35

In the administrative

area of Huntingdonshire District Council

35/1a, 35/1b, 35/1c, 35/1d, 35/1e, 35/1f, 35/1g, 35/1h, 35/1j, 35/1k, 35/1l, 35/1m, 35/1n, 35/1o, 35/1p, 35/1q, 35/1r, 35/1s, 35/1t, 35/1u, 35/1v, 35/1w, 35/1x, 35/1y, 35/1z, 35/2, 35/3 35/4 and 35/5Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 36

In the administrative

area of Huntingdonshire District Council

36/1a, 36/1b, 36/1c, 36/1d, 36/1e, 36/1f, 36/1g, 36/1h, 36/1j, 36/1l, 36/1m 36/1n and 36/1o,Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 37

In the administrative

area of Huntingdonshire District Council

37/1a, 37/1b, 37/1c, 37/1d, 37/1e, 37/1f, 37/1g, 37/1h, 37/1j, 37/1k, 37/1l, 37/1m, 37/1n and 37/2Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 38

In the administrative

area of Huntingdonshire District Council

38/1a, 38/1b, 38/1c, 38/1d, 38/1e, 38/1f, 38/1g, 38/1h, 38/1j, 38/1k, 38/1l, 38/1m, 38/1n, 38/1o and 38/2Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No. 5
The land plans – sheet 39

In the administrative

area of Huntingdonshire District Council

39/1a, 39/1b, 39/1c, 39/1d, 39/1e, 39/1g, 39/1h, 39/1j, 39/1k, 39/1l, 39/1m, 39/1n, 39/1o, 39/1p, 39/1q, 39/1r and 39/2Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No.5
The land plans – sheet 40

In the administrative

areas of Huntingdonshire District Council and South Cambridgeshire District Council

40/1a, 40/1b, 40/1c, 40/1e, 40/1f, 40/1g, 40/1h, 40/1j, 40/1k, 40/1l, 40/1m, 40/1n, 40/1o, 40/1p, 40/1q, 40/1s, 40/1t, 40/1u, 40/2, 40/3 and 40/4Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.Work No.5
40/8, 40/12, 40/9a, 40/10b, 40/11b and 40/11cRequired for the works associated with the stopping up of Footpath 87/6 and 87/14.Work No. 17
40/6dRequired for the construction of an accommodation track.Work No.17
40/6fRequired for working space and temporary access for the diversion of utility equipment.Work No.63