Article 30
SCHEDULE 7LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
(1) Location | (2) Plot Reference Number(s) shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development | |
---|---|---|---|---|
The land plans – sheet 1 | ||||
In the administrative area of Huntingdonshire District Council | 1/1q, 1/1r, 1/1s, and 1/1t | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
1/1a, 1/1b, 1/1c, 1/1d, 1/1e, 1/1g, 1/1h, 1/1j, 1/1k, 1/1l, 1/1m, 1/1n, 1/1o,1/1p, 1/1u, 1/1v,1/1w and 1/1x | Highway land required for improvement works to the A1(M). | Work No. 1 | ||
The land plans – sheet 2 | ||||
In the administrative area of Huntingdonshire District Council | 2/1a, 2/1b, 2/1c, 2/1e and 2/1g | Highway land required for improvement works to the A1(M). | Work No.1 | |
2/1p and 2/4a | Required to provide working space for the works associated with the construction of a new access track to drainage attenuation facilities. | Work No. 1 | ||
2/9d and 2/11d | Required for the provision of soil storage areas. | Work No. 1 | ||
2/12b | Required to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T) | Works Nos. 1 and 2 | ||
The land plans – sheet 3 | ||||
In the administrative area of Huntingdonshire District Council | 3/2b | Required to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T) | Works Nos. 1 and 2 | |
3/5b | Required for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Works Nos. 4.1 and 4.2. | Works Nos. 4.1 and 4.2 | ||
3/6d | Required for the provision of soil storage areas. | Work No. 1 | ||
3/6e and 3/7d | Required to provide working space and temporary access for works associated with the construction of drainage attenuation facilities and flood plain compensation areas on adjacent land. | Work No. 1 | ||
3/5c | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area. | Work No. 1 | ||
The land plans – sheet 4 | ||||
In the administrative area of Huntingdonshire District Council | 4/1a, 4/1b, 4/1c, 4/1d, 4/1e, 4/1f, 4/1g, 4/1h, 4/1j, 4/1l, 4/1m, 4/1r, 4/1s, 4/1t, 4/3 and 4/4 | Highway land required for improvement works to the A14(T). | Work No. 5 | |
4/2a | Required for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Work Nos. 4.1 and 4.2. | Works Nos. 4.1 and 4.2 | ||
The land plans – sheet 5 | ||||
In the administrative area of Huntingdonshire District Council | 5/1al | Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange. | Work No. 5 | |
5/1w, 5/1ag, 5/5e, 5/33b and 5/34 | Required to provide working space and temporary access for works associated with the improvement of A1(T). | Work No. 1 | ||
5/23c | Required to provide working space and temporary access for works associated with the construction of the new Ellington Junction. | Works Nos. 3 and 5 | ||
5/25b | Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange and to provide working space and temporary access for works associated with the construction of the improved A1(T). | Works Nos.1 and 5 | ||
5/2a | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area. | Work No. 1 | ||
5/23b | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | ||
5/38g | Required for the construction of a new private means of access to High Harthay Farm. | Works Nos. 3 and 5 | ||
5/5j and 5/22c | Required to provide working space and temporary access for works associated with the construction of an access track to drainage attenuation facilities and flood plain compensation area on adjacent land. | Work No. 1 | ||
The land plans – sheet 6 | ||||
In the administrative area of Huntingdonshire District Council | 6/22a | Required for the construction of a new private means of access to High Harthay Farm. | Works Nos. 3 and 5 | |
6/16b, 6/18, 6/19, 6/20 and 6/21 | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land. | Works Nos. 1 and 5 | ||
The land plans – sheet 7 | ||||
In the administrative area of Huntingdonshire District Council | 7/6b, 7/6c and 7/8a | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land. | Works Nos. 1 and 5 | |
7/1j, 7/4b, 7/7b, 7/7c, 7/7d, 7/11c, 7/11d, and 7/16b | Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T), the improved A1(T), Brampton Interchange and the new Grafham Road. | Works Nos. 1, 5, 6 and 7 | ||
7/10, 7/11f, 7/12, 7/13a, 7/13d, 7/20 and 7/21 | Required for the improvement of Grafham Road and the byway known as Mere Lane. | Works Nos. 1 and 6 | ||
7/13c | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land. | Works Nos. 1 and 7 | ||
7/9b and 7/9c | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | ||
The land plans – sheet 8 | ||||
In the administrative area of Huntingdonshire District Council | 8/1d, 8/1e, 8/1f, 8/2, 8/3a and 8/6 | Required for the improvement of the byway known as Mere Lane. | Work No. 1 | |
8/5b and 8/5c | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | ||
8/1n, 8/5d and 8/7b | Required for the provision of soil storage areas. | Works Nos. 5, 7, 8, 9 and 10 | ||
8/7c | Required to provide working space and temporary access for works associated with the improvement of Brampton Road. | Work No.10 | ||
8/17b, 8/19b, 8/22b and 8/25a | Required for the provision of a temporary access route from Brampton Road to a soil storage area. | Work No. 5 | ||
8/21e and 8/21m | Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T). | Work No. 5 | ||
8/21c and 8/21b | Required to provide working space and temporary access for works associated with the improvement of a private means of access to Lodge Farm. | Works No. 5 | ||
8/21h | Required to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood compensation areas on adjacent land. | Works Nos. 5 and 10 | ||
8/21j and 8/31b | Required to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land. | Works Nos. 5 and 10 | ||
8/32a and 8/32b | Required to provide working space and temporary access for works associated with the provision of environmental mitigation. | Work No. 5 | ||
The land plans – sheet 9 | ||||
In the administrative area of Huntingdonshire District Council | 9/2a | Required to provide working space and temporary access for works associated with the construction of the new River Great Ouse viaduct. | Work No. 5 | |
9/2d | Required to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood plain compensation areas on adjacent land. | Works Nos. 5 and 10 | ||
The land plans – sheet 10 | ||||
In the administrative area of Huntingdonshire District Council | 10/2a, 10/4c and 10/4f | Required for the provision of soil storage areas and working space and temporary access for the provision of new private means of access. | Works Nos. 5 and 11 | |
10/7c | Required for the provision of an accommodation track for Wybosten Farm. | Work No. 5 | ||
10/9 | Required to provide working space and temporary access for the diversion of utility equipment on adjacent land. | Work No. 53 | ||
The land plans – sheet 11 | ||||
In the administrative area of Huntingdonshire District Council | 11/2b, 11/8d and 11/9 | Required for the provision of soil storage areas. | Works Nos. 5, 12 and 13 | |
11/6b and 11/8a | Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the provision of ecological mitigation. | Works Nos. 5, 12 and 13 | ||
The land plans – sheet 12 | ||||
In the administrative area of Huntingdonshire District Council | 12/2a, 12/2c, 12/6b and 12/6c | Required for the provision of soil storage areas. | Works Nos. 5 and 13 | |
12/5b, 12/8b, and 12/10b | Required for the provision of soil storage areas and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | Works Nos. 5 and 13 | ||
12/11c and 12/13b | Required for the construction of a new private means of access and accommodation track. | Work No. 13 | ||
12/12a | Required for the construction of a new private means of access and to provide working space and temporary access for works associated with the construction of the new Ermine Street Junction. | Work No. 13 | ||
The land plans – sheet 13 | ||||
In the administrative area of Huntingdonshire District Council | 13/3b | Required for the provision of soil storage areas. | Works Nos. 5 and 14 | |
13/7 | Required to provide working space and temporary access for works associated with the improvement of Mere Way. | Work No.14 | ||
The land plans – sheet 14 | ||||
In the administrative area of Huntingdonshire District Council | 14/2b | Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land. | Works Nos. 5 and 15 | |
The land plans – sheet 15 | ||||
In the administrative area of Huntingdonshire District Council | 15/1a, 15/1b, 15/18a and 15/18e | Required to provide working space and temporary access for works associated with the stopping up of Conington Road and the construction of the new Conington Road. | Work No. 17 | |
15/11c | Required to provide working space and temporary access for works associated with the provision of ecological mitigation. | Works Nos. 5 and 16 | ||
15/9b, 15/11b and 15/16b | Required for the provision accommodation tracks. | Works Nos. 5 and 16 | ||
15/19a | Required to provide working space and temporary access for works associated with the provision of new private means of access. | Work No.17 | ||
The land plans – sheet 16 | ||||
In the administrative areas of Huntingdonshire District Council and South Cambridgeshire District Council | 16/1a, 16/1b, 16/1c, 16/1d and 16/1g | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
16/8a, 16/8b, 16/12b, 16/12c and 16/14c | Required for the works associated with the stopping up of Footpaths 87/6, 87/14 and 53/1. | Work No. 5 | ||
16/3c, 16/5b and 16/7b | Required for the construction of a new private means of access and accommodation track. | Work No. 17 | ||
16/3f | Required for working space and temporary access for the diversion of utility equipment. | Work No. 63 | ||
16/9b and 16/12d | Required for the construction of a new private means of access. | Work No. 17 | ||
16/21a, 16/21b and 16/22 | Required to provide working space and temporary access for works associated with the stopping up of Footpath 53/2. | Work No. 5 | ||
The land plans – sheet 17 | ||||
In the administrative area of South Cambridgeshire District Council | 17/1a, 17/1b, 17/1e and 17/1f. | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
In the administrative area of South Cambridgeshire District Council | 17/4d, 17/6. | Required to provide an ecological mitigation area. | Work No. 5 | |
The land plans – sheet 18 | ||||
In the administrative area of South Cambridgeshire District Council | 18/6e | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | |
The land plans – sheet 19 | ||||
In the administrative area of South Cambridgeshire Council | 19/10b, 19/11 and 19/12b | Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit comprising Work No. 4.12 and associated soil storage areas. | Work No. 4.12 | |
The land plans – sheet 20 | ||||
In the administrative area of South Cambridgeshire District Council | 20/2d, 20/3 and 20/4a | Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit 4.12 and associated soil storage areas. | Work No. 4.12 | |
20/5 | Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit Work No. 4.12 and associated soil storage areas, and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | ||
20/2b and 20/6b | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste. | All Works. | ||
20/13e and 20/13d | Required to provide working space and temporary access for the diversion of utility equipment on adjacent land. | Work Nos. 5, 71, 81 and 82 | ||
20/16b, 20/16c, 20/18a, 20/18b, 20/21b and 20/21c | Required to provide working space and temporary access for the works associated with the construction of the new footway, cycle track and equestrian track associated with the new Local Access Road. | Work No. 22 | ||
20/25d | Required to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land. | Work No. 5 | ||
The land plans – sheet 21 | ||||
In the administrative area of South Cambridgeshire District Council | 21/2b and 21/5a | Required to provide working space for works in connection with the diversion of pipes associated with the Sewage Works. | Work No. 72 | |
21/8b | Required for the provision of soil storage areas. | Work No. 5 | ||
21/10b | Required for the provision of soil storage areas. | Works No. 5 and 23 | ||
The land plans – sheet 22 | ||||
22/17e, 22/27d and 22/28c | Required to provide working space and temporary access for works associated with the construction of flood plain compensation areas on adjacent land. | Works Nos. 5 and 22 | ||
22/17d | Required for the provision of soil storage areas. | Works Nos. 5, 22 and 24 | ||
22/17f, 22/27b, and 22/28b | Required for the construction of a new private means of access. | Work Nos. 5 | ||
22/28d | Required to provide working space for works associated with the new Local Access Road. | Work No.22 | ||
The land plans – sheet 23 | ||||
In the administrative area of South Cambridgeshire District Council | 23/2b | Required for working space for the works associated with the protection of existing utilities. | Works Nos. 5 | |
23/10b | Required for the provision of soil storage areas. | Works Nos. 5, 25, and 26 | ||
23/8b, 23/8c and 23/13a | Required to enable the construction of a new private means of access to Hackers Fruit Farm. | Work No. 27 | ||
23/6b | Required to provide working space for the works associated with the construction of the new Cambridge Crematorium Access Road and new Local Access Road between Oakington Road and Huntingdon Road. | Work No. 27 | ||
23/14b | Required to enable the construction of a new private means of access to Cambridge Crematorium. | Work No. 27 | ||
23/20b | Required for working space for the works associated with the protection of existing utilities. | Work No. 26 | ||
The land plans – sheet 24 | ||||
In the administrative area of South Cambridgeshire District Council | 24/3b and 24/3c | Required for working space for the works associated with the protection of existing utilities. | Work No. 27 | |
24/3d, 24/3j and 24/3k | Required to provide working space for the works associated with the construction of the new Local Access Road between Oakington Road and Huntingdon Road. | Work No. 27 | ||
24/3g and 24/9a | Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste, and to provide working space for works associated with the construction of a new Local Access Road between Oakington Road and Huntingdon Road and the construction of drainage attenuation facilities. | All Works. | ||
24/7a | Required for working space for the works associated with the protection of existing utilities. | Work No. 26 | ||
24/10a | Required for the provision of soil storage areas. | Works No. 27 and 29 | ||
24/10e | Required for the works associated with the stopping up of Footpath 99/7. | Work No. 27 | ||
The land plans – sheet 25 | ||||
In the administrative area of South Cambridgeshire District Council | 25/2a | Required for the provision of soil storage areas. | Works No. 27 and 29 | |
25/7b | Required for working space for the works associated with the protection of existing of utilities. | Work No. 26 | ||
The land plans – sheet 26 | ||||
In the administrative area of South Cambridgeshire District Council | 26/2a | Required for working space for the works associated with the protection of existing utilities. | Work No. 26 | |
26/32b, 26/34a, 26/35, 26/36 and 26/37a | Required for the provision of soil storage areas and for working space for the works associated with the diversion of utilities. | Works Nos. 33 and 84 | ||
26/40b | Required to provide working space for the works associated with the improvement of Histon Junction and the diversion of utilities. | Works Nos. 33 and 86 | ||
The land plans – sheet 27 | ||||
In the administrative area of South Cambridgeshire District Council | 27/17a and 27/18b | Required to provide working space and temporary access for the works associated with the provision of new private means of access. | Work No. 33 | |
The land plans – sheet 28 | ||||
In the administrative area of South Cambridgeshire District Council | 28/2c and 28/7a | Required to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass and associated environmental mitigation. | Work No. 33 | |
28/1h and 28/8b | Required to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass including associated environmental mitigation and the diversion of utilities. | Works Nos. 33 and 87 | ||
The land plans – sheet 29 | ||||
None | - | - | - | |
The land plans – sheet 30 | ||||
In the administrative area of Huntingdonshire District Council | 30/1a, 30/1d, 30/1e, 30/1f and 30/1g | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 31 | ||||
In the administrative area of Huntingdonshire District Council | 31/1a, 31/1b, 31/1c, 31/1d, and 31/1e. | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 32 | ||||
In the administrative area of Huntingdonshire District Council | 32/1a, 32/1b, 32/1c, 32/1d, 32/1e, 32/1f, 32/1g, 32/1h, 32/1j, 32/1k, 32/1l, 32/1m, 32/1n, 32/1o, 32/1p, 32/1q, 32/1r, 32/1s, 32/1t, 32/1u, 32/1v, 32/2 and 32/3, 32/4 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, and between Huntingdon and Brampton Hut Interchange. | Work No. 5 | |
The land plans – sheet 33 | ||||
In the administrative area of Huntingdonshire District Council | 33/1b, 33/1e, 33/1f, 33/1g, 33/1h, 33/1j, 33/1k, 33/1l, 33/1m, 33/1n, 33/2, 33/3, 33/4, 33/5a, 33/5b, 33/6 and 33/7 | Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange. | Work No. 5 | |
The land plans – sheet 34 | ||||
In the administrative area of Huntingdonshire District Council | 34/1a, 34/1b, 34/1c, 34/1d, 34/1g, 34/1ah, 34/1aj and 34/1ak | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
34/1k, 34/1l, 34/1n, 34/1o, 34/1p, 34/4b, 34/4c, 34/25b, 34/31b and 34/32b | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, the stopping up of the A14(T) in Huntingdon and to provide working space and temporary access for works in connection with the demolition of the Huntingdon A14 viaduct. | Works Nos. 5, 35 and 36 | ||
34/49b, 34/55, 34/51b and 34/51c | Required to provide working space and temporary access for works associated with the construction of the new Mill Common Link Road and the improvement of the existing Mill Common Road. | Works Nos. 36 and 37 | ||
34/5b | Required to provide working space and temporary access for works associated with the construction of the new Views Common Link Road. | Work No. 34 | ||
34/5c, 34/10 and 34/11a | Required to provide working space for works associated with the construction of new private means of access to Cambridgeshire Constabulary HQ from the new Views Common Link Road. | Work No. 34 | ||
34/6b, 34/12 and 34/13 | Highway land required for improvement works to the Brampton Road to Hinchingbrooke Park Road Link. | Works Nos. 34 and 35 | ||
34/34c | Required to provide working space for the isolation of a gas main associated with the construction of the new Views Common Link. | Work No. 36 | ||
34/23 and 34/25f | Required to provide working space and temporary access for works associated with the improvement of B1514 Brampton Road. | Work No. 35 | ||
The land plans – sheets 35 | ||||
In the administrative area of Huntingdonshire District Council | 35/1a, 35/1b, 35/1c, 35/1d, 35/1e, 35/1f, 35/1g, 35/1h, 35/1j, 35/1k, 35/1l, 35/1m, 35/1n, 35/1o, 35/1p, 35/1q, 35/1r, 35/1s, 35/1t, 35/1u, 35/1v, 35/1w, 35/1x, 35/1y, 35/1z, 35/2, 35/3 35/4 and 35/5 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 36 | ||||
In the administrative area of Huntingdonshire District Council | 36/1a, 36/1b, 36/1c, 36/1d, 36/1e, 36/1f, 36/1g, 36/1h, 36/1j, 36/1l, 36/1m 36/1n and 36/1o, | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 37 | ||||
In the administrative area of Huntingdonshire District Council | 37/1a, 37/1b, 37/1c, 37/1d, 37/1e, 37/1f, 37/1g, 37/1h, 37/1j, 37/1k, 37/1l, 37/1m, 37/1n and 37/2 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 38 | ||||
In the administrative area of Huntingdonshire District Council | 38/1a, 38/1b, 38/1c, 38/1d, 38/1e, 38/1f, 38/1g, 38/1h, 38/1j, 38/1k, 38/1l, 38/1m, 38/1n, 38/1o and 38/2 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No. 5 | |
The land plans – sheet 39 | ||||
In the administrative area of Huntingdonshire District Council | 39/1a, 39/1b, 39/1c, 39/1d, 39/1e, 39/1g, 39/1h, 39/1j, 39/1k, 39/1l, 39/1m, 39/1n, 39/1o, 39/1p, 39/1q, 39/1r and 39/2 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No.5 | |
The land plans – sheet 40 | ||||
In the administrative areas of Huntingdonshire District Council and South Cambridgeshire District Council | 40/1a, 40/1b, 40/1c, 40/1e, 40/1f, 40/1g, 40/1h, 40/1j, 40/1k, 40/1l, 40/1m, 40/1n, 40/1o, 40/1p, 40/1q, 40/1s, 40/1t, 40/1u, 40/2, 40/3 and 40/4 | Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton. | Work No.5 | |
40/8, 40/12, 40/9a, 40/10b, 40/11b and 40/11c | Required for the works associated with the stopping up of Footpath 87/6 and 87/14. | Work No. 17 | ||
40/6d | Required for the construction of an accommodation track. | Work No.17 | ||
40/6f | Required for working space and temporary access for the diversion of utility equipment. | Work No.63 |