SCHEDULES

SCHEDULE 5LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Article 21

(1)

Plot reference number shown on land plans

(2)

Purpose for which rights over land may be acquired

(3)

Relevant part of the authorised development

Land Plans – Sheet 2

2/7 and 2/7a

To access Plot 2/4a that is to be temporarily acquired for use in connection with the construction of the authorised development.

All work elements

Land Plans – Sheet 3

3/3c

To construct, operate, access and maintain a new potable water supply for Northumbrian Water Limited.

Work No 2b

3/12

To construct, access and maintain a retaining wall.

Work No 1h

3/14a

To access plots 3/12, 3/12a and 3/3q in order to inspect and maintain the retaining wall and access plot 3/14 that is to be temporarily acquired for use in connection with the construction of the authorised development.

Work No 1h and Work No 1k

Land Plans – Sheet 4

4/3e and 4/3f

To construct, operate, access and maintain a new potable water supply station and a new foul sewer for Northumbrian Water Limited.

Work No 2b