SCHEDULES

SCHEDULE 1AUTHORISED DEVELOPMENT

Articles 2(1), 3 and 4

Within the Borough of Redcar and Cleveland, and the Borough of Stockton-on-Tees

Nationally Significant Infrastructure Project

Works No. 1 - within the area described on the works plans as Works No. 1—

1

dredging of approach channel and berth pocket; and

2

the demolition of the existing jetty and associated infrastructure

Works No. 2 - within the area described on the works plans as Works No. 2—

1

a quay (constructed within the quay limits and in 2 phases) being either—

a

a quay of solid construction comprising a quay wall and reclamation behind it on the south side of the River Tees; or

b

a quay of open construction comprising—

i

a suspended deck supported by piles and a revetment on a re-graded slope on the south side of the River Tees; and

ii

the erection of three approach bridge structures;

2

erection of ship loaders and associated infrastructure including ship loader rails;

3

erection of surge bins and transfer towers; and

4

extension, modification or replacement of pipe and provision of an additional pipe for flow control between Works No. 3 and Works No. 1.

Associated Development

Works No. 3 - within the area described on the works plans as Works No. 3—

1

the lagoon habitat enhancement works; and

2

extension, modification or replacement of pipe and provision of an additional pipe for flow control entering Works No. 2 from the lagoon.

Works No. 4 - within the area described on the works plans as Works No. 4—

1

2 parallel conveyors in a single housing (on supports and including transfer stations connected to the housing which are comprised in Works No. 5) to transfer polyhalite from the materials handling facility to the ship loaders and surge bins comprised in Works No. 2 running between the points A-B-C shown on the works plans.

Works No. 5 - within the area described in the works plans as Works No. 5 in connection with Works Nos. 1 to 4 and 6 to 11—

1

vehicular and pedestrian access;

2

construction space;

3

access for construction and maintenance;

4

conveyer footings and supports connecting with Works No. 4;

5

transfer towers connecting with Works No. 4;

6

surface and foul water disposal arrangements;

7

signage;

8

lighting;

9

security fencing and gating including the arrangements for maintaining access for owners of structures along the northern boundary of the Order limits shown on Document 3.16;

10

temporary acoustic fencing and visual screening;

11

CCTV;

12

services: and

13

security control (to the north-east of Works No. 10).

Works No. 6A - within the area described on the works plans as Works No. 6A—

1

temporary material storage and preparation and plant area;

2

temporary parking;

3

temporary offices;

4

temporary stores:

5

temporary lighting; and

6

temporary security fencing and gating.

Works No. 6B - within the area described in the works plans as Works No. 6B—

1

substation; and

2

car parking and screen fencing.

Works No. 7 - within the area described on the works plans as Works No. 7—

1

temporary material storage and preparation and plant area;

2

temporary parking;

3

temporary offices;

4

temporary stores;

5

temporary lighting; and

6

temporary security fencing and gating.

Works No. 8 - within the area described on the works plans as Works No. 8—

1

temporary material storage and preparation and plant area;

2

temporary parking;

3

temporary offices;

4

temporary stores:

5

temporary lighting; and

6

temporary security fencing and gating.

Works No. 9 - within the area described in the works plans as Works No. 9—

1

general services building;

2

parking;

3

substation;

4

below ground waste water storage tank; and

5

ancillary infrastructure including screen fencing.

Works No. 10 - within the area described on the works plans as Works No. 10—

1

temporary material storage and preparation and plant area;

2

temporary parking;

3

temporary offices;

4

temporary stores;

5

temporary lighting; and

6

temporary security fencing and gating.

Works No. 11 - within the area described on the works plans as Works No. 11—

1

temporary material storage and preparation and plant area;

2

temporary parking;

3

temporary offices;

4

temporary stores;

5

temporary lighting; and

6

temporary security fencing and gating.

Works No. 12 - within the area described on the works plans as Works No.12—

1

works to improve the western most arm of the A1085 roundabout the general arrangement of which is shown on the highway works plan including—

a

widening the carriageway;

b

construction of a new splitter island; and

c

reconstruction and resurfacing works.

Works Nos. 1 to 12 to be carried out in accordance with the parameters set out in the parameters table.

In connection with Works Nos. 1 to 12 such development within the Order limits but excluding the lagoon as may be necessary or expedient for the purposes of or in connection with the construction or use of the nationally significant infrastructure project and associated development described in Works Nos. 1 to 12, provided that such works do not give rise to any materially new or materially worse environmental effects in comparison with those assessed in the environmental statement or any updated environmental information supplied under the 2009 EIA Regulations.