SCHEDULES

Article 44

SCHEDULE 10E+W+SENVIRONMENTAL STATEMENT DOCUMENTS TO BE CERTIFIED

Document and description

the environmental statement contained in document reference 6.1

the figures accompanying the environmental statement contained in document reference 6.2 (subject to the substitutions set out below)

the appendices accompanying the environmental statement contained in document reference 6.3 (subject to the substitutions set out below)

the statement of statutory nuisances contained in document reference 6.4

the non-technical summary contained in document 6.5

the assessment of implications for European sites contained in document 6.6

the revised arboricultural implications assessment contained in document 341755-09-300-RE-003-A Revision D (which substitutes the arboricultural implications assessment contained in appendix 7.3 in document reference 6.3)

the revised figure 2.1 the main scheme contained in document HA514442-MMGJV-GEN-SMW-DE-Z-60201 Revision B (which substitutes figure 2.1 the main scheme contained in document reference 6.2)

the revised outline construction environmental management plan contained in document HA514442-MMGJV-GEN-SMW-RE-Z-631701 Revision B (which substitutes the outline construction environmental management plan contained in appendix 17.1 in document reference 6.3)

the revised flood risk assessment contained in document HA514442-MMGJV-GEN-SMW-RE-Z-631402 Revision B (which substitutes the flood risk assessment contained in appendix 14.2 in document reference 6.3)

the flood risk assessment summary contained in document HA514442-MMGJV-GEN-SMW-RE-Z-14401 Revision A

the flood risk assessment – depth and hazard mapping contained in document HA514442-MMGJV-GEN-SMW-RE-Z-15401 Revision A

the FRA – additional submission at deadline 8 contained in document HA514442-MMGJV-GEN-SMW-RE-Z-15501 Revision A

the environmental update report contained in document HA514442-MMGJV-GEN-SMW-RE-Z-101301

the arboricultural survey report contained document 341755-09-300-RE-02-E Revision E

the geophysical survey report contained in document J2780

the site location and overview of survey areas contained in document 2780 figure no. 01

the site plan showing location of survey grids and referencing contained in document 2780 figure no. 02

the plot of raw gradiometer data contained in document 2780 figure no. 03

the colour plot of raw gradiometer data showing extreme magnetic values contained in document 2780 figure no. 04

the plot of processed gradiometer data contained in document 2780 figure no. 05

the interpretation of gradiometer anomalies contained in document 2780 figure no. 06

the archaeological walkover survey, metal detecting and evaluation trenching report contained in document 86670.02

the site investigation report contained in document 15/2718 – FR 01

the minerals safeguarding assessment contained in document HWY/HDS/341755/TR010006

the environmental masterplan for the main scheme contained in documents HA514442-MMGJV-GEN-SMW-DE-Z-60213Revision E, HA514442-MMGJV-GEN-SMW-DE-Z-60214 Revision E, HA514442-MMGJV-GEN-SMW-DE-Z-60215 Revision C, HA514442-MMGJV-GEN-SMW-DE-Z-60216 Revision B, HA514442-MMGJV-GEN-SMW-DE-Z-60217 Revision B, HA514442-MMGJV-GEN-SMW-DE-Z-60218 Revision B and HA514442-MMGJV-GEN-SMW-DE-Z-60219 Revision D, all stated as Revision C at 26 May 2017 (which substitutes the environmental masterplan for the main scheme contained in figures 2.6a, 2.6b, 2.6c, 2.6d, 2.6e, 2.6f and 2.6g of document reference 6.2)

the environmental masterplan for the alternative scheme contained in documents HA514442-MMGJV-GEN-SMW-DE-Z-60220 Revision E, HA514442-MMGJV-GEN-SMW-DE-Z-60221 Revision E and HA514442-MMGJV-GEN-SMW-DE-Z-60222 Revision B, all stated as Revision C at 26 May 2017 (which substitutes figures 2.7a, 2.7b and 2.7c in the environmental masterplan for the alternative scheme contained in figures 2.7a, 2.7b, 2.7c, 2.7d, 2.7e, 2.7f and 2.7g of document reference 6.2)

the environmental masterplan update report for deadline 8 contained in document HA514442-MMGJV-GEN-SMW-RE-Z-13501 Revision A, stated as Revision C at 26 May 2017

the archaeological intrusive evaluation, written scheme of investigation contained in document HA514442-MMGJV-GEN-SMW-RE-Z-13901 Revision D

the traffic management plan draft contained in document HE514443-TW-TTM-00-RP-ZM-0001 Version 01