The North London Heat and Power Generating Station Order 2017

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Article 12

SCHEDULE 6PUBLIC RIGHTS OF WAY TO BE TEMPORARILY SUSPENDED

(1)

Area

(2)

Public right of way to be temporarily suspended

(3)

Extent of temporary suspension

(4)

Temporary new public right of way to be provided in substitution

In the London Borough of Enfield.The section of pavement on the north side of Advent Way within plots 30 and 31, as shown on the land plans, drawing C_0013 Rev 00 of the works plans and in more detail on diagram 1 on page 2 of the DCO Schedules 6-8 explanatory diagrams.

For approximately 41 metres on Advent Way and into the southern entrance to the Edmonton EcoPark.

Approximately 42 metres of temporary footpath in the area shown cross hatched at the southern exit entrance to the Edmonton EcoPark leading onto Advent Way as shown on drawing C_0013 Rev 00 of the works plans.

In the London Borough of Enfield.

The section of footpath and pavement running parallel with Advent Way to after the junction of Advent Way with Lee Park Way within plots 22, 24, 27, 28 and 29, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 2 on page 3 of the DCO Schedules 6-8 explanatory diagrams.

For approximately 130 metres within plots 27, 24, 28, 22 and 29 shown on the land plans and on drawing C_0014 Rev 01 of the works plans.Approximately 130 metres of temporary footpath in the area shown cross hatched bordering the northern edge of Advent Way and the southern section of Lee Park Way as shown on drawing C_0014 Rev 01 of the works plans.
In the London Borough of Enfield.The section of footpath and cycle path running from the junction of Advent Way with Lee Park Way and along Lee Park Way within plots 14, 15, 21, 22 and 32, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 3 on page 4 of the DCO Schedules 6-8 explanatory diagrams.For approximately 315 metres within plots 14, 15, 21, 22 and 32 from the junction of Advent Way with Lee Park Way and along Lee Park Way.Approximately 315 metres of temporary footpath and cycle path in the area shown cross hatched to the north of Advent Way and the east of the Edmonton EcoPark as shown on drawing C_0014 Rev 01 of the works plans.
In the London Borough of Enfield.Footpath leading from Lee Park Way to the tow path on the River Lee Navigation within plot 21, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 4 on page 5 of the DCO Schedules 6-8 explanatory diagrams.For approximately 41 metres at the point of the access to be constructed to the temporary laydown area from Lee Park Way towards the eastern bank of the River Lee Navigation (north of the bridge over the River Lee Navigation).Approximately 41 metres of temporary footpath in the area shown cross hatched to the north of Lee Park Way and the east of the River Lee Navigation on drawing C_0014 Rev 01 of the works plans.
In the London Borough of Enfield.Towpath, footpath and cycle path on the eastern bank of the River Lee Navigation within plots 13 and 17, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 5 on page 6 of the DCO Schedules 6-8 explanatory diagrams.For approximately 26 metres under the bridge over the River Lee Navigation forming part of Lee Park Way.

Approximately 201 metres of temporary footpath in the area shown on drawing C_0014 Rev 01 of the works plans.

In the London Borough of Enfield.Cycle path on Lower Hall Lane within plot 20, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 6 on page 7 of the DCO Schedules 6-8 explanatory diagrams.For approximately 59 metres across the part of Lower Hall Lane bordering the access from Lower Hall Lane to the temporary laydown area.Approximately 59 metres of temporary footpath in the area shown cross hatched across Lower Hall Lane leading to the junction with Walthamstow Avenue on drawing C_0014 Rev 01 of the works plans.
In the London Borough of Enfield.Cycle path running parallel with Advent Way to after the junction of Advent Way with Lee Park Way, within plots 17, 27, 24, 22 and 21, as shown on the land plans, drawing C_0014 Rev 01 of the works plans and in more detail on diagram 7 on page 8 of the DCO Schedules 6-8 explanatory diagrams.For approximately 131 metres across plots 17, 27, 24, 22, 21 on the land plans, running to the north of Advent Way, east of the tow path running along the western edge of the River Lee Navigation, cutting across Lee Park Way and towards Lower Hall Lane.Approximately 131 metres of temporary footpath in the area shown cross hatched across plots 17, 27, 24, 22, 21 on the land plans on the land to the east of the River Lee Navigation and north of Advent Way, as shown on drawing C_0014 Rev 01 of the works plans.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources