The Network Rail (Northumberland Park Level Crossing and Coppermill Lane Level Crossing Closure) Order 2017

Power to deviate

4.  In constructing or maintaining the work, Network Rail may—

(a)deviate laterally from the lines or situations shown on sheet 1 of the deposited plans to the extent of the limits of deviation for the work; and

(b)deviate vertically from the levels shown on the section—

(i)to any extent not exceeding 3 metres upwards; or

(ii)to any extent downwards as may be found to be necessary or convenient.