SCHEDULES

SCHEDULE 1E+WAUTHORISED DEVELOPMENT

In connection with and in addition to Works Nos. 1 to 7 and Work Nos. 9 and 10, further associated development including—

(o)surface water drainage systems, storm water attenuation systems including storage basins, oil water separators, including channelling and culverting and works to existing drainage systems;

(p)electrical, gas, potable water supply, foul water drainage and telecommunications infrastructure connections and works, and works to alter the position of such services and utilities connections;

(q)hard standing and hard landscaping;

(r)soft landscaping, including embankments and planting;

(s)biodiversity enhancement measures;

(t)security fencing, gates, boundary treatment and other means of enclosure;

(u)external lighting, including lighting columns;

(v)gatehouses and weighbridges;

(w)closed circuit television cameras and columns and other security measures;

(x)site establishment and preparation works, including site clearance (including vegetation removal, demolition of existing buildings and structures); earthworks (including soil stripping and storage and site levelling) and excavations; the creation of temporary construction access points; the alteration of the position of services and utilities; and works for the protection of buildings and land;

(y)temporary construction laydown areas and contractor facilities, including materials and plant storage and laydown areas; generators; concrete batching facilities; vehicle and cycle parking facilities; pedestrian and cycle routes and facilities; offices and staff welfare facilities; security fencing and gates; external lighting; roadways and haul routes; wheel wash facilities; and signage;

(z)vehicle parking and cycle storage facilities;

(aa)accesses, roads and pedestrian and cycle routes;

(bb)tunnelling, boring and drilling works;

(cc)and, to the extent that it does not form part of such works, further associated development comprising such other works (i) as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and (ii) which fall within the scope of the works assessed in the environmental statement.