The Eggborough Gas Fired Generating Station Order 2018

Changes over time for: SCHEDULE 8

 Help about opening options

Alternative versions:

Status:

Point in time view as at 12/10/2018.

Changes to legislation:

There are currently no known outstanding effects for the The Eggborough Gas Fired Generating Station Order 2018, SCHEDULE 8. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Article 20

SCHEDULE 8E+WLAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

InterpretationE+W

1.  In this schedule—

Work No. 4 infrastructure” means any works or development comprised within Work No. 4 in schedule 1, ancillary apparatus and including any other necessary works or development permitted within the area delineated as Work No. 4 on the works plans;

Work No. 5 infrastructure” means any works or development comprised within Work No. 5 in schedule 1, ancillary apparatus and including any other necessary works or development permitted within the area delineated as Work No. 5 on the works plans;

Work No. 6 infrastructure” means any works or development comprised within Work No. 6 in schedule 1, ancillary apparatus and including any other necessary works or development permitted within the area delineated as Work No. 6 on the works plans;

Work No. 9 infrastructure” means any works or development comprised within Work No. 9 in schedule 1, ancillary apparatus and including any other necessary works or development permitted within the area delineated as Work No. 9 on the works plans;

Table 10

(1) Number of plot shown on the land plans(2) Rights etc. which may be acquired
10For and in connection with the Work No. 5 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 5 infrastructure, together with the right to install, retain, use and maintain the Work No. 5 infrastructure, and a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 5 infrastructure, or interfere with or obstruct access from and to the Work No. 5 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
30For and in connection with the Work No. 9 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 9 infrastructure, together with the right to install, retain, use and maintain the Work No. 9 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 9 infrastructure, or interfere with or obstruct access from and to the Work No. 9 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
90, 125, 135, 165, 170, 175, 190, 195, 215, 250For and in connection with the Work No. 6 infrastructure within a corridor of up to 14m in width, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 6 infrastructure, or interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
90, 125, 135, 165, 170, 175, 190, 195, 215, 250For and in connection with the Work No. 4 infrastructure within a corridor of up to 14m in width, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
230For and in connection with the Work No. 4 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, boats, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water and a right to abstract water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing.
240, 245For and in connection with the Work No. 4 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, boats, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water and a right to discharge water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing.
255, 355, 360, 365, 380, 400, 420, 445, 490, 530, 540, 545, 555, 575, 595, 600For and in connection with the Work No. 6 infrastructure within a corridor of up to 14m in width the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 6 infrastructure, or interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
180, 200, 205, 210, 260, 265, 270, 275, 280, 285, 290, 295, 300, 305, 310, 315, 320For and in connection with the Work No. 4 infrastructure within a corridor of up to 14m in width the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
500, 510Right of access for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, along with the right to prevent any works on or uses of the land which may interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
515, 525Right for the undertaker and all persons authorised on its behalf to improve the access and a right to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, and a right to park vehicles, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure along with the right to prevent any works on or uses of the land which may interfere with or obstruct the right to park or access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
695Right for the undertaker and all persons authorised on its behalf to create a new access or improve an access, to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of Work No. 7 along with the right to prevent any works on or uses of the land which may interfere with or obstruct access from and to Work No. 7, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.

Table 10

(1) Number of plot shown on the land plans(2) Rights etc. which may be acquired
10For and in connection with the Work No. 5 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 5 infrastructure, together with the right to install, retain, use and maintain the Work No. 5 infrastructure, and a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 5 infrastructure, or interfere with or obstruct access from and to the Work No. 5 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
30For and in connection with the Work No. 9 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 9 infrastructure, together with the right to install, retain, use and maintain the Work No. 9 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 9 infrastructure, or interfere with or obstruct access from and to the Work No. 9 infrastructure, including the right to prevent or remove the whole of any fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
90, 125, 135, 165, 170, 175, 190, 195, 215, 250For and in connection with the Work No. 6 infrastructure within a corridor of up to 14m in width, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 6 infrastructure, or interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
90, 125, 135, 165, 170, 175, 190, 195, 215, 250For and in connection with the Work No. 4 infrastructure within a corridor of up to 14m in width, the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
230For and in connection with the Work No. 4 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, boats, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water and a right to abstract water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing.
240, 245For and in connection with the Work No. 4 infrastructure the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, boats, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water and a right to discharge water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing.
255, 355, 360, 365, 380, 400, 420, 445, 490, 530, 540, 545, 555, 575, 595, 600For and in connection with the Work No. 6 infrastructure within a corridor of up to 14m in width the right to create or improve accesses and a right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, together with the right to install, retain, use and maintain the Work No. 6 infrastructure, and a right of support for it, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 6 infrastructure, or interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
180, 200, 205, 210, 260, 265, 270, 275, 280, 285, 290, 295, 300, 305, 310, 315, 320For and in connection with the Work No. 4 infrastructure within a corridor of up to 14m in width the right for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery for all purposes in connection with the laying, installation, use and maintenance of the Work No 4 infrastructure, together with the right to install, retain, use and maintain the Work No. 4 infrastructure, a right of support for it, and the right to the free flow of water, along with the right to prevent any works on or uses of the land which may interfere with or damage the Work No. 4 infrastructure, or interfere with or obstruct access from and to the Work No. 4 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
500, 510Right of access for the undertaker and all persons authorised on its behalf to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure, along with the right to prevent any works on or uses of the land which may interfere with or obstruct access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
515, 525Right for the undertaker and all persons authorised on its behalf to improve the access and a right to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, and a right to park vehicles, for all purposes in connection with the laying, installation, use and maintenance of the Work No. 6 infrastructure along with the right to prevent any works on or uses of the land which may interfere with or obstruct the right to park or access from and to the Work No. 6 infrastructure, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.
695Right for the undertaker and all persons authorised on its behalf to create a new access or improve an access, to enter, pass and re-pass, on foot, with or without vehicles, plant and machinery, for all purposes in connection with the laying, installation, use and maintenance of Work No. 7 along with the right to prevent any works on or uses of the land which may interfere with or obstruct access from and to Work No. 7, including the right to prevent or remove the whole of any building, or fixed or moveable structure, tree, shrub, plant or other thing, and the right to prevent or remove any works or uses which alter the surface level, ground cover or composition of the land.

Back to top

Options/Help

Print Options

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources