Search Legislation

The Silvertown Tunnel Order 2018

Changes over time for: Section 5

 Help about opening options

Alternative versions:

Status:

Point in time view as at 31/05/2018.

Changes to legislation:

There are currently no known outstanding effects for the The Silvertown Tunnel Order 2018, Section 5. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Limits of deviationE+W+S

5.—(1) Subject to paragraph (2), TfL must construct the authorised development within the Order limits and, so far as all non-linear works comprised in the authorised development are concerned, within the limits of deviation for those works shown on the works plans.

(2) In constructing or maintaining the authorised development, TfL may deviate—

(a)laterally within the Order limits in the case of any linear work comprised in the authorised development, so that the centre line of that work may be situated up to 3 metres either side of the centre line of that work shown on the works plans; and

(b)vertically from the levels shown on the engineering section drawings and plans—

(i)to any extent upwards not exceeding 0.5 metres except in relation to the parts of the authorised development referred to in column (1) of the table below, where the extent of permitted deviation for each such part is set out in column (2) of that table; and

(ii)to any extent downwards as may be found to be necessary or convenient.

(1) Part of authorised development(2) Upwards vertical deviation limit
Work Nos. 1(a), 1(b), 1(c) and 1(e)

(1) Where any part of the authorised development referred to in column (1) is located below the bed of the river Thames, to any extent not exceeding 1.5 metres provided that the deviation would not result in the level of the bed within the navigable channel of the river Thames being above 5.80 metres below chart datum.

(2) Where any part of the authorised development referred to in column (1) is located elsewhere, to any extent not exceeding 3 metres.

(3) Without limitation on the scope of paragraph (1), in constructing or maintaining the authorised development TfL may—

(a)deviate by up to 3 metres from the points of commencement and termination of any linear work comprised in the authorised development shown on the works plans; and

(b)deviate from the design of any tunnel or tunnel structure and vary the number of tunnel cross-passages shown on the engineering section drawings and plans.

(4) In this article, reference to—

(a)a “linear work” is a reference to any work shown on the works plans by way of a centre line; and

(b)a “non-linear work” is a reference to any other work shown on the works plans.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources