- Latest available (Revised)
- Original (As made)
There are currently no known outstanding effects for the The Silvertown Tunnel Order 2018.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
Work No. 1 – shown on sheets 1, 2 and 3 of the works plans and being the construction of a twin bore highway tunnel for a length of 1,440 metres from a portal on the Greenwich peninsula in the Royal Borough of Greenwich, and passing beneath the river Thames, to a portal in Silvertown in the London Borough of Newham, to include—
(a)the construction of a section of cut and cover tunnel, between its portal on the Greenwich peninsula (the South Portal) and the tunnel-boring machine launch chamber located on the Greenwich peninsula, and comprising either a cellular tunnel or two tunnels, one for northbound traffic and one for southbound traffic with two-lane carriageways in each direction, and including the south portal and cross-passages connecting the two tunnels;
(b)the construction of a section of bored tunnel, comprising two tunnels, one for northbound traffic and one for southbound traffic, with two-lane carriageways in each direction, between the tunnel-boring machine launch chamber located in Silvertown and the tunnel-boring machine launch chamber located on the Greenwich peninsula, including cross-passages connecting the two tunnels;
(c)the construction of a section of cut and cover tunnel between its portal in Silvertown (the North Portal) and the tunnel-boring machine launch chamber located in Silvertown, and comprising either a single cellular tunnel or two tunnels, one for northbound traffic and one for southbound traffic with two-lane carriageways in each direction, and including the north portal and cross-passages connecting the two tunnels;
(d)the construction of an anti-recirculation wall at the South Portal;
(e)the construction of two tunnel-boring machine launch chambers, one in the London Borough of Newham (Silvertown) and one in the Royal Borough of Greenwich (Greenwich peninsula); and
(f)the construction (and subsequent removal on completion of construction of the authorised development) of a temporary decked car park situated on land lying between West Parkside and Millennium Way, and being required in consequence of the construction of Work Nos. 1 (a) and (d) (Greenwich peninsula) to provide replacement car parking facilities for the O2 Arena during construction of the authorised development.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: