Search Legislation

The Silvertown Tunnel Order 2018

 Help about what version

What Version

 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for: Paragraph 21

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Silvertown Tunnel Order 2018, Paragraph 21. Help about Changes to Legislation

A12 Blackwall Tunnel SouthboundE+W+S

21.  A length of existing highway proposed to be classified as the A12, commencing from a point at the North Portal of the existing Blackwall Tunnel Southbound, to a point at the South Portal of the existing Blackwall Tunnel Southbound, crossing the Borough boundary at the mid-point beneath the river Thames.

Identified by a green line on the classification of roads plans (classification).

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?