Search Legislation

The Silvertown Tunnel Order 2018

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

Changes over time for:

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Silvertown Tunnel Order 2018. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Note 2: Where existing speed limits (to be retained) are shown on the traffic regulation measures plans (speed limits and restricted roads) (sheets 1 to 4) which relate to Part 1 of this Schedule, this is for information only and such speed limits are not subject to this order.

Borough (1)Road name, number and length (2)Speed limit and restricted road status (3)
The traffic regulation measures plans (speed limits and restricted roads) sheet 1
Royal Borough of Greenwich

Silvertown Tunnel southern approach Southbound

A length of new highway from the south portal of the Silvertown Tunnel Southbound, in a generally south-easterly direction to a point where it merges with the existing A102 Blackwall Tunnel southern approach southbound.

Restricted road

Silvertown Tunnel southern approach Northbound

A length of new highway from its junction with the existing A102 Blackwall Tunnel southern approach northbound, in a generally northerly direction to the south portal of the Silvertown Tunnel Northbound.

Restricted road

Pavilion Lane (realigned)

A length of new highway from a point on the existing A102 Blackwall Tunnel southern approach Southbound 130 metres south of the existing Blackwall Tunnel Southbound South Portal, in a generally southerly direction then turning eastwards to its junction with the northbound carriageway of the existing Millennium Way, for a distance of 150 metres, and a length of new highway from a point on the northbound carriageway of the existing Millennium Way 75 metres to the north west of its junction with the existing Edmund Halley Way, in a generally southerly direction to its junction with the Silvertown Tunnel southern approach Northbound, for a distance of 215 metres.

Restricted road
The traffic regulation measures plans (speed limits and restricted roads) sheets 1 and 2
Royal Borough of Greenwich

Silvertown Tunnel

A length of new highway (tunnel) from the Borough boundary between the Royal Borough of Greenwich and the London Borough of Newham at the centre of the river Thames to the south portal of the Silvertown Tunnel southern approach along both the northbound and southbound carriageways of the tunnel.

Restricted road
The traffic regulation measures plans (speed limits and restricted roads) sheets 2 and 3
London Borough of Newham

Silvertown Tunnel

A length of new highway (tunnel) from the north portal of the Silvertown Tunnel northern approach to the Borough boundary between the Royal Borough of Greenwich and the London Borough of Newham at the centre of the river Thames, along both the northbound and southbound carriageways of the tunnel.

Restricted road
The traffic regulation measures plans (speed limits and restricted roads) sheet 3
London Borough of Newham

Silvertown Tunnel northern approach

A length of new highway from the point where Silvertown Tunnel northern approach meets Tidal Basin Roundabout in a generally south-easterly direction to the north portal of the Silvertown Tunnel along both the northbound and southbound carriageways.

Restricted road

Silvertown Way Off-Slip (Dedicated Left Turn)

A length of new highway from a point on the A1020 Silvertown Way off-slip 40 metres south-east of the Tidal Basin Roundabout initially in a north-westerly direction then turning in a southerly direction to a point where it joins the Silvertown Tunnel northern approach southbound.

Restricted road

Dock Road (realigned)

A length of new highway from the point where the realigned Dock Road meets Tidal Basin Roundabout, in a south easterly direction, for a distance of 430 metres.

Restricted road

Tidal Basin Roundabout

A length of the circulatory carriageway, including the north to south through link, from a point on the existing Tidal Basin Roundabout at the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way, and continuing in a generally south-westerly direction and then turning southwards and then turning eastwards to the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way.

Restricted road

Tunnel Services Compound Access Road (off realigned Dock Road)

A length of new highway from its junction with the realigned Dock Road (360 metres south-east from where Dock Road meets the new Tidal Basin Roundabout) in a generally north westerly direction, for a distance of 80 metres.

20 miles per hour

Removal of restricted road status

The traffic regulation measures plans (speed limits and restricted roads) sheet 4
London Borough of Tower Hamlets

Leamouth Circus Roundabout

The length of circulatory carriageway on the existing Leamouth Circus Roundabout.

Restricted road

Aspen Way (Westbound)

A length of existing highway from the point where Aspen Way westbound carriageway meets Leamouth Circus Roundabout in a westerly direction for 40 metres.

Restricted road

A1020 Leamouth Road

A length of existing highway from the point where A1020 Leamouth Road meets Leamouth Circus Roundabout in northerly direction for 150 metres along both the northbound and southbound carriageways.

Restricted road

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources