SCHEDULES

SCHEDULE 3E+W+SPERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS

PART 1 E+W+SHIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED

(1) Area(2) Highway to be stopped up(3) Extent of stopping up(4) New highway to be substituted/provided
The rights of way and access plans – sheet 1
In the administrative area of the Royal Borough of Greenwich; in the county of Greater LondonBoord Street and Dreadnought StreetA length from a point on the existing Boord Street 130 metres south-west of its junction with the existing Millennium Way to the existing Dreadnought Street, and then in a generally north westerly direction, for a total distance of 90 metres.

Reference A

To be substituted by a length of new highway from a point on Boord Street 130 metres south-west of its junction with the existing Millennium Way to the premises known as Studio 338, in a generally north westerly direction, for a distance of 80 metres.

Footbridge (including National Cycle Route No. 1 & Thames Path)The whole footbridge.

Reference B

To be substituted by a length of new Boord Street foot and cycle bridge from a point on Boord Street 140 metres south-west of its junction with the existing Millennium Way, in a generally south westerly direction, to its junction with the improved Tunnel Avenue.

Reference C

Silvertown Tunnel Southbound.

A length of new highway from the new Silvertown Tunnel South Portal, in a generally north-easterly direction to the new Silvertown Tunnel North Portal, for a distance of 1425 metres.

Reference D

Silvertown Tunnel Northbound.

A length of new highway from the new Silvertown Tunnel South Portal, in a generally south-westerly direction to the new Silvertown Tunnel North Portal, for a distance of 1405 metres.

Reference E

Silvertown Tunnel southern approach Southbound.

A length of new highway from the new South Portal of the Silvertown Tunnel, in a generally south easterly direction, for a distance of 160 metres.

Reference F

Silvertown Tunnel southern approach Northbound.

A length of new highway from its junction with the existing A102 Blackwall Tunnel southern approach northbound, in a generally north-easterly direction to the new South Portal of the Silvertown Tunnel, for a distance of 130 metres.

Reference G

Pavilion Lane (Realigned)

A length of new highway from a point on the existing A102 Blackwall Tunnel southern approach Southbound 130 metres south of the existing Blackwall Tunnel Southbound South Portal, in a generally southerly direction then turning eastwards to its junction with the northbound carriageway of the existing Millennium Way, for a distance of 150 metres.

Reference H

Pavilion Lane (Realigned)

A length of new highway from a point on the northbound carriageway of the existing Millennium Way 75 metres to the north west of its junction with the existing Edmund Halley Way, in a generally southerly direction to its junction with the Silvertown Tunnel southern approach Northbound, for a distance of 215 metres.

The rights of way and access plans – sheet 2

In the administrative areas of the Royal Borough of Greenwich and the London Borough of Newham; in the county of Greater London

Reference C – Refer to sheet 1

Reference D – Refer to sheet 1

The rights of way and access plans – sheet 3

In the administrative area of the London Borough of Newham; in the county of Greater London

Dock Road (including National Cycle Route No. 13 (part))A length from its junction with the existing Tidal Basin Roundabout, in a south westerly direction and then in a south easterly direction, for a total distance of 395 metres.

Reference A

To be substituted by a length of new highway from a point 110 metres west of the point where the existing A1020 Silvertown Way off-slip joins the Tidal Basin Roundabout, in a generally south-easterly direction, to a point where it joins the existing North Woolwich Road, for a distance of 430 metres.

Scarab Close (part)A length from its junction with the existing Dock Road in a south westerly direction, for a distance of 25 metres.

Reference A (part)

To be substituted in part by new highway (being part of the realigned Dock Road (Reference A)) from a point 110 metres west of the existing A1020 Silvertown Way off-slip, in a generally southerly direction, to a point where it joins the existing Scarab Close, for a distance of 55 metres.

Reference B

New left turn off-slip.

A length of new highway from a point on the existing A1020 Silvertown Way off-slip 40 metres south-east of the Tidal Basin Roundabout, initially in a north-westerly direction then turning in a southerly direction, to a point where it joins the Silvertown Tunnel northern approach Southbound, for a distance of 95 metres.

Reference C – Refer to sheet 1

Reference D – Refer to sheet 1

Reference E

Silvertown Tunnel northern approach Southbound.

A length of new highway from a point 70 metres west of the point where the existing A1020 Silvertown Way off-slip joins the Tidal Basin Roundabout, in a generally south-easterly direction to the new North Portal of the Silvertown Tunnel, for a distance of 205 metres.

Reference F

Silvertown Tunnel northern approach Northbound.

A length of new highway from the North Portal of the new Silvertown Tunnel, in a generally north-westerly direction to its junction with the new (part of the) Tidal Basin Roundabout, for a distance of 210 metres.

Reference G

A length of new highway from a point on the new Dock Road (realigned), 60 metres to the south-east of its tie-in with the North Woolwich Road, in a generally north westerly direction, for a distance of 80 metres.

Tidal Basin Roundabout (part)

(including National Cycle Route No. 13 (part))

A length from a point on the existing Tidal Basin Roundabout where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the northern side of the existing roundabout, in a generally south-easterly direction, and then in a southerly direction and then in an easterly direction, to a point where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the southern side of the existing roundabout.

Reference H (part)

To be substituted by a length of new highway from a point on the existing Tidal Basin Roundabout where the new Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the northern side of the existing roundabout, in a generally south-easterly direction, and then in a southerly direction and then in an easterly direction, to a point where the new Tidal Basin Roundabout passes under the existing A1011 Silvertown Way on the southern side of the existing roundabout, for a distance of 270 metres.

Reference H (part)

A length of new highway within the central island of the new part of Tidal Basin Roundabout from a point on the new Tidal Basin Roundabout 90 metres south west of the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way, in a generally south-easterly direction for a distance of 45 metres to a point where it joins the new Tidal Basin Roundabout at a point 95 metres south west of the centre point of where the existing Tidal Basin Roundabout passes under the existing A1011 Silvertown Way.