Search Legislation

The Renewable Heat Incentive Scheme Regulations 2018

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes over time for: Section 25

 Help about opening options

Alternative versions:

Changes to legislation:

There are currently no known outstanding effects for the The Renewable Heat Incentive Scheme Regulations 2018, Section 25. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Electricity metering in respect of ground source and air source heat pumps in respect of which the application for accreditation is made on or after 28th May 2014 and shared ground loop systemsE+W+S

This section has no associated Explanatory Memorandum

25.—(1) This regulation applies to any ground source heat pump or air source heat pump in respect of which an application for accreditation is made on or after 28th May 2014 and to shared ground loop systems.

(2) Where this regulation applies to a ground source heat pump or air source heat pump, the following meters must be installed—

(a)such electricity meters as will enable the seasonal performance factor of the heat pump to be determined to the satisfaction of the Authority;

(b)in the case of a ground source heat pump, where that heat pump is capable of simultaneous heating and cooling, such metering as will enable the heat drawn from the ground, including water in the ground, or from surface water, to be measured.

(3) Where this regulation applies to a shared ground loop system—

(a)paragraph (2)(a) applies in respect of each ground source heat pump which forms part of the shared ground loop system for which heat is required to be metered under regulation 24;

(b)where heat generated by a ground source heat pump which forms part of the shared ground loop system is not required to be metered under regulation 24, such electricity meters must be installed as will enable the electrical input into the ground source heat pumps to be metered;

(c)paragraph (2)(b) applies in respect of the ground loop where any of the ground source heat pumps which form part of the shared ground loop system is capable of simultaneous heating and cooling;

(d)where a ground source heat pump is installed in domestic premises—

(i)such electricity meters must be installed as will enable the measurement of the electrical input into—

(aa)any supplementary electric heater that is controlled by the same control system which governs the ground source heat pump; or

(bb)any immersion heater for a domestic hot water cylinder where the heater is controlled by the same control system which governs the ground source heat pump; and

(ii)any electricity meter installed in accordance with paragraph (i) which is not an on-board meter, must—

(aa)be properly calibrated;

(bb)be properly installed by, or under the responsibility of, a certified installer;

(cc)be in good working order; and

(dd)bear a label which identifies the ground source heat pump, supplementary electric heater or immersion heater being metered; and

(e)such electricity meters must be installed as will enable the electrical input into any ground loop circulation pump to be measured, and those which are not on-board meters must—

(i)be properly calibrated;

(ii)be properly installed;

(iii)be in good working order; and

(iv)bear a label which identifies the circulation pump being metered.

(4) An electricity meter installed in accordance with paragraph (3) in domestic premises must, except in the case of an on-board meter, meet the relevant requirements set out in Annex 1 to the Measuring Instruments Directive, the specific requirements listed in Annex V (Active electrical energy meters (MI-003)) to that Directive and the requirements for accuracy class A as defined in Annex V to that Directive.

(5) In this regulation, “on-board meter” means an electricity meter which is integrated into a ground source heat pump and is able to display the electricity consumption, in kWh, of the ground source heat pump, including where applicable, the electricity consumption of a ground loop circulation pump contained within it.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources